Mostrar el registro sencillo del ítem

dc.contributor.advisorMedina Carbajal, Lucio Sigifredo
dc.contributor.authorBenites Jauregui, Jairo Antonio
dc.contributor.authorCruz Fernández, Segundo Santiago
dc.creatorBenites Jauregui, Jairo Antonio
dc.date.accessioned2023-09-01T21:40:50Z
dc.date.available2023-09-01T21:40:50Z
dc.date.issued2023
dc.identifier.urihttps://hdl.handle.net/20.500.12759/11114
dc.description.abstractEn el transcurso de un proyecto de construcción se descubren con frecuencia discrepancias entre los planos y las especificaciones técnicas. Estas discrepancias influyen negativamente en los costes y plazos de ejecución del proyecto y, en consecuencia, la calidad del mismo se ve comprometida. Para combatir estos problemas, sugerimos la adopción de una metodología que implique la utilización de modelos 3D. Esto ayudará a visualizar, calcular los materiales necesarios y garantizar la compatibilidad durante la fase de preparación. Con esta metodología, es posible descubrir cualquier incompatibilidad e interferencia, y simular el proceso de construcción. Para este proyecto de investigación se desplegaron aplicaciones especializadas en metodología BIM (Revit y Naviswork), que permitieron crear modelos para distintas disciplinas, como Ingeniería Estructural, Arquitectura, Instalaciones Eléctricas, Instalaciones Sanitarias y Equipamiento. Este proceso permitió identificar 103 discrepancias y conflictos. Para efectos de la muestra, el proyecto tomado en consideración fue el ““Desembarcadero Pesquero Artesanal La Cruz““ ubicado en el distrito de La Cruz, provincia de Tumbes. Finalmente, se compararon los resultados a través de diagramas estadísticos en base a lo logrado con la ayuda de la metodología BIM. En resumen, el modelado de información de construcción mejora el proceso de diseño en el sector, fomenta una sólida práctica de la construcción y ayuda a garantizar el éxito del proyecto al permitir una mejor gestión e identificación de posibles errores, mediante la utilización de un modelo digital que permite aplicar posibles soluciones antes de que tenga lugar la construcción real. De este modo, se pueden evitar retrasos y el contratista puede aumentar su eficiencia en la programación, la fabricación y la calidad de la construcción.es_PE
dc.description.abstractIn the course of a construction project, discrepancies between the plans and the technical specifications are frequently discovered. These discrepancies have a negative influence on the costs and execution time of the project and, consequently, the quality of the project is compromised. To combat these problems, we suggest the adoption of a methodology that involves the use of 3D models. This will help to visualise, calculate the materials required and ensure compatibility during the preparation phase. With this methodology, it is possible to discover any incompatibilities and interference, and simulate the construction process. For this research project, specialised applications in BIM methodology (Revit and Naviswork) were deployed, which allowed the creation of models for different disciplines, such as Structural Engineering, Architecture, Electrical Installations, Sanitary Installations and Equipment. This process allowed the identification of 103 discrepancies and conflicts. For the purposes of the sample, the project taken into consideration was the ““Desembarcadero Pesquero Artesanal La Cruz““ located in the district of La Cruz, province of Tumbes. Finally, the results were compared through statistical diagrams based on what was achieved with the help of the BIM methodology. In summary, Building Information Modelling improves the design process in the sector, promotes sound construction practice and helps to ensure project success by enabling better management and identification of potential errors, through the use of a digital model that allows possible solutions to be implemented before actual construction takes place. In this way, delays can be avoided, and the contractor can increase his efficiency in scheduling, fabrication, and construction quality.en_US
dc.description.uriTesises_PE
dc.formatapplication/pdfes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada Antenor Orregoes_PE
dc.relation.ispartofseriesT_CIVIL_2273
dc.rightsinfo:eu-repo/semantics/openAccesses_PE
dc.rights.urihttps://creativecommons.org/licenses/by/4.0/es_PE
dc.sourceUniversidad Privada Antenor Orregoes_PE
dc.sourceRepositorio institucional - UPAOes_PE
dc.subjectModelado de información de construcción (BIM)es_PE
dc.subjectIncompatibilidades e Interferenciases_PE
dc.titlePropuesta de Implementación de la Metodología BIM como Herramienta en el Diseño del Desembarcadero Pesquero Artesanal La Cruz – Tumbeses_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.grantorUniversidad Privada Antenor Orrego. Facultad de Ingenieríaes_PE
thesis.degree.nameIngeniero Civiles_PE
thesis.degree.disciplineIngeniería Civiles_PE
dc.subject.ocdehttp://purl.org/pe-repo/ocde/ford#2.01.00es_PE
renati.advisor.orcidhttps://orcid.org/0000-0001-5207-4421es_PE
renati.author.dni70224375
renati.author.dni70023990
renati.advisor.dni40534510
renati.typehttp://purl.org/pe-repo/renati/type#tesises_PE
renati.levelhttp://purl.org/pe-repo/renati/level#tituloProfesionales_PE
renati.discipline732016es_PE
renati.jurorVértiz Malabrigo, Manuel Alberto
renati.jurorBurgos Sarmiento, Tito Alfredo
renati.jurorGálvez Paredes, José Alcides
dc.publisher.countryPEes_PE


Ficheros en el ítem

Thumbnail
Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(es)

Mostrar el registro sencillo del ítem

info:eu-repo/semantics/openAccess
Excepto si se señala otra cosa, la licencia del ítem se describe como info:eu-repo/semantics/openAccess