Estudio de tiempos y movimientos para mejorar la productividad de la línea de producción de postes en la empresa POSTES DEL NORTE S.A
dc.contributor.advisor | Landeras Pilco, María Isabel | |
dc.contributor.author | Peña Juárez, Anghela Paola | |
dc.creator | Peña Juárez, Anghela Paola | |
dc.date.accessioned | 2023-01-11T13:18:31Z | |
dc.date.available | 2023-01-11T13:18:31Z | |
dc.date.issued | 2023 | |
dc.identifier.uri | https://hdl.handle.net/20.500.12759/10053 | |
dc.description.abstract | El presente trabajo de investigación tiene como propósito mejorar la productividad de la línea de producción de postes en la empresa Postes del Norte S.A. con un estudio de tiempos y movimientos ubicada en Postes del Norte S.A. Lote 1 predio Mundaca km 6.5 car. Piura – Catacaos, Piura. En el estudio de método y tiempos se realizó el diagnóstico inicial con respecto a los tiempos de los procesos de construcción de rondanas trabajos preliminares, armado de estructuras, producción, centrifugado, secado y desmoldado, y acabado, así como también se identificó las actividades productivas e improductivas. Se aplicó la estandarización de tiempos, mantenimiento predictivo y se propuso opciones de mejora para disminuir el cuello de botella y aumentar la productividad de la línea de producción de postes en la empresa Postes del Norte S.A Se empleó el análisis documental del historial de los procesos, aplicaciones de celular para toma de tiempos, videograbaciones y Excel para el procesamiento de datos De esta manera el estudio de tiempos y movimientos de la línea de producción de postes en la empresa Postes del Norte S.A., determinó que la productividad de la situación actual del proceso es de 2.463 postes por hora con una pérdida de 195 postes al año y la productividad después de realizar las propuesta de mejora es de 2.805 postes por hora sin unidades perdidas, en la que se incrementa la productividad en un 13.888%; llegando a validarse la hipótesis por medio de SPSS 25 de que con un estudio de tiempos y movimientos se mejora la productividad de la línea de producción de postes en la empresa Postes del Norte S.A. Finalmente se evaluó económicamente obteniéndose un VAN de S/ 47,243.63 en 3 años con una TIR del 135.13% y un beneficio costo de 2.832, que indica que por cada sol invertido en la propuesta de mejora, se genera 1.832 soles de beneficio | es_PE |
dc.description.abstract | The purpose of this research work is to improve the productivity of the pole production line in the company Postes del Norte S.A. with a study of times and movements located in Postes del Norte S.A. Lot 1 Mundaca property km 6.5 car. Piura-Catacaos, Piura. In the study of method and times, the initial diagnosis was made regarding the times of the construction processes of washers, preliminary work, assembly of structures, production, centrifugation, drying and demolding, and finishing, as well as the productive activities were identified. and unproductive. The standardization of times, predictive maintenance was applied, and improvement options were proposed to reduce the bottleneck and increase the productivity of the pole production line in the company Postes del Norte S.A. Documentary analysis of the history of the processes, cell phone applications for time taking, video recordings and Excel for data processing were used. In this way, the study of times and movements of the pole production line in the company Postes del Norte SA, determined that the productivity of the current situation of the process is 2,463 poles per hour with a loss of 195 poles per year and the productivity after making the improvement proposals is 2,805 posts per hour without lost units, in which productivity increases by 13,888%; reaching the validation of the hypothesis through SPSS 25 that with a study of times and movements the productivity of the pole production line in the company Postes del Norte S.A. is improved. Finally, it was economically evaluated, obtaining a NPV of S/ 47,243.63 in 3 years with an IRR of 135.13% and a cost benefit of 2,832, which indicates that for each sol invested in the improvement proposal, 1,832 soles of benefit is generated. | en_US |
dc.description.uri | Tesis | es_PE |
dc.format | application/pdf | es_PE |
dc.language.iso | spa | es_PE |
dc.publisher | Universidad Privada Antenor Orrego | es_PE |
dc.relation.ispartofseries | T_IND_227 | |
dc.rights | info:eu-repo/semantics/openAccess | es_PE |
dc.rights.uri | https://creativecommons.org/licenses/by/4.0/ | es_PE |
dc.source | Universidad Privada Antenor Orrego | es_PE |
dc.source | Repositorio Institucional - UPAO | es_PE |
dc.subject | Estudio Tiempos y Movimientos | es_PE |
dc.subject | Mantenimiento Predictivo | es_PE |
dc.title | Estudio de tiempos y movimientos para mejorar la productividad de la línea de producción de postes en la empresa POSTES DEL NORTE S.A | es_PE |
dc.type | info:eu-repo/semantics/bachelorThesis | es_PE |
thesis.degree.level | Título Profesional | es_PE |
thesis.degree.grantor | Universidad Privada Antenor Orrego. Facultad de Ingeniería | es_PE |
thesis.degree.name | Ingeniero Industrial | es_PE |
thesis.degree.discipline | Ingeniería Industrial | es_PE |
dc.subject.ocde | https://purl.org/pe-repo/ocde/ford#2.11.04 | es_PE |
renati.advisor.orcid | https://orcid.org/0000-0002-4250-5619 | es_PE |
renati.author.dni | 70002299 | |
renati.advisor.dni | 18091379 | |
renati.type | https://purl.org/pe-repo/renati/type#tesis | es_PE |
renati.level | https://purl.org/pe-repo/renati/level#tituloProfesional | es_PE |
renati.discipline | 722026 | es_PE |
renati.juror | León Culquichicón, Jorge Iván | |
renati.juror | De la Rosa Anhuaman, Filiberto | |
renati.juror | Rodríguez Salvatierra, Daniel | |
dc.publisher.country | PE | es_PE |
Ficheros en el ítem
Este ítem aparece en la(s) siguiente(s) colección(es)
-
Ingeniería Industrial [356]