dc.description.abstractLa presente tesis titulada “Implementación del Last Planner y Carta Balance para optimizar la productividad de un edificio multifamiliar de 5 pisos en Trujillo” tuvo como objetivo usar la realización de Carta Balance y la utilización de Last Planner al utilizarlas como herramientas para evaluar la baja productividad en las partidas adentro de la industria de la construcción, medido en la obra edificio multifamiliar , Distrito de Trujillo, Provincia de Trujillo, Departamento de la Libertad”, Estas herramientas fueron medidas a diario durante 8 semanas con formatos de la Carta Balance , donde la actividad que realiza cada obrero son clasificados por tres tipos: Trabajos Productivos (TP), Trabajos Contributorios (TC) y Trabajos No Contributorios (TNC). La metodología de permitirá el estudio a fondo de campo antes y después de aplicar las estrategias de mejora correspondientes para mitigar Trabajos No Contributorios encontrados en obra, mediante la herramienta Carta Balance, donde la aplicación de Last PLanner permite estandarizar las actividades en un nuevo cronograma real de obra, reduciendo costo y tiempo. La Población analizada es el Proyecto en ejecución y la muestra de estudio son las siguientes partidas: concreto, acero y encofrado de zapatas, concreto, acero y encofrado de columnas, concreto, acero y encofrado de vigas, concreto, acero y encofrado de losa aligerada, donde se evaluó la productividad en porcentaje y se logró disminuir un porcentaje considerable aplicando estas herramientas.es_PE
dc.description.abstractThe objective of this thesis entitled ““Implementation of the Last Planner and Carta Balance to optimize the productivity of a 5-story multifamily building in Trujillo““ was to use the realization of Carta Balance and the use of Last Planner when using them as tools to evaluate low productivity. in the items within the construction industry, measured in the multifamily building work, District of Trujillo, Province of Trujillo, Department of La Libertad”, These tools were measured daily for 8 weeks with Balance Sheet formats, where the activity carried out by each worker are classified by three types: Productive Work (TP), Contributory Work (TC) and Non-Contributory Work (TNC). The methodology will allow an in-depth field study before and after applying the corresponding improvement strategies to mitigate Non-Contributory Works found on site, through the Carta Balance tool, where the application of Last Planner allows standardizing the activities in a new real schedule. work, reducing cost and time. The Population analyzed is the Project in progress and the study sample is the following items: concrete, steel and footing formwork, concrete, steel and column formwork, concrete, steel and beam formwork, concrete, steel and lightened slab formwork, where the productivity was evaluated in percentage and it was possible to reduce a considerable percentage by applying these tools.en_US
dc.description.uriTesises_PE
dc.formatapplication/pdfes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada Antenor Orregoes_PE
dc.relation.ispartofseriesT_CIVIL_2219
dc.rightsinfo:eu-repo/semantics/closedAccesses_PE
dc.rights.urihttps://creativecommons.org/licenses/by/4.0/es_PE
dc.sourceUniversidad Privada Antenor Orregoes_PE
dc.sourceRepositorio Institucional - UPAOes_PE
dc.subjectEfectividades_PE
dc.subjectProductividades_PE
dc.titleImplementación del Last Planner y Carta Balance para optimizar la productividad de un edificio multifamiliar de 5 pisos en Trujilloes_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.levelTítulo Profesionales_PE
thesis.degree.grantorUniversidad Privada Antenor Orrego. Facultad de Ingenieríaes_PE
thesis.degree.nameIngeniero Civiles_PE
thesis.degree.disciplineIngeniería Civiles_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.01.00es_PE
renati.advisor.orcidhttps://orcid.org/0000-0002-1818-6654es_PE
renati.author.dni71293078
renati.author.dni77095163
renati.advisor.dni16484330
renati.typehttps://purl.org/pe-repo/renati/type#tesises_PE
renati.levelhttps://purl.org/pe-repo/renati/level#tituloProfesionales_PE
renati.discipline732016es_PE
renati.jurorVargas López, Segundo Alfredo
renati.jurorPanduro Alvarado, Elka
renati.jurorVértiz Malabrigo, Manuel
dc.publisher.countryPEes_PE


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(es)

Mostrar el registro sencillo del ítem

info:eu-repo/semantics/closedAccess
Excepto si se señala otra cosa, la licencia del ítem se describe como info:eu-repo/semantics/closedAccess