Mostrar el registro sencillo del ítem

dc.contributor.advisorTerrones Romero, Julio Milton
dc.contributor.authorNúñez Castañeda, Elvis Manglio
dc.contributor.authorRodríguez Rojas, Nadia Katherine
dc.creatorNúñez Castañeda, Elvis Manglio
dc.date.accessioned2024-03-12T19:46:09Z
dc.date.available2024-03-12T19:46:09Z
dc.date.issued2024
dc.identifier.urihttps://hdl.handle.net/20.500.12759/23912
dc.description.abstractLa presenta investigación tiene como título planificación de requerimiento de materiales para incrementar el nivel de servicio en la empresa Inversiones Estans S.A.C, presenta un problema en el método de abastecimiento de materiales, esta falencia se produce por una inexistencia de un plan de requerimiento de materiales, para ello se recolectaron los datos proporcionados por la empresa, las cuales fueron trabajadas bajo la estructura que comprende un plan de requerimiento de materiales (MRP); iniciando la estructura se elaboró el plan agregado de producción (PAP) obteniendo en primera instancia el plan agregado con estrategia de inventario cero que representa el plan con el menor costo económico de S/14,410. Una vez obtenido estos datos se elaboró el plan maestro de producción (PMP), en esta sección el plan agregado de producción queda desglosado en planes semanales específicos de los productos ángulos y panales metálicos, posteriormente se elaboró el plan de requerimiento de materiales donde se detallan las necesidades brutas, los stocks disponibles, stock de seguridad y las necesidades netas, obteniendo como resultado final una plan de compras que permitirá generar las ordenes de compras para el aprovisionamiento de materiales al área de producción y evitar incumplimiento de pedidos a los clientes mejorando el nivel de servicioes_PE
dc.description.abstractThe title of this investigation is material requirement planning to increase the level of service in the company Inversiones Estans S.A.C, it presents a problem in the method of supplying materials, this shortcoming is caused by the non-existence of a material requirement plan, For this, the data provided by the company was collected, which was worked under the structure that includes a material requirement plan (MRP); Starting the structure, the aggregate production plan (PAP) was prepared, obtaining in the first instance the aggregate plan with a zero inventory strategy that represents the plan with the lowest economic cost of S/14,410. Once these data were obtained, the master production plan (PMP) was prepared. In this section, the aggregate production plan is broken down into specific weekly plans for angle products and metal honeycombs. Subsequently, the production requirement plan was prepared. materials where gross needs, available stocks, safety stock and net needs are detailed, obtaining as a final result a purchasing plan that will allow the generation of purchase orders for the supply of materials to the production area and avoid non-compliance with orders to customers by improving the level of servicees_PE
dc.description.uriTesises_PE
dc.formatapplication/pdfes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada Antenor Orregoes_PE
dc.relation.ispartofseriesT_IND_308
dc.rightsinfo:eu-repo/semantics/openAccesses_PE
dc.rights.urihttps://creativecommons.org/licenses/by/4.0/es_PE
dc.subjectPlanificación de requerimiento de materialeses_PE
dc.subjectnivel de servicioes_PE
dc.titlePlanificación de requerimientos de materiales para incrementar el nivel de servicio en la empresa INVERSIONES ESTANS SACes_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.levelTítulo Profesional
thesis.degree.grantorUniversidad Privada Antenor Orrego. Facultad de Ingenieríaes_PE
thesis.degree.nameIngeniero Industriales_PE
thesis.degree.disciplineIngeniería Industriales_PE
dc.subject.ocdehttp://purl.org/pe-repo/ocde/ford#2.11.04es_PE
renati.advisor.orcidhttps://orcid.org/0000-0003-2876-9746es_PE
renati.author.dni75674618
renati.author.dni46148129
renati.advisor.dni17805012
renati.typehttp://purl.org/pe-repo/renati/type#tesises_PE
renati.levelhttp://purl.org/pe-repo/renati/level#tituloProfesionales_PE
renati.discipline722026
renati.jurorMüller Solón, José Antonio
renati.jurorAnhuamán de la Rosa, Filiberto
renati.jurorChimoy Asto, Guillermo Enrique
dc.publisher.countryPEes_PE


Ficheros en el ítem

Thumbnail
Thumbnail
Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(es)

Mostrar el registro sencillo del ítem

info:eu-repo/semantics/openAccess
Excepto si se señala otra cosa, la licencia del ítem se describe como info:eu-repo/semantics/openAccess