dc.contributor.advisor | Caballero García, Ana María | |
dc.contributor.author | Nieves Ibáñez, Víctor Andreé | |
dc.contributor.author | Córdova Villalobos, Marco Junior | |
dc.creator | Nieves Ibáñez, Víctor Andreé | |
dc.date.accessioned | 2024-03-12T19:36:20Z | |
dc.date.available | 2024-03-12T19:36:20Z | |
dc.date.issued | 2024 | |
dc.identifier.uri | https://hdl.handle.net/20.500.12759/23911 | |
dc.description.abstract | El presente trabajo de investigación tiene por objetivo diseñar la distribución del
almacén de la empresa comercializadora de bicicletas, juguetes y otros artículos
APOLO KITS, con la finalidad de mejorar los indicadores de gestión de inventarios.
Los problemas principales son el desorden de los almacenes y la ubicación
inadecuada de la mercadería, dificultando el trabajo del personal en la búsqueda
del producto, que producen tiempos improductivos en el proceso de preparación de
pedidos (picking) y por ende la insatisfacción de los clientes. Para resolver los
problemas se aplicaron las técnicas de clasificación ABC, Pareto y el Systematic
Layout Planning (SLP) para el diseño de distribución del almacén. Se encontró que
inicialmente el tiempo para atender es de 0.3845 minutos por producto y de 45.17
minutos por pedido. El costo actual de la mano de obra directa para la atención de
un producto es de 0.17 soles y para pedido 19.91 soles. Las bicicletas representan
el 25% y los juguetes el 21% de las ventas anuales ubicándose en la clase A. La
nueva distribución del almacén ubica a las bicicletas en el nivel 7 en cinco zonas,
en la zona 7A se distribuirá dos sub zonas, en la 7B dos subzonas, en 7C dos
subzonas, en 7D cinco subzonas y en 7E dos subzonas. En en el nivel 6 se ubican
6 zonas principales al igual en el nivel 7. En el nivel 6 se ubican artículos del hogar,
mochilas y accesorios de bicicleta en cinco zonas. Se propone tres procedimientos
de movimientos los mismo que fueron aplicados en los tres niveles de
almacenamiento. Con la nueva distribución de planta el tiempo de atención por
pedido se reduce a 16.5 minutos y por producto a 0.0831 minutos y el costo de la
mano de obra de preparación de un pedido es de S/ 7.12 y por producto es de S/
0.04. La inversión de S/ 6,930.00 en la implementación de la nueva distribución
genera un ahorro mensual de 911. 70 soles y el tiempo de recuperación de la
inversión es de 6.72 meses | es_PE |
dc.description.abstract | The objective of this research work is to design the distribution of the warehouse of
the company that sells bicycles, toys and other items, APOLO KITS, in order to
improve the inventory management indicators. The main problems are the disorder
of the warehouses and the inadequate location of the merchandise, hindering the
work of the staff in the search for the product, which produce unproductive times in
the order preparation process (picking) and therefore customer dissatisfaction. To
solve the problems, the ABC and Pareto classification techniques and the
Systematic Layout Planning (SLP) were applied for the warehouse distribution
design. It was found that initially the time to serve is 0.3845 minutes per product and
45.17 minutes per order. The current cost of direct labor for the attention of a product
is 0.17 soles and for order 19.91 soles. Bicycles represent 25% and toys 21% of
annual sales, placing them in class A. The new distribution of the warehouse places
bicycles on level 7 in five zones, in zone 7A two sub zones will be distributed, in 7B
has two subzones, 7C has two subzones, 7D has five subzones and 7E has two
subzones. At level 6, there are 6 main areas, as well as at level 7. At level 6,
household items, backpacks, and bicycle accessories are located in five areas.
Three movement procedures are proposed, the same ones that were applied in the
three storage levels. With the new layout of the plant, the attention time per order is
reduced to 16.5 minutes and per product to 0.0831 minutes, and the cost of labor to
prepare an order is S/ 7.12 and per product is S/ 0.04. The investment of S/ 6,930.00
in the implementation of the new distribution generates a monthly saving of 911.70
soles and the recovery time of the investment is 6.72 months | es_PE |
dc.description.uri | Tesis | es_PE |
dc.format | application/pdf | es_PE |
dc.language.iso | spa | es_PE |
dc.publisher | Universidad Privada Antenor Orrego | es_PE |
dc.relation.ispartofseries | T_IND_304 | |
dc.rights | info:eu-repo/semantics/openAccess | es_PE |
dc.rights.uri | https://creativecommons.org/licenses/by/4.0/ | es_PE |
dc.source | Repositorio Institucional - UPAO | es_PE |
dc.source | Universidad Privada Antenor Orrego | es_PE |
dc.subject | Distribución en planta | es_PE |
dc.subject | Systematic Layout Planning | es_PE |
dc.title | Diseño de distribución del almacén de Apolo Kits para mejorar los indicadores de gestión de inventarios | es_PE |
dc.type | info:eu-repo/semantics/bachelorThesis | es_PE |
thesis.degree.level | Título Profesional | es_PE |
thesis.degree.grantor | Universidad Privada Antenor Orrego. Facultad de Ingeniería | es_PE |
thesis.degree.name | Ingeniero Industrial | es_PE |
thesis.degree.discipline | Ingeniería Industrial | es_PE |
dc.subject.ocde | https://purl.org/pe-repo/ocde/ford#2.11.04 | es_PE |
renati.advisor.orcid | https://orcid.org/0000-0003-2876-9746 | es_PE |
renati.author.dni | 75402488 | |
renati.author.dni | 71535623 | |
renati.advisor.dni | 32778744 | |
renati.type | https://purl.org/pe-repo/renati/type#tesis | es_PE |
renati.level | https://purl.org/pe-repo/renati/level#tituloProfesional | es_PE |
renati.discipline | 722026 | es_PE |
renati.juror | Müller Solón, José Antonio | |
renati.juror | Landeras Pilco, María Isabe | |
renati.juror | León Culquichicón, Jorge Iván | |
dc.publisher.country | PE | es_PE |