dc.description.abstractLast Planner System es una de las herramientas más útiles con las que cuenta Lean Construction para controlar la variabilidad en la planificación. Es decir, reducir imprevistos y cumplir plazos de entrega. Así mismo se puede definir como un método de flujo de trabajo -utilizado mayormente en el sector Construcción- que permite aumentar la productividad y la responsabilidad de los colaboradores. Logrando así objetivos como; eliminación de desperdicios, flujo continuo de trabajo, oportunidades de mejora, reducción de costos y satisfacción final del cliente. El presente trabajo de investigación tiene como finalidad implementar el Last Planner System a la construcción de la obra Parque Eólico San Juan de Marcona, ubicados en el distrito de San Juan de Marcona, Provincia de Nazca, Región de Ica. La investigación por su finalidad es de tipo aplicativa y de acuerdo a la técnica de contrastación es descriptiva. La investigación se realizó con la finalidad de controlar la variabilidad en la planificación y ejecución de los trabajos, para ellos se utilizaron los pasos y herramientas de Last Planner System, para comenzar se dividió el parque eólico en 23 sectores (uno por cada aerogenerador construido), posteriormente se realizó cronograma maestro, una programación intermedia o look ahead, se realizó la identificación de restricciones y se asignaron responsables, finalmente se elaboraron planes semanales con lo que obtuvimos los porcentajes de avances ejecutados con respecto a los trabajos programados también llamado PPC (porcentaje de plan cumplido)es_PE
dc.description.abstractLast Planner System is one of the most useful tools that Lean Construction has to control variability in planning. That is, reduce unforeseen events and meet delivery deadlines. Likewise, it can be defined as a workflow method -used mostly in the Construction sector- that allows to increase the productivity and responsibility of the collaborators. Thus, achieving objectives such as; elimination of waste, continuous flow of work, opportunities for improvement, cost reduction and final customer satisfaction. The purpose of this research work is to implement the Last Planner System for the construction of the San Juan de Marcona Wind Farm, located in the district of San Juan de Marcona, Province of Nazca, Region of Ica. The research for its purpose is of an applicative type and according to the contrasting technique it is descriptive. The investigation was carried out in order to control the variability in the planning and execution of the works, for which the steps and tools of the Last Planner System were used, to begin with, the wind farm was divided into 23 sectors (one for each built wind turbine). Subsequently, a master schedule was carried out, an intermediate programming or look ahead, the restrictions were identified and managers were assigned, finally, weekly plans were prepared with which we obtained the percentages of progress executed with respect to the scheduled work, also called PPC (percentage of plan fulfilled)es_PE
dc.description.uriTesises_PE
dc.formatapplication/pdfes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada Antenor Orregoes_PE
dc.relation.ispartofseriesM_ING_208
dc.rightsinfo:eu-repo/semantics/openAccesses_PE
dc.rights.urihttps://creativecommons.org/licenses/by/4.0/es_PE
dc.sourceUniversidad Privada Antenor Orregoes_PE
dc.sourceRepositorio Institucional - UPAOes_PE
dc.subjectlast planner systemes_PE
dc.subjectcronograma maestroes_PE
dc.subjectrestriccioneses_PE
dc.titlePlanificación con last planner system de la obra parque eólico San Juan de Marconaes_PE
dc.typeinfo:eu-repo/semantics/masterThesises_PE
thesis.degree.levelMaestríaes_PE
thesis.degree.grantorUniversidad Privada Antenor Orrego. Escuela de Postgradoes_PE
thesis.degree.nameMaestro en Gerencia en la Construcción Modernaes_PE
thesis.degree.disciplineMaestría en Ingenieríaes_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.01.03es_PE
renati.advisor.orcidhttps://orcid.org/0000-0003-2612-3298es_PE
renati.author.dni72980453
renati.advisor.dni18074977
renati.typehttps://purl.org/pe-repo/renati/type#tesises_PE
renati.levelhttps://purl.org/pe-repo/renati/level#maestroes_PE
renati.discipline732207es_PE
renati.jurorVega Benites, Jorge Antonio
renati.jurorVértiz Malabrigo, Manuel Alberto
renati.jurorGálvez Paredes, José Alcides
dc.publisher.countryPEes_PE


Ficheros en el ítem

Thumbnail
Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(es)

Mostrar el registro sencillo del ítem

info:eu-repo/semantics/openAccess
Excepto si se señala otra cosa, la licencia del ítem se describe como info:eu-repo/semantics/openAccess