dc.contributor.advisor | Hurtado Zamora, Oswaldo | |
dc.contributor.author | Gómez Pastor, Ruth Elisabeth | |
dc.creator | Gómez Pastor, Ruth Elisabeth | |
dc.date.accessioned | 2024-04-01T23:17:08Z | |
dc.date.available | 2024-04-01T23:17:08Z | |
dc.date.issued | 2024 | |
dc.identifier.uri | https://hdl.handle.net/20.500.12759/25711 | |
dc.description.abstract | Para la investigación, se plantea como objetivo principal mejorar la
productividad del proceso de ejecución en la subpartida de asentado de muros
de ladrillo del proyecto fábrica Llampayec, ubicado en Lambayeque. La
investigación por su finalidad es de tipo aplicativa y de acuerdo a la técnica
de contrastación es descriptiva. Para medir la productividad durante la
ejecución de la obra, se aplicó la Carta Balance de la metodología de Lean
Construction, como herramienta evaluadora y de control periódico en el
avance de trabajos productivos, contributorio y no contributorio.
La información obtenida en campo, se ha procesado y analizado,
determinando los índices de la productividad en el desarrollo de cada una de
las actividades correspondiente a los trabajos, mediante la técnica de
observación y documentación en campo, con los que se elabora el diagrama
de flujo de la metodología Lean Construction; identificando de esta manera
la actividad de acarreo de materiales, como la actividad vinculante principal
a la actividad de asentado de ladrillo. Realizando un comparativo de
rendimientos obtenidos en campo, con los rendimientos estandarizados de
CAPECO. Con lo obtenido y teniendo en cuanta el metrado que falta ejecutar,
se plantean las estrategias de mejora, con la mejor distribución del personal
según su desempeño y la implementación de charlas de control-motivacional.
Evidenciándose con la aplicación de la Carta Balance la mejora de la
productividad en la ejecución de la partida de asentado de muros de ladrillos | es_PE |
dc.description.abstract | For the research, the main objective is to improve the productivity of the execution
process in the subheading of laying brick walls of the Llampayec factory project,
located in Lambayeque. The research for its purpose is of an applicative type and
according to the contrasting technique it is descriptive. To measure productivity
during the execution of the work. The Balance Sheet of the Lean Construction
methodology was applied as an evaluation and periodic control tool in the progress
of productive, contributory and non-contributory works. The information obtained
in the field has been processed and analyzed, determining the productivity indices
in the development of each of the activities corresponding to the works. Through
the technique of observation and documentation in the field. With which the
flowchart of the Lean Construction methodology is elaborated; thus identifying the
material hauling activity as the main binding activity to the brick laying activity.
Making a comparison of yields obtained in the field, with the standardized yields
of CAPECO. With what was obtained and taking into account the measurement that
needs to be executed, improvement strategies are proposed, with the best
distribution of personnel according to their performance and the implementation of
motivational-control talks. Evidencing with the application of the Balance Letter
the improvement of productivity in the execution of the game of settling of brick
walls | es_PE |
dc.description.uri | Tesis | es_PE |
dc.format | application/pdf | es_PE |
dc.language.iso | spa | es_PE |
dc.publisher | Universidad Privada Antenor Orrego | es_PE |
dc.relation.ispartofseries | M_ING_215 | |
dc.rights | info:eu-repo/semantics/embargoedAccess | es_PE |
dc.rights.uri | https://creativecommons.org/licenses/by/4.0/ | es_PE |
dc.source | Universidad Privada Antenor Orrego | es_PE |
dc.source | Repositorio Institucional - UPAO | es_PE |
dc.subject | Carta Balance | es_PE |
dc.subject | Lean construction | es_PE |
dc.subject | productividad | es_PE |
dc.title | Mejoramiento de la productividad, aplicando la herramienta de carta balance en las partidas de arquitectura, de la fábrica Llampayec - Lambayeque | es_PE |
dc.type | info:eu-repo/semantics/masterThesis | es_PE |
thesis.degree.level | Maestría | es_PE |
thesis.degree.grantor | Universidad Privada Antenor Orrego. Escuela de Postgrado | es_PE |
thesis.degree.name | Maestro en Gerencia en la Construcción Moderna | es_PE |
thesis.degree.discipline | Maestría en Ingeniería | es_PE |
dc.subject.ocde | https://purl.org/pe-repo/ocde/ford#2.01.03 | es_PE |
renati.advisor.orcid | https://orcid.org/0000-0003-2612-3298 | es_PE |
renati.author.dni | 47016684 | |
renati.advisor.dni | 18074977 | |
renati.type | https://purl.org/pe-repo/renati/type#tesis | es_PE |
renati.level | https://purl.org/pe-repo/renati/level#maestro | es_PE |
renati.discipline | 732207 | es_PE |
renati.juror | Vega Benites, Jorge Antonio | |
renati.juror | Poémape Aguilar, Sandra Elizabeth | |
renati.juror | Cerna Sánchez, Eduardo Elmer | |
dc.publisher.country | PE | es_PE |
dc.date.embargoEnd | 2027-04-01 | |