Show simple item record

dc.contributor.advisorNarvaez Aranda, Ricardo Andres
dc.contributor.authorChavez Morán, Juan Ramiro
dc.contributor.authorCipiran Leon, Alisson Mariell
dc.creatorChavez Morán, Juan Ramiro
dc.date.accessioned2019-03-26T15:20:51Z
dc.date.available2019-03-26T15:20:51Z
dc.date.issued2019
dc.identifier.urihttps://hdl.handle.net/20.500.12759/4630
dc.description.abstractEsta investigación tiene como principal objetivo determinar la influencia del puente Chuquillanqui y terraplén de acceso del río Chuquillanqui, tramo puente Chuquillanqui, para ello se generaron diversos escenarios, para diferentes períodos de retorno en flujos no permanentes, los modelos que se generaron son con puente, que recrea la situación tal cual como se encuentra en la actualidad, el modelo sin puente, simula el comportamiento cuando retiramos el puente y terraplén de acceso, y el modelo propuesta, es nuestra propuesta de solución que consiste en retirar puente, terraplén de acceso y parte de topografía en los extremos, además se plantea la construcción de un puente largo de luz de 298.00 m, apoyado en 5 pilares y 2 estribos, la forma de los pilares se ha considerado elipsoide, pues según la literatura y las investigaciones son los que tienen un mejor comportamiento hidrodinámico. Se realizaron estudios de ingeniería, tales como el levantamiento topográfico en donde se encontró que el tramo aguas arriba del puente y terraplén de acceso entre las progresivas 0+000 – 0+805 tiene una pendiente de 2.035 %, y la pendiente en el tramo aguas abajo del puente y terraplén de acceso entre las progresivas 0+805 – 1+500 es 0.830 %. El material de fondo es una grava gruesa, tiene diámetro característico D 50 de 27.21 mm y su gravedad específica es 2.59. Los escenarios generados han sido considerando como períodos de retorno 5, 10, 25,50 y 100 años, tomando en consideración 5 instantes por hidrograma. Para los cálculos de la tensión de fondo y crítica se han usado los métodos de Meyer Peter Müller y Shields, en donde la tensión crítica, es decir la fuerza necesaria para la iniciación del movimiento es de 20.01 N/m 2, y el tirante necesario para iniciar el movimiento en el primer tramo es de 0.12 m, y en el segundo tramo es de 0.30 m. Como conclusión se obtuvo que el puente y terraplén de acceso si tienen una influencia significativa en la sedimentación del río Chuquillanqui, pues estos elementos han ido modificando la pendiente considerablemente aguas arriba como aguas abajo, con la propuesta se estima que el río recupere su pendiente de una manera natural con el transcurrir del tiempo.es_PE
dc.description.abstractThe main objective of this research is to determine the influence of the Chuquillanqui bridge and the Chuquillanqui river access embankment in the Chuquillanqui bridge section, we generated different scenarios, for different periods of return in non-permanent flows, the models that were generated with the bridge recreates the situation as it is currently, the model without bridge, simulates the behavior when we remove the bridge and access embankment, and the proposed model, is our proposed solution that consists of removing bridge, access embankment and part of the topography. In addition, we propose the construction of a long bridge with a light of 298.00 m, supported by 5 pillars and 2 abutments, the shape of the pillars has been considered ellipsoid, because according to literature and research, those are that have a better hydrodynamic behavior. Engineering studies were carried out, such as the topographic survey where it was found that the section upstream of the bridge and access embankment between the 0 + 000 - 0 + 805 progressives has a slope of 2.035%, and the slope in the waters section below the bridge and access embankment between the progressive 0 + 805 - 1 + 500 is 0.830%. The background material is a coarse gravel, has characteristic diameter D 50 of 27.21 mm and its specific gravity is 2.59. The generated scenarios have been considered as periods of return 5, 10, 25, 50 and 100 years, taking 5 instants per hydrogram to analyze. Meyer Peter Müller and Shields methods have been used for the calculations of the background and critical stress, where the critical tension, the force necessary for the initiation of the movement is 20.01 N / m2, and the necessary tension for start the movement in the first section is 0.12 m, and in the second section is 0.30 m. In conclusion, it was obtained that the bridge and access embankment do have a significant influence on the sedimentation of the Chuquillanqui River, since these elements have been modifying the slope considerably upstream as downstream, with the proposal it is estimated that the river will recover its natural slope with the passing of time.en_US
dc.description.uriTesises_PE
dc.formatapplication/pdfes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada Antenor Orrego - UPAOes_PE
dc.relation.ispartofseriesT_ING.CIVIL_1687
dc.rightsinfo:eu-repo/semantics/openAccesses_PE
dc.sourceUniversidad Privada Antenor Orregoes_PE
dc.sourceRepositorio institucional - UPAOes_PE
dc.subjectPuentees_PE
dc.subjectChuquillanquies_PE
dc.titleInfluencia del puente chuquillanqui y terraplen de acceso en la sedimentación del rio chuquillanqui, tramo puente chuquillanquies_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.levelTítulo Profesionales_PE
thesis.degree.grantorUniversidad Privada Antenor Orrego. Facultad de Ingenieríaes_PE
thesis.degree.nameIngeniero Civiles_PE
thesis.degree.disciplineIngeniería Civiles_PE


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record