Show simple item record

dc.contributor.advisorMedina Carbajal, Lucio Sigifredo
dc.contributor.authorAndrade Chavez, Tania Lizeth
dc.contributor.authorGalindos Pino, Luz Anais
dc.creatorAndrade Chavez, Tania Lizeth
dc.date.accessioned2023-08-16T13:51:19Z
dc.date.available2023-08-16T13:51:19Z
dc.date.issued2023
dc.identifier.urihttps://hdl.handle.net/20.500.12759/11010
dc.description.abstractLa elaboración de la presente tesis tiene como título: “ANÁLISIS DE LA PRODUCTIVIDAD EN LA OBRA DE RECONSTRUCCIÓN DEL LOCAL ESCOLAR N°2306 SOL NACIENTE MEDIANTE LA GUIA PMBOK TRUJILLO-2021”, buscando priorizar la elaboración de este análisis a través de los lineamientos que establece la guía PMBOK, el cual se basa en una planificación durante el proceso de obra así como también nos muestra que está dividido en grupos de gestión de áreas de conocimiento y grupos de procesos de la gestión de proyectos, que gracias a la interacción de estos, logran los objetivos de mejora continua en el transcurso del estudio, enfatizando el desarrollo de los planes de gestión que ayudaran a cumplir las metas físicas trazadas del proyecto. Tiene como objetivo principal realizar el análisis de la productividad y proponer el tiempo, control y costo en obras utilizando la guía PMBOK en “las áreas de conocimiento de gestión de calidad y gestión del cronograma de un proyecto” mediante un análisis cualitativo en el expediente técnico de la obra Reconstrucción del Local Escolar N° 2306 Sol Naciente, se identificó un riesgo alto en el presupuesto debido a que los montos otorgados por la entidad no ascienden al 9 % de los montos presupuestales solicitados por el cliente y que debido a esto perjudica la producción en obra, por otro lado para el cronograma establecido se obtiene un factor de riesgo mínimo del 7% el cual no afecta en términos de plazo para culminar el proyecto. Por último, para esta investigación el método utilizado fue el tipo descriptivo-no experimental, aplicando técnicas de investigación de observación y análisis con la finalidad ser una propuesta en beneficio a la dirección de proyectos, y el de determinar las posibles causas que originan la demora en un proyecto y por ende un mayor plazo de tiempo a lo programado.es_PE
dc.description.abstractThe elaboration of the present thesis is entitled: ““ANALYSIS OF PRODUCTIVITY IN THE WORK OF RECONSTRUCTION OF THE SCHOOL LOCAL N°2306 SOL NACIENTE BY MEANS OF THE GUIDE PMBOK TRUJILLO-2022““, seeking to prioritize the elaboration of this analysis through the guidelines established by the PMBOK guide, which is based on a planning during the work process as well as it shows us that it is divided into management groups of knowledge areas and groups of project management processes, which thanks to the interaction of these, achieve the objectives of continuous improvement in the course of the study, emphasizing the development of management plans that will help to meet the physical goals of the project. The main objective is to analyze productivity and propose time, control and cost in works using the PMBOK guide in ““the areas of knowledge of quality management and project schedule management““ through a qualitative analysis in the technical file of the Reconstruction of School Building No. 2306 Sol Naciente, a high risk was identified in the budget due to the fact that the amounts granted by the entity do not amount to 9% of the budget amounts requested by the client and that due to this it harms the production on site, on the other hand for the established schedule a minimum risk factor of 7% is obtained, which does not affect in terms of time to complete the project. Finally, for this investigation, the method used was the descriptive-non-experimental type, applying observation and analysis research techniques in order to be a proposal for the benefit of project management, and to determine the possible causes that originate the delay. in a project and therefore a longer period of time than scheduled.en_US
dc.description.uriTesises_PE
dc.formatapplication/pdfes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada Antenor Orregoes_PE
dc.relation.ispartofseriesT_CIVIL_2264
dc.rightsinfo:eu-repo/semantics/embargoedAccesses_PE
dc.rights.urihttps://creativecommons.org/licenses/by/4.0/es_PE
dc.sourceUniversidad Privada Antenor Orregoes_PE
dc.sourceRepositorio Institucional - UPAOes_PE
dc.subjectTiempoes_PE
dc.subjectControles_PE
dc.titleAnálisis de la productividad en la obra de reconstrucción del local escolar N° 2306 Sol Naciente Mediante la Guía PMBOK Trujillo-2021es_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.levelTítulo Profesionales_PE
thesis.degree.grantorUniversidad Privada Antenor Orrego. Facultad de Ingenieríaes_PE
thesis.degree.nameIngeniero Civiles_PE
thesis.degree.disciplineIngeniería Civiles_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.01.00es_PE
renati.advisor.orcidhttps://orcid.org/0000-0001-5207-4421es_PE
renati.author.dni70306906
renati.author.dni73573781
renati.advisor.dni40534510
renati.typehttps://purl.org/pe-repo/renati/type#tesises_PE
renati.levelhttps://purl.org/pe-repo/renati/level#tituloProfesionales_PE
renati.discipline732016es_PE
renati.jurorMerino Martínez, Marcelo Edmundo
renati.jurorSerrano Hernández, José Luis
renati.jurorVega Benites, Jorge Antonio
dc.publisher.countryPEes_PE
dc.date.embargoEnd2028-08-15


Files in this item

Thumbnail
Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record

info:eu-repo/semantics/embargoedAccess
Except where otherwise noted, this item's license is described as info:eu-repo/semantics/embargoedAccess