Show simple item record

dc.contributor.advisorGálvez Paredes, José Alcides
dc.contributor.authorVásquez Ulloa, Guillermo Santiago
dc.contributor.authorCabrejos Valdez, Luis Ángel
dc.creatorVásquez Ulloa, Guillermo Santiago
dc.date.accessioned2023-12-07T12:51:05Z
dc.date.available2023-12-07T12:51:05Z
dc.date.issued2023
dc.identifier.urihttps://hdl.handle.net/20.500.12759/13911
dc.description.abstractLa presente investigación tuvo el objetivo de mejorar la productividad en la ejecución del proyecto multifamiliar Residencial Montecarlo, para lo cual se hizo la implementación de la metodologia Last Planner System. Fue una investigación de tipo aplicada, desarrollada con un diseño experimental, en la que se analizaron datos antes y después de la implementación, a fin de corroborar si estadísticamente hubo una mejora en los índices de productividad del proyecto. El análisis previo de la situación de la obra reveló que esta se encontraba con un desempeño deficiente, donde las tareas programadas no eran realizadas en las cantidades y tiempo estimados, con un porcentaje de cumplimiento de 68.89%, lo que para la décima semana representaba un 3.00% de atraso acumulado. Posteriormente, con la realización de las sesiones de planificación, la identificación y levantamiento de restricciones, se obtuvo un porcentaje de cumplimiento promedio del 95.00%, donde únicamente se presentó un incumplimiento de 2 actividades programadas. Se aplicó el análisis de medias estadísticas para determinar la existencia de un cambio significativo en la productividad obtenida en ambos periodos, utilizando la prueba de rangos con signo de Wilcoxon, cuyo resultado arrojó que la productividad obtenida después de la implementación es distinta de la inicial, que también evidenció tener un índice de cumplimiento del cronograma mayor a 1.00, por lo que la obra pasó a estar adelantada respecto a la planificación inicial del proyecto, concluyéndose que hubo una mejora en la productividad.es_PE
dc.description.abstractThe present investigation had the objective of improving productivity in the execution of the Montecarlo Residential multifamily project, for which the implementation of the Last Planner System methodology was carried out. It was an applied type of research, developed with an experimental design in which data was analyzed before and after implementation, in order to corroborate if statistically there was an improvement in the project's productivity indices. The previous analysis of the situation of the work revealed that it was performing poorly, where the scheduled tasks were not carried out in the estimated quantities and time, with a compliance percentage of 68.89%, which for the tenth week represented a 3.00% accumulated delay. Subsequently, with the completion of the planning sessions, the identification and lifting of restrictions, an average compliance percentage of 95.00% was obtained, where only one breach of 2 scheduled activities occurred. The analysis of statistical means was applied to determine the existence of a significant change in the productivity obtained in both periods, using the Wilcoxon signed rank test, whose result showed that the productivity obtained after the implementation is different from the initial one, which also evidenced having a schedule compliance rate greater than 1.00, so that the work began to be ahead of the initial planning of the project, concluding that there was an improvement in productivity.es_PE
dc.description.uriTesises_PE
dc.formatapplication/pdfes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada Antenor Orregoes_PE
dc.relation.ispartofseriesT_CIVIL_2354
dc.rightsinfo:eu-repo/semantics/closedAccesses_PE
dc.rights.urihttps://creativecommons.org/licenses/by/4.0/es_PE
dc.sourceUniversidad Privada Antenor Orregoes_PE
dc.sourceRepositorio Institucional UPAOes_PE
dc.subjectLast Planner Systemes_PE
dc.subjectPlan Maestroes_PE
dc.titleImplementación de la Metodología Last Planner System para optimizar la productividad en la ejecución del proyecto multifamiliar Residencial Montecarlo, Trujillo 2022es_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.grantorUniversidad Privada Antenor Orrego. Facultad de Ingenieriaes_PE
thesis.degree.nameIngeniero Civiles_PE
thesis.degree.disciplineIngenieria Civiles_PE
dc.subject.ocdehttp://purl.org/pe-repo/ocde/ford#2.01.00es_PE
renati.advisor.orcidhttps://orcid.org/0000-0002-2100-4241es_PE
renati.author.dni18888547
renati.author.dni41626010
renati.advisor.dni18217072
renati.typehttp://purl.org/pe-repo/renati/type#tesises_PE
renati.levelhttp://purl.org/pe-repo/renati/level#tituloProfesionales_PE
renati.discipline732016es_PE
renati.jurorHurtado Zamora, Oswaldo
renati.jurorMerino Martínez, Marcelo Edmundo
renati.jurorChuquilin Delgado, María Florencia
dc.publisher.countryPEes_PE


Files in this item

Thumbnail
Thumbnail
Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record

info:eu-repo/semantics/closedAccess
Except where otherwise noted, this item's license is described as info:eu-repo/semantics/closedAccess