Mostrar el registro sencillo del ítem

dc.contributor.advisorCerna Sánchez, Eduardo Elmer
dc.contributor.authorCalvo Neira, Juan Francisco
dc.creatorCalvo Neira, Juan Francisco
dc.date.accessioned2015-05-29T14:02:49Z
dc.date.available2015-05-29T14:02:49Z
dc.date.issued2015
dc.identifier.urihttps://hdl.handle.net/20.500.12759/806
dc.description.abstractEl presente trabajo trata acerca del estudio de la mejora en la disponibilidad del turbogenerador Escher Wyss mediante un sistema de monitoreo basado en PLC para la Empresa Trupal S.A. ubicada en la zona costera del Departamento de La Libertad, Provincia de Ascope. En principio se brinda el diseño de investigación y la justificación del estudio, para luego presentar la base teórica que permita comprender los criterios asociados a la planificación mediante el uso de PLC. Una vez presentados los conceptos más importantes se procede a detallar la problemática del Turbogenerador Escher Wyss y establecer los requerimientos iniciales para luego profundizar el estudio, de manera que se pueda presentar las consideraciones complementarias. Al final del trabajo se realiza una estimación de los costos asociados a la implementación del proyecto y se presentan las tablas comparativas con las diferencias entre el número de fallas y disponibilidad antes y después del sistema de monitoreo basado en PLC y se discute si los resultados obtenidos son buenos o malos, qué éxito ha tenido y si hay tendencias de mejora.es_PE
dc.description.abstractThis paper deals with the study of the improved availability of turbogenerator Escher Wyss by a monitoring system based on PLC for Trupal Company SA located in the coastal zone of the Department of La Libertad, Province of Ascope. In principle the research design and rationale of the study, and present the theoretical basis for understanding the criteria associated with planning using PLC is provided. After presenting the most important concepts we proceed to detail the problems of turbogenerator Escher Wyss and establish the initial requirements and then further study, so that you can submit additional considerations. At the end of work an estimate of the costs associated with project implementation is done and comparative tables present the differences between the number of faults and availability before and after monitoring system based on PLC and discussed whether the results obtained they are good or bad, what success has had and whether improvement trends.en_US
dc.description.uriTesises_PE
dc.formatapplication/pdfes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada Antenor Orrego - UPAOes_PE
dc.rightsinfo:eu-repo/semantics/openAccesses_PE
dc.sourceUniversidad Privada Antenor Orregoes_PE
dc.sourceRepositorio institucional - UPAOes_PE
dc.subjectMejora disponibilidades_PE
dc.subjectTurbogeneradores_PE
dc.subjectSistema basado PLCes_PE
dc.titleEstudio de la mejora en la disponibilidad del turbogenerador escher wyss de la empresa trupal s.a. mediante un sistema de monitoreo basado en PLCes_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.levelTítulo Profesionales_PE
thesis.degree.grantorUniversidad Privada Antenor Orrego. Facultad de Ingenieríaes_PE
thesis.degree.nameIngeniero Electrónicoes_PE
thesis.degree.disciplineIngeniería Electrónicaes_PE


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(es)

Mostrar el registro sencillo del ítem