Mostrar el registro sencillo del ítem

dc.contributor.advisorLuján Silva, Enrique Francisco
dc.contributor.authorOcampo Calderón, Cynthia Jullissa
dc.creatorOcampo Calderón, Cynthia Jullissa
dc.date.accessioned2023-01-09T19:50:05Z
dc.date.available2023-01-09T19:50:05Z
dc.date.issued2023
dc.identifier.urihttps://hdl.handle.net/20.500.12759/10033
dc.description.abstractEn la presente investigación se realizó aplicando la metodología BIM para obtener el modelo BIM 3D y la planificación 4D usando los softwares Revit y Navisworks ambos en la versión 2019, aplicando esta metodología. Y como los planos del proyecto estaban incompletos eso ocasionó una serie de interferencias. La información del diseño al no ser clara y precisa ocasionó que se produjeran errores al momento de modelar debido a que los planos en 2D no estaban sincronizados entre las diferentes especialidades teniendo como resultados fallas en los costos y duración del proyecto. Con los cambios de las metodologías que se tiene hoy en día hay formas de trabajo que podemos usar mediante el criterio que se obtiene por experiencia la cual nos puede permitir optimizar los costes de obra y tareas re hechos en obra, una de esas metodologías es el Last Planner que con el modelo 3D optimizado al aplicarse con Lean (tiempo), más la sincronización con el Navisworks para la planificación y simulación del proceso constructivo del proyecto, podemos concluir que la planificación 4D nos permite lograr un control más eficiente en la gestión del proyecto BIM. Al tener la construcción virtual del proyecto (pre construcción), generamos las interferencias en etapas de diseño antes de su ejecución que en el sistema tradicional usando proyectos CAD 2D no se podría lograr, asimismo con la planificación Lean basado en la sectorización obtenemos un proyecto más organizado evitando las fallas en la ejecución y etapa de diseño, como resultado final se contrastará el Modelo BIM con el Modelo LEAN y se gestionará la información a fin de obtener la Simulación 4D del Proyecto en Mención.es_PE
dc.description.abstractIn the present research, it was carried out applying the BIM methodology to obtain the 3D BIM model and the 4D planning using the Revit and Navisworks software, both in the 2019 version, applying this methodology. And since the project plans were incomplete, that caused a series of interferences. The design information, not being clear and precise, caused errors to occur at the time of modeling due to the fact that the 2D plans were not synchronized between the different specialties, resulting in failures in the costs and duration of the project. With the changes in the methodologies that we have today, there are ways of working that we can use through the criteria obtained by experience which can allow us to optimize the costs of work and tasks re-done on site, one of these methodologies is the Last Planner that with the optimized 3D model when applied with Lean (time), plus the synchronization with Navisworks for the planning and simulation of the construction process of the project, we can conclude that 4D planning allows us to achieve a more efficient control in the management of the project. BIM project. By having the virtual construction of the project (pre construction), we generate interferences in design stages before its execution that in the traditional system using 2D CAD projects could not be achieved, also with lean planning based on sectorization we obtain a project more organized avoiding failures in the execution and design stage, as a final result the BIM Model will be contrasted with the LEAN Model and the information will be managed in order to obtain the 4D Simulation of the Project in questionen_US
dc.description.uriTesises_PE
dc.formatapplication/pdfes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada Antenor Orrego - UPAOes_PE
dc.relation.ispartofseriesT_CIVIL_2175
dc.rightsinfo:eu-repo/semantics/openAccesses_PE
dc.rights.urihttps://creativecommons.org/licenses/by/4.0/es_PE
dc.sourceUniversidad Privada Antenor Orregoes_PE
dc.sourceRepositorio institucional - UPAOes_PE
dc.subjectMetodología BIMes_PE
dc.titleAplicación de metodología BIM para la optimización y detención de interferencias en una vivienda Unifamiliar en el distrito de Juanjuí - Departamento San Martín, 2020es_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.grantorUniversidad Privada Antenor Orrego. Facultad de Ingenieríaes_PE
thesis.degree.nameIngeniero Civiles_PE
thesis.degree.disciplineIngeniería Civiles_PE
dc.subject.ocdehttp://purl.org/pe-repo/ocde/ford#2.01.00es_PE
renati.advisor.orcidhttps://orcid.org/0000-0001-8960-8810es_PE
renati.author.dni71507360
renati.advisor.dni18888927
renati.typehttp://purl.org/pe-repo/renati/type#tesises_PE
renati.levelhttp://purl.org/pe-repo/renati/level#tituloProfesionales_PE
renati.discipline732016es_PE
renati.jurorVargas López, Segundo Alfredo
renati.jurorVertiz Malabrigo, Manuel Alberto
renati.jurorHenríquez Ulloa, Juan Paul
dc.publisher.countryPEes_PE


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(es)

Mostrar el registro sencillo del ítem

info:eu-repo/semantics/openAccess
Excepto si se señala otra cosa, la licencia del ítem se describe como info:eu-repo/semantics/openAccess