dc.contributor.advisor | López Carranza, Atilio Rubén | |
dc.contributor.author | Jiménez Briceño, Martin Eduardo | |
dc.contributor.author | Salvatierra Ramos, Karina Edith | |
dc.creator | Jiménez Briceño, Martin Eduardo | |
dc.date.accessioned | 2023-05-04T16:10:39Z | |
dc.date.available | 2023-05-04T16:10:39Z | |
dc.date.issued | 2023 | |
dc.identifier.uri | https://hdl.handle.net/20.500.12759/10672 | |
dc.description.abstract | La presente tesis tiene como finalidad brindar un punto de partida para la
aplicación de nuevas metodologías científicas y prácticas, para el control,
ejecución, seguimiento y administración de obras de construcción civil,
fundamentando sus bases en la herramienta de Last Planner System,
prevaleciendo en su metodología el aprovechamiento de todos y cada uno de los
recursos que intervienen en el desarrollo de ejecución de un proyecto de índole
civil, permitiéndonos tener como guía un modelo de seguimiento y control de
obras centrando su aplicación a las edificaciones Algarrobos y Poncianas,
permitiendo así mejorar la programación y la productividad en los edificios antes
mencionados ubicado en la ciudad de Piura. Aplicando un modelo analítico de
gestión esperando obtener resultados satisfactorios que puedan brindar ese tan
ansiado desarrollo que se quiere.
El propósito de aplicar este sistema es para mejorar los problemas que
actualmente presenta la industria de la construcción, ya que actualmente se usan
métodos obsoletos para planificar, controlar y gestionar de la producción, esta
metodología nos ayudara a tener un compromiso colaborativo en la obra de
Algarrobos y Poncianas.
Como primer punto, veremos una vista general del Master Plan de la obra con los
hitos contractuales, posteriormente a eso se analizara aguas arriba con el sistema
Pull Planning para hallar nuestro sistemas fases, los principales actores en este
primer proceso son los primeros planificadores compuesto por el equipo de
trabajo de dicha inmobiliaria, finalmente se elaborara un plan intermedio
(Lookahead) involucrando colaborativamente a todos los responsables directos
(Maestro de Obra, capataces, operarios) de cada edificio | es_PE |
dc.description.abstract | The purpose of this thesis is to provide a starting point for the application of new
scientific and practical methodologies for the control, execution, monitoring and
administration of civil construction works, basing its bases on the Last Planner
System tool, prevailing in its methodology the use of each and every one of the
resources that intervene in the development of execution of a project of a civil
nature, allowing us to have as a guide a model for monitoring and control of works,
focusing its application on the Algarrobos and Poncianas buildings, thus allowing
to improve programming and productivity in the aforementioned buildings located
in the city of Piura. Applying an analytical management model hoping to obtain
satisfactory results that can provide that long-awaited development that is wanted.
The purpose of applying this system is to improve the problems that the
construction industry currently presents, since obsolete methods are currently
used to plan, control and manage production, this methodology will help us to
have a collaborative commitment in the construction work. Carob trees and
Poncianas.
As a first point, we will see a general view of the Master Plan of the work with the
contractual milestones, after that it will be analyzed upstream with the Pull
Planning system to find our phase systems, the main actors in this first process
are the first planners made up of the work team of said real estate agency, finally
an intermediate plan (Lookahead) will be elaborated collaboratively involving all
those directly responsible (Foreman, foremen, operators) of each building. | en_US |
dc.description.uri | Tesis | es_PE |
dc.format | application/pdf | es_PE |
dc.language.iso | spa | es_PE |
dc.publisher | Universidad Privada Antenor Orrego | es_PE |
dc.relation.ispartofseries | T_CIVIL_2243 | |
dc.rights | info:eu-repo/semantics/closedAccess | es_PE |
dc.rights.uri | https://creativecommons.org/licenses/by/4.0/ | es_PE |
dc.source | Universidad Privada Antenor Orrego | es_PE |
dc.source | Repositorio Institucional - UPAO | es_PE |
dc.subject | Last Planner System | es_PE |
dc.subject | Pull Planning | es_PE |
dc.title | Mejoramiento de la planificación y producción aplicando Last Planner en las obras de edificación Poncianas Las Palmeras y Algarrobos de Piura | es_PE |
dc.type | info:eu-repo/semantics/bachelorThesis | es_PE |
thesis.degree.level | Título Profesional | es_PE |
thesis.degree.grantor | Universidad Privada Antenor Orrego. Facultad de Ingeniería | es_PE |
thesis.degree.name | Ingeniero Civil | es_PE |
thesis.degree.discipline | Ingeniería Civil | es_PE |
dc.subject.ocde | https://purl.org/pe-repo/ocde/ford#2.01.00 | es_PE |
renati.advisor.orcid | https://orcid.org/0000-0002-3631-2001 | es_PE |
renati.author.dni | 46585767 | |
renati.author.dni | 70221398 | |
renati.advisor.dni | 32965940 | |
renati.type | https://purl.org/pe-repo/renati/type#tesis | es_PE |
renati.level | https://purl.org/pe-repo/renati/level#tituloProfesional | es_PE |
renati.discipline | 732016 | es_PE |
renati.juror | Vega Benites, Jorge | |
renati.juror | Panduro Alvarado, Elka | |
renati.juror | Vertiz Malabrigo, Manuel | |
dc.publisher.country | PE | es_PE |