Mostrar el registro sencillo del ítem
Implementación del Last Planner y Carta Balance para optimizar la productividad de un edificio multifamiliar de 5 pisos en Trujillo
dc.contributor.advisor | Perrigo Sarmiento, Félix Gilberto | |
dc.contributor.author | Malpica Goicochea, Diego Alexander | |
dc.contributor.author | Yparraguirre Salvatierra, Erick Nilson | |
dc.creator | Malpica Goicochea, Diego Alexander | |
dc.date.accessioned | 2023-03-06T21:42:20Z | |
dc.date.available | 2023-03-06T21:42:20Z | |
dc.date.issued | 2023 | |
dc.identifier.uri | https://hdl.handle.net/20.500.12759/10396 | |
dc.description.abstract | La presente tesis titulada “Implementación del Last Planner y Carta Balance para optimizar la productividad de un edificio multifamiliar de 5 pisos en Trujillo” tuvo como objetivo usar la realización de Carta Balance y la utilización de Last Planner al utilizarlas como herramientas para evaluar la baja productividad en las partidas adentro de la industria de la construcción, medido en la obra edificio multifamiliar , Distrito de Trujillo, Provincia de Trujillo, Departamento de la Libertad”, Estas herramientas fueron medidas a diario durante 8 semanas con formatos de la Carta Balance , donde la actividad que realiza cada obrero son clasificados por tres tipos: Trabajos Productivos (TP), Trabajos Contributorios (TC) y Trabajos No Contributorios (TNC). La metodología de permitirá el estudio a fondo de campo antes y después de aplicar las estrategias de mejora correspondientes para mitigar Trabajos No Contributorios encontrados en obra, mediante la herramienta Carta Balance, donde la aplicación de Last PLanner permite estandarizar las actividades en un nuevo cronograma real de obra, reduciendo costo y tiempo. La Población analizada es el Proyecto en ejecución y la muestra de estudio son las siguientes partidas: concreto, acero y encofrado de zapatas, concreto, acero y encofrado de columnas, concreto, acero y encofrado de vigas, concreto, acero y encofrado de losa aligerada, donde se evaluó la productividad en porcentaje y se logró disminuir un porcentaje considerable aplicando estas herramientas. | es_PE |
dc.description.abstract | The objective of this thesis entitled ““Implementation of the Last Planner and Carta Balance to optimize the productivity of a 5-story multifamily building in Trujillo““ was to use the realization of Carta Balance and the use of Last Planner when using them as tools to evaluate low productivity. in the items within the construction industry, measured in the multifamily building work, District of Trujillo, Province of Trujillo, Department of La Libertad”, These tools were measured daily for 8 weeks with Balance Sheet formats, where the activity carried out by each worker are classified by three types: Productive Work (TP), Contributory Work (TC) and Non-Contributory Work (TNC). The methodology will allow an in-depth field study before and after applying the corresponding improvement strategies to mitigate Non-Contributory Works found on site, through the Carta Balance tool, where the application of Last Planner allows standardizing the activities in a new real schedule. work, reducing cost and time. The Population analyzed is the Project in progress and the study sample is the following items: concrete, steel and footing formwork, concrete, steel and column formwork, concrete, steel and beam formwork, concrete, steel and lightened slab formwork, where the productivity was evaluated in percentage and it was possible to reduce a considerable percentage by applying these tools. | en_US |
dc.description.uri | Tesis | es_PE |
dc.format | application/pdf | es_PE |
dc.language.iso | spa | es_PE |
dc.publisher | Universidad Privada Antenor Orrego | es_PE |
dc.relation.ispartofseries | T_CIVIL_2219 | |
dc.rights | info:eu-repo/semantics/closedAccess | es_PE |
dc.rights.uri | https://creativecommons.org/licenses/by/4.0/ | es_PE |
dc.source | Universidad Privada Antenor Orrego | es_PE |
dc.source | Repositorio Institucional - UPAO | es_PE |
dc.subject | Efectividad | es_PE |
dc.subject | Productividad | es_PE |
dc.title | Implementación del Last Planner y Carta Balance para optimizar la productividad de un edificio multifamiliar de 5 pisos en Trujillo | es_PE |
dc.type | info:eu-repo/semantics/bachelorThesis | es_PE |
thesis.degree.level | Título Profesional | es_PE |
thesis.degree.grantor | Universidad Privada Antenor Orrego. Facultad de Ingeniería | es_PE |
thesis.degree.name | Ingeniero Civil | es_PE |
thesis.degree.discipline | Ingeniería Civil | es_PE |
dc.subject.ocde | https://purl.org/pe-repo/ocde/ford#2.01.00 | es_PE |
renati.advisor.orcid | https://orcid.org/0000-0002-1818-6654 | es_PE |
renati.author.dni | 71293078 | |
renati.author.dni | 77095163 | |
renati.advisor.dni | 16484330 | |
renati.type | https://purl.org/pe-repo/renati/type#tesis | es_PE |
renati.level | https://purl.org/pe-repo/renati/level#tituloProfesional | es_PE |
renati.discipline | 732016 | es_PE |
renati.juror | Vargas López, Segundo Alfredo | |
renati.juror | Panduro Alvarado, Elka | |
renati.juror | Vértiz Malabrigo, Manuel | |
dc.publisher.country | PE | es_PE |
Ficheros en el ítem
Este ítem aparece en la(s) siguiente(s) colección(es)
-
Ingeniería Civil [1260]