dc.identifier.urihttps://hdl.handle.net/20.500.12759/4620
dc.description.abstractLa presente tesis tiene como objetivo principal evaluar la aplicación del método de Last Planner System en la construcción de edificaciones multifamiliares para determinar que si se puede obtener resultados favorables en la producción en la ciudad de Trujillo. Departamento la Libertad. Este estudio parte de los datos de producción obtenidos por la carta balance y método general en la construcción de Parque II California, donde nos refleja el trabajo productivo, trabajo contributorio y trabajo no contributorio que realizan las cuadrillas dentro de la obra; con los cuales más adelante utilizaremos para realizar el informe semanal de producción, el cual se enfoca su control en el consumo de Horas Hombre midiendo índices de Productividad; Las curvas de productividad se han obtenido de informes semanales de producción de una determinada cuadrilla, en estas se grafican los rendimientos presupuestados, los rendimientos diarios y acumulados. De acuerdo a la programación del Lookahead y la programación diaria se hace un análisis comparativo de ambos respectivamente, el cual será de la fecha 05/09/2018, con el fin de verificar con el cumplimiento o no de lo programado al inicio. Luego de obtener los resultados de la evaluación de la aplicación de Last Planner System, hemos realizados propuestas que las hemos aplicado para mejorar en algunos punto donde se encuentra por deficiencias. Al haber realizado las propuestas hemos notado una mejora con la productividad en la construcción del edificio multifamiliar Parque II.es_PE
dc.description.abstractThe main objective of this thesis is to evaluate the application of the Last Planner S ystem method in the construction of multifamily buildings to determine if it is possibl e to obtain favorable results in production, in the city of Trujillo. Liberty Department. This study starts from the production data obtained by the balance sheet and gener al method in the construction of Park II California, where it reflects the productive w ork, contributory work and non-contributory work performed by the crews within the work; with which later we will use to make the weekly report of production, which fo cuses its control on the consumption of Hours Man measuring indices of Productivit y, The productivity curves have been obtained from weekly reports of production of a certain group, in these the budgeted yields are plotted, the daily and accumulated returns. According to the programming of the Lookahead and the daily schedule a comparat ive analysis of both is made, respectively, which will be dated 05/09/2018, in order t o verify with the compliance or not of the programmed at the beginning. After obtaining the results of the evaluation of the application of Last Planner Syste m, we have made proposals that we have applied to improve in some point where it is due to deficiencies Having made the proposals we have noticed an improvement with the productivity i n the construction of the building multifamily Park II.en_US
dc.description.uriTesises_PE
dc.formatapplication/pdfes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada Antenor Orrego - UPAOes_PE
dc.relation.ispartofseriesT_ING.CIVIL_1683
dc.rightsinfo:eu-repo/semantics/openAccesses_PE
dc.sourceUniversidad Privada Antenor Orregoes_PE
dc.sourceRepositorio institucional - UPAOes_PE
dc.subjectLast Planner Systemes_PE
dc.subjectConstrucciónes_PE
dc.titleEvaluación de la aplicación del last planner system en la construcción de edificios multifamiliares, en Trujillo, la libertades_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.levelTítulo Profesionales_PE
thesis.degree.grantorUniversidad Privada Antenor Orrego. Facultad de Ingenieríaes_PE
thesis.degree.nameIngeniero Civiles_PE
thesis.degree.disciplineIngeniería Civiles_PE