Mostrar el registro sencillo del ítem

dc.contributor.advisorTerrones Romero, Julio Milton
dc.contributor.authorArias Diaz, Khristen Miluska Marina
dc.contributor.authorLizarraga Rodriguez, Andi Gianmarco
dc.creatorArias Diaz, Khristen Miluska Marina
dc.date.accessioned2021-12-07T15:14:46Z
dc.date.available2021-12-07T15:14:46Z
dc.date.issued2021
dc.identifier.urihttps://hdl.handle.net/20.500.12759/8364
dc.description.abstractLa presente investigación tiene como objetivo principal calcular los tiempos de manufactura de las prendas de vestir joggers que permitan encontrar el mejor nivel de operación (capacidad) de la empresa Danpar EIRL, considerando que no cuentan con el tiempo estándar de fabricación con los recursos que cuenta actualmente la empresa. La investigación es de nivel aplicada y descriptiva y el diseño de contrastación se considera no experimental transversal. Considera la población las diversas líneas de producción de la planta y la muestra seleccionada es la línea de producción de joggers y que presenta una mayor problemática. En el primer objetivo se pudo establecer la existencia de 20 actividades que conforman todo el proceso, las cuales fueron cronometradas según el desempeño de los trabajadores. Para el segundo objetivo se evaluó el ritmo de trabajo de los 5 empleados descubriendo que todos ellos están por encima del promedio (1.0) y en cuanto a los suplementos laborales se determinó que estos eran del 12%. En el tercer objetivo, al añadir las holguras al tiempo normal, se determinó que el tiempo estándar de la fabricación de un jogger equivale a 3.15 horas. Para culminar, en el último objetivo se usó el tiempo total productivo y el tiempo estándar para hallar que la capacidad de planta de la línea de producción de jogger era de 70 unidades semanales. Esta información es importante para la toma de decisiones y que permite evitar gastos innecesarios ascendentes a S/ 15,440 durante un año. Se concluye que la capacidad de la planta es un indicador de influencia directa en la rentabilidad de la empresa que permite tomar mejores decisiones y planificar adecuadamente las operaciones.es_PE
dc.description.abstractThe main objective of this research is to determine the times in the manufacture of joggers to find the plant capacity of the Danpar EIRL company since today there is no knowledge of how many units can be produced with the resources it has. The research is applied-descriptive level and has a cross-sectional nonexperimental contrast design. The population is all the production lines of the company, and the selected sample was the joggers production line as it is the one that presents the most problems. In the first objective, it was possible to establish the existence of 20 activities that make up the entire process, which were timed according to the performance of the workers. For the second objective, the work rhythm of the 5 employees was evaluated, discovering that all of them are above the average (1.0) and in terms of labor supplements, it was determined that these were 12%. In the third objective, by adding the clearances to the normal time, it was determined that the standard time of the manufacture of a jogger is equivalent to 3.15 hours. To conclude, in the last objective, the total productive time and the standard time were used to find that the plant capacity of the jogger production line was 70 units per week. This data was essential for making decisions and profits to avoid unnecessary expenses amounting to S / 15,440 in a period of one year. It is concluded that the plant capacity directly influences the profitability of a company since it allows better decisions to be made and the operations planned adequately.en_US
dc.description.uriTesises_PE
dc.formatapplication/pdfes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada Antenor Orrego - UPAOes_PE
dc.relation.ispartofseriesT_ING.IND_162
dc.rightsinfo:eu-repo/semantics/openAccesses_PE
dc.rights.urihttps://creativecommons.org/licenses/by/4.0/es_PE
dc.sourceUniversidad Privada Antenor Orregoes_PE
dc.sourceRepositorio Institucional - UPAOes_PE
dc.subjectCapacidad de plantaes_PE
dc.subjectEstudio de tiemposes_PE
dc.subjectSuplementos laborales u holgurases_PE
dc.subjectRentabilidades_PE
dc.titleDeterminación de los tiempos en la fabricación de joggers para encontrar la capacidad de planta de la empresa Danpar EIRL 2020es_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.grantorUniversidad Privada Antenor Orrego. Facultad de Ingenieríaes_PE
thesis.degree.nameIngeniero Industriales_PE
thesis.degree.disciplineIngeniería Industriales_PE
dc.subject.ocdehttp://purl.org/pe-repo/ocde/ford#2.11.04es_PE
renati.advisor.orcidhttps://orcid.org/0000-0003-2876-9746es_PE
renati.author.dni78481910
renati.author.dni70173594
renati.advisor.dni17805012
renati.typehttp://purl.org/pe-repo/renati/type#tesises_PE
renati.levelhttp://purl.org/pe-repo/renati/level#tituloProfesionales_PE
renati.discipline722026es_PE
renati.jurorLanderas Pilco, Maria Isabel
renati.jurorRosa Anhuaman, Filiberto de la
renati.jurorVelazquez Contreras, Segundo
dc.publisher.countryPEes_PE


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(es)

Mostrar el registro sencillo del ítem

info:eu-repo/semantics/openAccess
Excepto si se señala otra cosa, la licencia del ítem se describe como info:eu-repo/semantics/openAccess