Mostrar el registro sencillo del ítem

dc.contributor.advisorMedina Carbajal, Lucio Sigifredo
dc.contributor.authorDíaz Medina, Paúl Alexander
dc.contributor.authorPaz Fernández, Nestor Fabiano
dc.creatorDíaz Medina, Paúl Alexander
dc.date.accessioned2023-01-25T22:11:35Z
dc.date.available2023-01-25T22:11:35Z
dc.date.issued2023
dc.identifier.urihttps://hdl.handle.net/20.500.12759/10196
dc.description.abstractEl presente trabajo de investigación se encuentra enfocado en la rama de gestión de proyectos de construcción, para su desarrollo se ha utilizado datos obtenidos del modelamiento hecho en el software Revit en un LOD 400 y Naviswork, el cual nos permite identificar interferencias entre las distintas especialidades involucradas en el proyecto del reservorio con capacidad de 2100 m3. Como bien se sabe gran parte de proyectos en la actualidad se vienen desarrollando con modelos tradicionales en AutoCAD, los cuales mantienen una secuencia: Diseño – Licitación – Construcción. En la etapa de diseño involucran a distintos especialistas, quienes hacen su presentación de planos a un nivel de detalle mínimo el cual complica la correcta interpretación por parte del profesional encargado de ejecutar el proyecto o en su defecto de los operarios pertinentes. Un error común son las deficiencias de diseño, que no son más que conflictos de coordinación entre las distintas especialidades que conforman un proyecto a su vez errores en los documentos contractuales lo cual genera la falta de constructibilidad. Es por ello que se plantea implementar la metodología BIM y desarrollando la construcción virtual real del proyecto a un LOD 400 (nivel de desarrollo). Donde identificaremos y reduciremos las deficiencias, haciendo un uso correcto de recursos logrando optimizar el modelo y así mejorar aspectos de constructibilidad, como es la aglomeración de acero en puntos críticos previamente identificados en el modelo estructural, como también la ubicación del encofrado y otros puntos de las distintas partidas. Una vez que se tienen identificados los puntos más críticos, se actualiza el modelo con todos los cambios realizados para que este tenga una correcta puesta en marcha. Reduciendo las deficiencias existentes y evitando las mermas no solo de material, sino de tiempo al momento de la ejecución del proyecto. El modelo BIM se puede tomar como el siguiente paso después del diseño asistido por computadora “CAD” en el cual nos muestra líneas, arcos, símbolos bidimensionales 2D para la representación de objetos, las cuales tenemos que interpretar. A diferencia de un software BIM en el cual nos muestra paralelamente viii la construcción en 3D de los elementos que conforman un proyecto de construcción, que a su vez depende del LOD en que se modelen los elementos contienen información tales como longitudes, volumen, área, peso, cantidades, material, etces_PE
dc.description.abstractThe present research work is focused on the construction project management branch, for its development data obtained from the modeling made in the Revit software in a LOD 400 and Naviswork has been used, which allows us to identify interferences between the different specialties. involved in the reservoir project with a capacity of 2,100 m3. As is well known, a large number of projects are currently being developed with traditional models in AutoCAD, which maintain a sequence: Design - Bidding - Construction. In the design stage they involve different specialists, who make their presentation of plans at a minimum level of detail which complicates the correct interpretation by the professional in charge of executing the project or, failing that, by the relevant operators. A common error is design deficiencies, which are nothing more than coordination conflicts between the different specialties that make up a project, in turn, errors in the contractual documents, which generates the lack of constructability. That is why it is proposed to implement the BIM methodology and develop the real virtual construction of the project at a LOD 400 (level of development). Where we will identify and reduce the deficiencies, making a correct use of resources, managing to optimize the model and thus improve constructability aspects, such as the agglomeration of steel in critical points previously identified in the structural model, as well as the location of the formwork and other points of the different games. Once the most critical points have been identified, the model is updated with all the changes made so that it has a correct start-up. Reducing existing deficiencies and avoiding losses not only in material, but also in time at the time of project execution. The BIM model can be taken as the next step after the computer aided design ““CAD““ in which it shows us lines, arcs, 2D two-dimensional symbols for the representation of objects, which we have to interpret. Unlike a BIM software in which it shows us in parallel the 3D construction of the elements that make up a construction project, which in turn depends on the LOD in which the elements are modeled, they contain information such as lengths, volume, area, weight , quantities, material, etc. x Keywords: BIM, LOD, Reservoir, constructabilityen_US
dc.description.uriTesises_PE
dc.formatapplication/pdfes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada Antenor Orrego - UPAOes_PE
dc.relation.ispartofseriesT_CIVIL_2193
dc.rightsinfo:eu-repo/semantics/openAccesses_PE
dc.rights.urihttps://creativecommons.org/licenses/by/4.0/es_PE
dc.sourceUniversidad Privada Antenor Orregoes_PE
dc.sourceRepositorio institucional - UPAOes_PE
dc.subjectRestricción del Crecimientoes_PE
dc.subjectIntrauterinoes_PE
dc.titleAplicación de la metodología BIM usando level of development en la ejecución de un reservorio de 2100m3 Chicama, La Libertades_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.grantorUniversidad Privada Antenor Orrego. Facultad de Ingenieríaes_PE
thesis.degree.nameIngeniero Civiles_PE
thesis.degree.disciplineIngeniería Civiles_PE
dc.subject.ocdehttp://purl.org/pe-repo/ocde/ford#2.01.00es_PE
renati.advisor.orcidhttps://orcid.org/0000-0001-5207-4421es_PE
renati.author.dni72524250
renati.author.dni71237202
renati.advisor.dni40534510
renati.typehttp://purl.org/pe-repo/renati/type#tesises_PE
renati.levelhttp://purl.org/pe-repo/renati/level#tituloProfesionales_PE
renati.discipline732016es_PE
renati.jurorDurand Orellana, Rocío del Pilar
renati.jurorGalicia Guarniz, William Conrad
renati.jurorGálvez Paredes., José Alcides
dc.publisher.countryPEes_PE


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(es)

Mostrar el registro sencillo del ítem

info:eu-repo/semantics/openAccess
Excepto si se señala otra cosa, la licencia del ítem se describe como info:eu-repo/semantics/openAccess