Mostrar el registro sencillo del ítem

dc.contributor.advisorLópez Carranza, Atilio Rubén
dc.contributor.authorDíaz Aliaga, Alex Francisco
dc.contributor.authorRoncal Chávez, Caroline Briggithe
dc.creatorDíaz Aliaga, Alex Francisco
dc.date.accessioned2024-01-15T20:04:15Z
dc.date.available2024-01-15T20:04:15Z
dc.date.issued2024
dc.identifier.urihttps://hdl.handle.net/20.500.12759/18151
dc.description.abstractLa investigación tuvo por objetivo determinar en qué medida el rendimiento de la mano de obra y maquinaria se desvió del estimado en la planificación de presupuesto, del mejoramiento y ampliación I.E Nuevo Amanecer, Otuzco. La muestra estuvo compuesta por las partidas de estructuras durante el desarrollo de la rehabilitación de la infraestructura de la I.E Nuevo Amanecer, Otuzco. Como instrumento se utilizó la ficha de observación donde se compara los rendimientos y costos presupuestados con los rendimientos y costos reales. Los resultados nos permiten concluir: Se determinó el rendimiento de mano de obra el mismo que fue en general del 95 % de lo presupuestado en el expediente, en el caso de la partida de acero el rendimiento real frente al presupuestado fue 4% mayor. En la partida de concreto el rendimiento real frente al presupuestado fue 29% mayor, en la partida de encofrado el rendimiento real frente al presupuestado fue del 85%, apreciándose que el rendimiento global estuvo muy cerca del planificado (95%), debido a que unas partidas compensaron el retraso de otras, y los retrasos debido a la pandemia, y aspectos contractuales de la administración pública. Respecto a los costos de mano de obra, para la partida de concreto se incrementaron 20%, para el concreto armado, se incrementaron en 37%, y para el acero se incrementaron en 9%, esto debido a que la mano de obra fue afectada por asuntos coyunturales, y se tuvo que acudir a concreto pre mezclado en algunos casos. Respecto a los costos de maquinaria, para la partida de se incrementaron en 7% para la partida de concreto armado 6% y para la partida de acero 2% esto debido a retrasos coyunturales de acceso ya que la obra está en vías urbanas muy concurridas que ocasionaba retrasos. Respecto a los costos unitarios, estos se incrementaron en 13% para la partida de concreto, 22% para la partida de concreto armado y 5% para la partida de acero por factores coyunturales de incremento de precios y costos logísticos post pandemiaes_PE
dc.description.abstractThe objective of the research was to determine to what extent the performance of labor and machinery deviated from the estimated budget planning for the improvement and expansion of Nuevo Amanecer School, Otuzco. The sample was composed of the items of structures during the development of the rehabilitation of the infrastructure of the Nuevo Amanecer School, Otuzco. The observation sheet was used as an instrument to compare the budgeted yields and costs with the actual yields and costs. The results allow us to conclude: In the case of the steel item, the actual performance compared to the budgeted one was 4% higher. In the case of concrete, the actual performance compared to the budgeted was 29% higher; in the case of formwork, the actual performance compared to the budgeted was 85%, showing that the overall performance was very close to the planned (95%), due to the fact that some items compensated for the delay of others, and the delays due to the pandemic, and contractual aspects of the public administration. Labor costs increased 20% for concrete, 37% for reinforced concrete, and 9% for steel, due to the fact that labor was affected by cyclical issues, and pre-mixed concrete had to be used in some cases. Machinery costs increased 7% for reinforced concrete, 6% for reinforced concrete and 2% for steel due to temporary access delays, since the project is located on busy urban roads, which caused delays. Unit costs increased by 13% for concrete, 22% for reinforced concrete, and 5% for steel due to price increases and post-pandemic logistics costses_PE
dc.description.uriTesises_PE
dc.formatapplication/pdfes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada Antenor Orregoes_PE
dc.relation.ispartofseriesT_CIVIL_2433
dc.rightsinfo:eu-repo/semantics/closedAccesses_PE
dc.rights.urihttps://creativecommons.org/licenses/by/4.0/es_PE
dc.subjectConstrucciónes_PE
dc.subjectMano de obraes_PE
dc.subjectrendimientoes_PE
dc.titleEvaluación del rendimiento de mano de obra y maquinaria en el mejoramiento y ampliación I.E 81996, caserío Nuevo Amanecer, Otuzco, La Libertades_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.grantorUniversidad Privada Antenor Orrego. Facultad de Ingenieríaes_PE
thesis.degree.nameIngeniero Civiles_PE
thesis.degree.disciplineIngeniería Civiles_PE
dc.subject.ocdehttp://purl.org/pe-repo/ocde/ford#2.01.00es_PE
renati.advisor.orcidhttps://orcid.org/0000-0002-3631-2001es_PE
renati.author.dni70017867
renati.author.dni77033421
renati.advisor.dni32965940
renati.typehttp://purl.org/pe-repo/renati/type#tesises_PE
renati.levelhttp://purl.org/pe-repo/renati/level#tituloProfesionales_PE
renati.discipline732016es_PE
renati.jurorVertiz Malabrigo, Manuel Alberto
renati.jurorPanduro Alvarado, Elka
renati.jurorVargas López, Segundo Alfredo
dc.publisher.countryPEes_PE


Ficheros en el ítem

Thumbnail
Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(es)

Mostrar el registro sencillo del ítem

info:eu-repo/semantics/closedAccess
Excepto si se señala otra cosa, la licencia del ítem se describe como info:eu-repo/semantics/closedAccess