dc.contributor.advisor | Medina Carbajal, Lucio Sigifredo | |
dc.contributor.author | Peche Cortegana, Carlos Jonatan | |
dc.creator | Peche Cortegana, Carlos Jonatan | |
dc.date.accessioned | 2023-03-20T16:58:57Z | |
dc.date.available | 2023-03-20T16:58:57Z | |
dc.date.issued | 2023 | |
dc.identifier.uri | https://hdl.handle.net/20.500.12759/10466 | |
dc.description.abstract | La presente investigación tiene como finalidad brindar un punto de partida para la
aplicación de nuevas metodologías científicas y prácticas, para el control,
ejecución, seguimiento y administración de obras de construcción civil,
fundamentando sus bases en la herramienta de “Last Planner System”,
prevaleciendo en su metodología el aprovechamiento de todos y cada uno de los
recursos que intervienen en el desarrollo de ejecución de un proyecto de índole
civil, permitiéndonos tener como guía un modelo de seguimiento y control de
obras centrando su aplicación a las edificaciones Algarrobos y Poncianas,
permitiendo así mejorar la programación y la productividad en los edificios antes
mencionados ubicado en la ciudad de Piura. Aplicando un modelo analítico de
gestión esperando obtener resultados satisfactorios que puedan brindar ese tan
ansiado desarrollo que se quiere.
El propósito de aplicar este sistema es para mejorar los problemas que
actualmente presenta la industria de la construcción, ya que actualmente se usan
métodos obsoletos para planificar, controlar y gestionar de la producción, esta
metodología nos ayudara a tener un compromiso colaborativo en la obra de
Algarrobos y Poncianas.
Como primer punto, veremos una vista general del Master Plan de la obra con los
hitos contractuales, posteriormente a eso se analizara aguas arriba con el sistema
Pull Planning para hallar nuestro sistemas fases, los principales actores en este
primer proceso son los primeros planificadores compuesto por el equipo de
trabajo de dicha inmobiliaria, finalmente se elaborara un plan intermedio
(Lookahead) involucrando colaborativamente a todos los responsables directos
(Maestro de Obra, capataces, operarios) de cada edificio | es_PE |
dc.description.abstract | The purpose of this research is to provide a starting point for the application of
new scientific and practical methodologies, for the control, execution, monitoring
and administration of civil construction works, basing their bases on the tool ““Last
Planner System““, with the prevailing methodology being the use of each and every
one of the resources involved in the development of a civilian project, Allowing us
to have as a guide a model of monitoring and control of works focusing its
application to the buildings Algarrobos and Poncianas, thus allowing to improve
programming and productivity in the above-mentioned buildings located in the city
of Piura. Applying an analytical model of management hoping to obtain
satisfactory results that can provide that much longed for development that is
wanted.
The purpose of applying this system is to improve the current problems of the
construction industry, as obsolete methods are currently used to plan, control and
manage production, This methodology will help us to have a collaborative
commitment in the work of Algarrobos and Poncianas.
As a first point, we will see an overview of the Master Plan of the work with the
contractual milestones, after that will be analyzed upstream with the Pull Planning
system to find our phased systems, the main actors in this first process are the
first planners composed of the team of work of said real estate, finally an
intermediate plan will be elaborated (Lookahead) involving collaboratively all those
directly responsible (Master of Works, foremen, workers) of each building | en_US |
dc.description.uri | Tesis | es_PE |
dc.format | application/pdf | es_PE |
dc.language.iso | spa | es_PE |
dc.publisher | Universidad Privada Antenor Orrego | es_PE |
dc.relation.ispartofseries | T_CIVIL_2226 | |
dc.rights | info:eu-repo/semantics/openAccess | es_PE |
dc.rights.uri | https://creativecommons.org/licenses/by/4.0/ | es_PE |
dc.source | Universidad Privada Antenor Orrego | es_PE |
dc.source | Repositorio Institucional - UPAO | es_PE |
dc.subject | Last Planner System | es_PE |
dc.subject | Productividad | es_PE |
dc.title | Aplicación del sistema Last Planner para mejorar la planificación y productividad en las Edificaciones de Algarrobos y Poncianas, Piura-2022 | es_PE |
dc.type | info:eu-repo/semantics/bachelorThesis | es_PE |
thesis.degree.level | Título Profesional | es_PE |
thesis.degree.grantor | Universidad Privada Antenor Orrego. Facultad de Ingeniería | es_PE |
thesis.degree.name | Ingeniero Civil | es_PE |
thesis.degree.discipline | Ingeniería Civil | es_PE |
dc.subject.ocde | https://purl.org/pe-repo/ocde/ford#2.01.00 | es_PE |
renati.advisor.orcid | https://orcid.org/0000-0001-5207-4421 | es_PE |
renati.author.dni | 47184835 | |
renati.advisor.dni | 40534510 | |
renati.type | https://purl.org/pe-repo/renati/type#tesis | es_PE |
renati.level | https://purl.org/pe-repo/renati/level#tituloProfesional | es_PE |
renati.discipline | 732016 | es_PE |
renati.juror | Chuquilín Delgado, María Florencia | |
renati.juror | Merino Martínez, Marcelo Edmundo | |
renati.juror | Serrano Hernández, José Luis | |
dc.publisher.country | PE | es_PE |