Automatización del proceso de estimación de costos en proyectos de ingeniería adoptando las recomendaciones de AACE International para GMI SAC usando un sistema web
dc.contributor.advisor | Piminchumo Flores, Jorge | |
dc.contributor.author | Castañeda Muñoz, Saul | |
dc.contributor.author | Liñan Ponce, Luis | |
dc.creator | Castañeda Muñoz, Saul | |
dc.date.accessioned | 2015-08-26T21:24:29Z | |
dc.date.available | 2015-08-26T21:24:29Z | |
dc.date.issued | 2015 | |
dc.identifier.uri | https://hdl.handle.net/20.500.12759/1045 | |
dc.description.abstract | Esta tesis se aplica al Área de Costos de la empresa Graña y Monteros Ingenieros S.A.C, al ser una de las más importantes en la empresa, debido a que es el área responsable de estimar y controlar los costos de los Proyectos de Inversión. La tesis surge en base al problema de constantes excesos en los márgenes de error esperados en la estimación de costos de los proyectos, esto es producto de la falta de coordinación y orden en sus procesos, entre los problemas identificados tenemos a: la redundancia de datos en el cálculo de la estimación, tiempos operacionales de análisis de estimación muy altos, información no centralizada en una base de datos, ya que es llevada en hojas de cálculos independientes, no existe historial base que permitan realizar las estimaciones con mayor rapidez y confiabilidad. Otro de los principales problemas es no tener un control sobre sus procesos ocasionando que no se cumpla de manera uniforme las prácticas recomendadas de la AACEI que son aplicables en este tipo de Áreas. Para la solución a este problema se desarrolló un Sistema Informático Web para la Estimación de Costos de Proyectos de Inversión, y que integre algunas prácticas recomendadas que son necesarias en este proceso. Para el desarrollo de este sistema, se utilizó como metodología de desarrollo ICONIX, ASP.NET - Framework 4.5 como lenguaje de programación, con ayuda de Controles Telerik 2013 Q3 y como Gestor de Base de Datos a Microsoft SQL Server 2008 R2. Con este sistema se pretende automatizar el proceso de Estimación del Área de Costos, cumpliendo con las Practicas Recomendadas necesarias según la AACEI. Y además de mejorar la administración de datos que permitirán reducir tiempos de cálculos en próximas estimaciones, reduciendo los márgenes de error esperados. | es_PE |
dc.description.abstract | Automation of Cost Estimation in Engineering Projects adopting the recommendations of AACE International for GMI SAC using a Web System“ by: Bach. Castañeda Muñoz, Saúl Bach. Liñan Ponce, Luis This thesis applies the costs area of company Grana y Montero Ingenieros SAC Company, to be one of the most important in the company, because it is the responsible area for estimating and controlling the cost of Investment Projects. The work arises for a problem of overruns constant in error margins expected in project costs estimating, this is the result of a lack of coordination and order in their processes, between identified problems we have: data redundancy in the calculation of the estimate, analysis times very high, information not centralized in a database, and which is carried on sheets of independent calculations, no history based on estimates that allow for the estimates faster and reliability among others. Another major problem is that having no control over their processes do not comply so uniformly the AACEI recommended practices that are applicable in such areas. To solve this problem, it was developed a Web Information System for Cost Estimation of Investment Projects, and integrating some Best Practices that are needed in this process. For the development of this system, it was used ICONIX as software methodology, ASP.NET - Framework 4.5 as programming language, using Telerik Controls Q3 2013 as Database Manager Microsoft SQL Server 2008 R2. This system aims to automate the Estimation process of Cost Area, complying with the recommended practices required under the AACEI. And improve data management that will reduce calculations time on next estimates, reducing margins expected error. | en_US |
dc.description.uri | Tesis | es_PE |
dc.format | application/pdf | es_PE |
dc.language.iso | spa | es_PE |
dc.publisher | Universidad Privada Antenor Orrego | es_PE |
dc.rights | info:eu-repo/semantics/openAccess | es_PE |
dc.rights.uri | https://creativecommons.org/licenses/by/4.0/ | es_PE |
dc.source | Universidad Privada Antenor Orrego | es_PE |
dc.source | Repositorio Institucional - UPAO | es_PE |
dc.subject | Proceso de estimación | es_PE |
dc.subject | AACE International | es_PE |
dc.subject | GMI | es_PE |
dc.subject | Sistema web | es_PE |
dc.title | Automatización del proceso de estimación de costos en proyectos de ingeniería adoptando las recomendaciones de AACE International para GMI SAC usando un sistema web | es_PE |
dc.type | info:eu-repo/semantics/bachelorThesis | es_PE |
thesis.degree.level | Título Profesional | es_PE |
thesis.degree.grantor | Universidad Privada Antenor Orrego. Facultad de Ingeniería | es_PE |
thesis.degree.name | Ingeniero de Computación y Sistemas | es_PE |
thesis.degree.discipline | Ingeniería de Computación y Sistemas | es_PE |
dc.subject.ocde | https://purl.org/pe-repo/ocde/ford#2.02.04 | |
renati.type | https://purl.org/pe-repo/renati/type#tesis | |
renati.level | https://purl.org/pe-repo/renati/level#tituloProfesional | |
dc.publisher.country | PE | es_PE |