Mejoramiento de la planificación y producción aplicando Last Planner en las obras de edificación Poncianas Las Palmeras y Algarrobos de Piura
dc.contributor.advisor | López Carranza, Atilio Rubén | |
dc.contributor.author | Jiménez Briceño, Martin Eduardo | |
dc.contributor.author | Salvatierra Ramos, Karina Edith | |
dc.creator | Jiménez Briceño, Martin Eduardo | |
dc.date.accessioned | 2023-05-04T16:10:39Z | |
dc.date.available | 2023-05-04T16:10:39Z | |
dc.date.issued | 2023 | |
dc.identifier.uri | https://hdl.handle.net/20.500.12759/10672 | |
dc.description.abstract | La presente tesis tiene como finalidad brindar un punto de partida para la aplicación de nuevas metodologías científicas y prácticas, para el control, ejecución, seguimiento y administración de obras de construcción civil, fundamentando sus bases en la herramienta de Last Planner System, prevaleciendo en su metodología el aprovechamiento de todos y cada uno de los recursos que intervienen en el desarrollo de ejecución de un proyecto de índole civil, permitiéndonos tener como guía un modelo de seguimiento y control de obras centrando su aplicación a las edificaciones Algarrobos y Poncianas, permitiendo así mejorar la programación y la productividad en los edificios antes mencionados ubicado en la ciudad de Piura. Aplicando un modelo analítico de gestión esperando obtener resultados satisfactorios que puedan brindar ese tan ansiado desarrollo que se quiere. El propósito de aplicar este sistema es para mejorar los problemas que actualmente presenta la industria de la construcción, ya que actualmente se usan métodos obsoletos para planificar, controlar y gestionar de la producción, esta metodología nos ayudara a tener un compromiso colaborativo en la obra de Algarrobos y Poncianas. Como primer punto, veremos una vista general del Master Plan de la obra con los hitos contractuales, posteriormente a eso se analizara aguas arriba con el sistema Pull Planning para hallar nuestro sistemas fases, los principales actores en este primer proceso son los primeros planificadores compuesto por el equipo de trabajo de dicha inmobiliaria, finalmente se elaborara un plan intermedio (Lookahead) involucrando colaborativamente a todos los responsables directos (Maestro de Obra, capataces, operarios) de cada edificio | es_PE |
dc.description.abstract | The purpose of this thesis is to provide a starting point for the application of new scientific and practical methodologies for the control, execution, monitoring and administration of civil construction works, basing its bases on the Last Planner System tool, prevailing in its methodology the use of each and every one of the resources that intervene in the development of execution of a project of a civil nature, allowing us to have as a guide a model for monitoring and control of works, focusing its application on the Algarrobos and Poncianas buildings, thus allowing to improve programming and productivity in the aforementioned buildings located in the city of Piura. Applying an analytical management model hoping to obtain satisfactory results that can provide that long-awaited development that is wanted. The purpose of applying this system is to improve the problems that the construction industry currently presents, since obsolete methods are currently used to plan, control and manage production, this methodology will help us to have a collaborative commitment in the construction work. Carob trees and Poncianas. As a first point, we will see a general view of the Master Plan of the work with the contractual milestones, after that it will be analyzed upstream with the Pull Planning system to find our phase systems, the main actors in this first process are the first planners made up of the work team of said real estate agency, finally an intermediate plan (Lookahead) will be elaborated collaboratively involving all those directly responsible (Foreman, foremen, operators) of each building. | en_US |
dc.description.uri | Tesis | es_PE |
dc.format | application/pdf | es_PE |
dc.language.iso | spa | es_PE |
dc.publisher | Universidad Privada Antenor Orrego | es_PE |
dc.relation.ispartofseries | T_CIVIL_2243 | |
dc.rights | info:eu-repo/semantics/closedAccess | es_PE |
dc.rights.uri | https://creativecommons.org/licenses/by/4.0/ | es_PE |
dc.source | Universidad Privada Antenor Orrego | es_PE |
dc.source | Repositorio Institucional - UPAO | es_PE |
dc.subject | Last Planner System | es_PE |
dc.subject | Pull Planning | es_PE |
dc.title | Mejoramiento de la planificación y producción aplicando Last Planner en las obras de edificación Poncianas Las Palmeras y Algarrobos de Piura | es_PE |
dc.type | info:eu-repo/semantics/bachelorThesis | es_PE |
thesis.degree.level | Título Profesional | es_PE |
thesis.degree.grantor | Universidad Privada Antenor Orrego. Facultad de Ingeniería | es_PE |
thesis.degree.name | Ingeniero Civil | es_PE |
thesis.degree.discipline | Ingeniería Civil | es_PE |
dc.subject.ocde | https://purl.org/pe-repo/ocde/ford#2.01.00 | es_PE |
renati.advisor.orcid | https://orcid.org/0000-0002-3631-2001 | es_PE |
renati.author.dni | 46585767 | |
renati.author.dni | 70221398 | |
renati.advisor.dni | 32965940 | |
renati.type | https://purl.org/pe-repo/renati/type#tesis | es_PE |
renati.level | https://purl.org/pe-repo/renati/level#tituloProfesional | es_PE |
renati.discipline | 732016 | es_PE |
renati.juror | Vega Benites, Jorge | |
renati.juror | Panduro Alvarado, Elka | |
renati.juror | Vertiz Malabrigo, Manuel | |
dc.publisher.country | PE | es_PE |
Ficheros en el ítem
Este ítem aparece en la(s) siguiente(s) colección(es)
-
Ingeniería Civil [1260]