Título : Propuesta de un sistema contractual HV contratistas S.A para subcontratos en la empresa Ingenieros Civiles y contratistas generales S.A para la disminucion de costos de operación
Autor : Chilon Velasquez, Anita
Macedo Lupo, Alexandra Jennifer
Asesor: Vargas Cardenas, Carlos Manuel
Palabras clave : Subcontratos
Disminucion de Costos
Fecha de publicación : 8-nov-2016
Institución : Universidad Privada Antenor Orrego - UPAO
Resumen : La presente investigación tuvo como propósito proponer un sistema contractual corporativo en la empresa Ingenieros Civiles y Contratistas Generales S.A. (ICCGSA) de manera consistente, ordenada, trazable, normalizada y por lo tanto confiable; permitiendo que el proyecto disponga oportunamente de las mejores alternativas para la disminución de costos de operación, el cual se elaboró durante el periodo de Marzo - Junio del 2015. El estudio de investigación es de tipo aplicado y de nivel cuantitativo – cualitativo ( métodos mixtos ) La población en estudio estuvo constituida por 28 profesionales del área de Gerencia de Operaciones que pertenecen a la empresa ICCGSA; para la recolección de datos se aplicó encuestas y entrevistas de acuerdo al Proceso de Gestión de Subcontratos de la empresa antes mencionada, perteneciente a la Gerencia de Operaciones. Después de aplicar la simulación propuesta, observamos que el Sistema Contractual (ICCGSA S.A.) genera un 53.76% de tiempo más de lo programado y el Sistema Contractual (Propuesto) sólo genera un 9.68%. Se concluye que la propuesta de un sistema contractual HV Contratistas S.A. para subcontratos en la empresa ICCGSA disminuye los costos de operación.
"The present investigation had as a purpose, propose a different Corporate System in the company “Ingenieros Civiles y Contratistas Generales“ S.A. (ICCGSA) with a consistent, accurate, traceable, standardized and therefore reliable system; allowing that the project could arrange time and the best alternatives to reduce operating cost. This system was developed during March to June 2015. The research study is the type applied and quantitatively - qualitative (mixed methods), as defined by Hernández Sampieri and Mendoza(2008) . The population that we considered was consisted of 28 professionals in the area of Management Operations in the company ICCGSA. For data collection, we applied surveys and interviews according to the Process Management Subcontracts, belonging to Management Operations. After the simulation, we observed that the contract system (ICCGSA) generates a 53.76% more time than scheduled and the Contract System (Proposed) generates only 9.68%. It is concluded that the proposal of a contractual system HV Contratistas S.A. for the company subcontracts ICCGSA S.A. lowers operating costs."
URI : http://repositorio.upao.edu.pe/handle/upaorep/2052
Otros identificadores : T_ING.CIVIL_1343
Aparece en las colecciones: Ingeniería Civil

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
RE_ING.CIVIL_ANITA.CHILON_ALEXANDRA.MACEDO_PROPUESTA.CONTRACTUAL.DISMINUCION.DE.COSTOS_DATOS_T046_46448130T.PDFANITA.CHILON_ALEXANDRA.MACEDO_PROPUESTA.CONTRACTUAL.DISMINUCION.DE.COSTOS13,89 MBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.