Mostrar el registro sencillo del ítem

dc.contributor.advisorNarvaez Aranda, Ricardo
dc.contributor.authorExebio Lozano, Carol Gretel
dc.creatorExebio Lozano, Carol Gretel
dc.date.accessioned2017-04-26T17:18:51Z
dc.date.available2017-04-26T17:18:51Z
dc.date.issued2016
dc.identifier.urihttps://hdl.handle.net/20.500.12759/2549
dc.description.abstractLa presente investigación, se propuso generar un plan de gestión de riesgo para el Sistema de agua potable y Saneamiento básico de la localidad de Sayapampa en el Distrito de Curgos, Provincia de Sánchez Carrión, Departamento de La Libertad. Este plan posee especial importancia pues Curgos es el distrito que presenta el menor número de sistemas de agua a nivel Nacional, siendo un lugar donde el Estado está empezando a impulsar su instalación para disminuir la brecha de pobreza y pobreza extrema incrementada en los últimos años. En la presente investigación, se aplicó las metodologías sugeridas en la Guía PMBoK del Project Management Institute (PMI), donde se establecen una serie de pautas para la elaboración de un plan de gestión de riesgos bien estructurado; adicionalmente se utilizaron las salidas del programa Crystal ball para la simulación del análisis cuantitativo. En este contexto, el plan de gestión de riesgo diseñado para el Sistema de agua potable y Saneamiento básico para la localidad de Sayapampa, inicialmente determino todos los riesgos potenciales presentes en el sistema actual de saneamiento básico mediante métodos convencionales, luego estableció las características de un análisis de gestión de riesgo aplicable a otros procesos similares. Cuenta con una evaluación cualitativa y cuantitativa de los riesgos identificados. Por último desarrolla un plan de respuesta a los riesgos identificados para el Sistema de agua potable y Saneamiento básico de la localidad en estudio. En la elaboración de los planes de respuesta, únicamente se enfocó el análisis a los riesgos clasificados como riesgos altos, sin embargo se presenta la lista completa de los riesgos identificados, pues las condiciones del proyecto pueden variar y algún riesgo desestimado en esta etapa puede requerir ser revisado en una etapa posterior.En el análisis cuantitativo de los costos para la operatividad del sistema, se presenta una deficiencia en los costos ya que los costos cubrirían solo el 53.17% en caso de ocurrir algún evento, siendo el valor aceptable mínimo de 55%. Esto debido a que los costos son mínimos ya que la obra ya está ejecutada y corresponden solo a las medidas de mitigación.es_PE
dc.description.abstractThe goal of this study is to elaborate a risk management plan for the water and sewer system in Sayapampa, distric of Curgos, province of Sanchez Carrion, department of la Libertad. This study is relevant since Curgos is the district with the least number of water systems in the nation and the Federal government has started the development of water projects in order to reduce the poverty levels. In this study the methodology and guidelines suggested by the Project Management Institute (PMI) was followed. In addition, outputs from Crystal ball were taken into consideration for the quantitative analyses. In this context, a risk management plan for the water and sewer system in Sayapampa was developed. To begin with, all the potential risks were identified with conventional methods, and then a risk management plan was established in order to be used in similar projects. All risks were evaluated qualitatively and quantitatively. Finally, a response plan is developed for the water and sewer system in Sayapampa. In the response plan, only the high risk events were considered. However, all risks are presented in case a change in conditions would make these low risk events relevant. In the quantitative analysis for the operating cost, a deficiency is observed. The current estimate would cover only 53.17% in case an adverse event happens. The minimum acceptable cut off is 55% due to the Project already being executed and the cost is only for contingency events. In the quantitative schedule analysis in Sayapampa, if adverse events are present, 13 months would be necessary to cover with 80% of certainty all the project stages.en_US
dc.description.uriTesises_PE
dc.formatapplication/pdfes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada Antenor Orrego - UPAOes_PE
dc.relation.ispartofseriesM_ING_051
dc.rightsinfo:eu-repo/semantics/openAccesses_PE
dc.sourceUniversidad Privada Antenor Orregoes_PE
dc.sourceRepositorio institucional - UPAOes_PE
dc.subjectSistema de Agua Potablees_PE
dc.subjectCaserio de Sayapampaes_PE
dc.titlePlan de gestión de riesgos para la obra del sistema de agua potable e instalación de letrinas en el caserío de sayapampa distrito de curgos - Sánchez Carrión - la libertades_PE
dc.typeinfo:eu-repo/semantics/masterThesises_PE
thesis.degree.levelMaestríaes_PE
thesis.degree.grantorUniversidad Privada Antenor Orrego. Escuela de Postgradoes_PE
thesis.degree.nameMaestro en Gerencia de la Construcción Modernaes_PE
thesis.degree.disciplineMaestría en Ingenieríaes_PE


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(es)

Mostrar el registro sencillo del ítem