dc.contributor.advisor | Vertiz Malabrigo, Manuel Alberto | |
dc.contributor.author | Quevedo Enco, Leyvi Marilin | |
dc.contributor.author | Varas Martinez, Kenyo Yohander | |
dc.creator | Quevedo Enco, Leyvi Marilin | |
dc.date.accessioned | 2023-09-11T17:00:26Z | |
dc.date.available | 2023-09-11T17:00:26Z | |
dc.date.issued | 2023 | |
dc.identifier.uri | https://hdl.handle.net/20.500.12759/11167 | |
dc.description.abstract | La tesis propone la Aplicación de Guía PMBOK, para fortalecer la Gestión de Cronograma y Costo (Dominio de desempeño de Planificación PMBOK 7ma edición), y Calidad (Dominio de desempeño de Entrega PMBOK 7ma edición), de la empresa contratista Consorcio Sarín en la ejecución del proyecto Mejoramiento Institución Educativa Inicial N° 1617, Sarín. Se realizó la aplicación de los 6 procesos de la gestión del cronograma, de los 4 procesos de la gestión de Costos y de los 3 procesos de la gestión de la calidad, migrando de la sexta edición a la séptima edición de la Guía PMBOK y la plataforma de contenidos Digitales PMIstandards y se obtuvieron como resultado planificar la gestión de cronograma, costos y en Entrega la Calidad, por lo que se obtuvo el plan de gestión de cronograma, definir las actividades; la lista de hitos del proyecto, secuenciar las actividades; el diagrama de red del proyecto, estimar la duración; el periodo de trabajo de las actividades, desarrollar el cronograma; el cronograma base, costos base y la calidad base del proyecto; las técnicas para controlar el umbral del proyecto. Finalmente, la investigación brindó resultados positivos ante la propuesta de aplicación de la Guía PMBOK, para fortalecer Gestión de Cronograma, Costos y Calidad, utilizando los lineamientos del PMBOK, sin embargo, con la aplicación de la metodología tradicional el contratista logro culminar la obra el 15 de Mayo del 2022, con un atraso de 21 días respecto al plazo otorgado por el cliente, siendo el costo incluido el IGV de 2’151,767.99 soles y logrando una calidad de 90 % en la entrega de la obra culminada. (p.7) | es_PE |
dc.description.abstract | The thesis proposes the Application of the PMBOK Guide, to strengthen the Schedule and Cost Management (PMBOK Planning performance domain 7th edition), and Quality (PMBOK Delivery performance domain 7th edition), of the contractor company Consorcio Sarin in the execution of the project Improvement Initial Educational Institution No. 1617, Sarín. The application of the 6 schedule management processes, the 4 Cost management processes and the 3 quality management processes was carried out, migrating from the sixth edition to the seventh edition of the PMBOK Guide and the PMIstandards digital content platform and as a result were obtained to plan the management of schedule, costs and Quality Delivery so the schedule management plan was obtained, define the activities, the list of project milestones was obtained; sequencing the activities, the project network diagram was obtained; estimate the duration, the work period of the activities was obtained; Develop the schedule, the base schedule, base costs and the base quality of the project were obtained, the techniques to control the project threshold were obtained. Finally, the investigation provided positive results before the proposal for the application of the PMBOK Guide, to strengthen Schedule, Cost and Quality Management, using the PMBOK guidelines, culminating on May 15, 2022, with a delay of 21 days on term granted by the client, with the cost including the IGV of 2,151,767.99 soles and achieving a quality of 90% in the delivery of the completed work. (p.7) | en_US |
dc.description.uri | Tesis | es_PE |
dc.format | application/pdf | es_PE |
dc.language.iso | spa | es_PE |
dc.publisher | Universidad Privada Antenor Orrego | es_PE |
dc.relation.ispartofseries | T_CIVIL_2316 | |
dc.rights | info:eu-repo/semantics/openAccess | es_PE |
dc.rights.uri | https://creativecommons.org/licenses/by/4.0/ | es_PE |
dc.source | Universidad Privada Antenor Orrego | es_PE |
dc.source | Repositorio Institucional - UPAO | es_PE |
dc.subject | Gestión de Cronograma | es_PE |
dc.subject | Costos y Calidad | es_PE |
dc.title | Aplicación Guía PMBOK, para Fortalecer Gestión de Cronograma, Costos y Calidad del proyecto Mejoramiento Institución Educativa Inicial N° 1617. Sarín. | es_PE |
dc.type | info:eu-repo/semantics/bachelorThesis | es_PE |
thesis.degree.level | Título Profesional | es_PE |
thesis.degree.grantor | Universidad Privada Antenor Orrego. Facultad de Ingeniería | es_PE |
thesis.degree.name | Ingeniero Civil | es_PE |
thesis.degree.discipline | Ingeniería Civil | es_PE |
dc.subject.ocde | https://purl.org/pe-repo/ocde/ford#2.01.00 | es_PE |
renati.advisor.orcid | https://orcid.org/0000-0001-9168-8258 | es_PE |
renati.author.dni | 74148541 | |
renati.author.dni | 71947584 | |
renati.advisor.dni | 18112316 | |
renati.type | https://purl.org/pe-repo/renati/type#tesis | es_PE |
renati.level | https://purl.org/pe-repo/renati/level#tituloProfesional | es_PE |
renati.discipline | 732016 | es_PE |
renati.juror | Vega Benites, Jorge Antonio | |
renati.juror | López Carranza, Atilio Rubén | |
renati.juror | Gálvez Paredes, José Alcides | |
dc.publisher.country | PE | es_PE |