dc.contributor.advisor | Ruiz Flores, Mario | |
dc.contributor.author | Asencio Iparraguirre, Bruno Alberto Mario | |
dc.contributor.author | Toro Burga, Carlos Manuel | |
dc.creator | Asencio Iparraguirre, Bruno Alberto Mario | |
dc.date.accessioned | 2017-11-07T20:47:12Z | |
dc.date.available | 2017-11-07T20:47:12Z | |
dc.date.issued | 2017 | |
dc.identifier | T_CONT_514 | |
dc.identifier.other | T046_47049407T | |
dc.identifier.other | T046_46081290T | |
dc.identifier.uri | https://hdl.handle.net/20.500.12759/3254 | |
dc.description.abstract | El presente trabajo de investigación tiene como objetivo demostrar que la aplicación de un
sistema de costos por órdenes de producción incide en la determinación de costo y precio en
la construcción losa de concreto y cerco metálico – terminal Salaverry, distrito de Salaverry,
año 2016. Ante la realidad problemática de las empresas constructoras de la ciudad de
Trujillo observamos que no son eficientes en el establecimiento del costo y precio al
momento de presentarse a las distintas licitaciones, lo cual genera información errónea al
final de cada obra realizada. La investigación realizada a la constructora Construc Tech
S.A.C; demuestra que la aplicación de un sistema de costos por órdenes de producción logra
establecer el costo y precio para cada licitación y mejora la rentabilidad de la empresa.
En el estudio de la situación actual de la empresa se utilizó instrumentos de recolección de
datos, tales como realizar la encuesta al gerente y a los supervisores encargados de la obra.
Una vez obtenida la información se procedió a elaborar y aplicar el diseño del sistema de
costos por órdenes de producción según las características y la especialidad de obras que
realiza la empresa, integrando el nuevo sistema de costos, cuadros que cumplen con el
adecuado funcionamiento para el logro de los objetivos.
Finalmente, la aplicación del sistema de costos propuesto ordeno nuestros procesos de
producción, optimizo mano de obra y disminuyo el tiempo de cada proceso, contribuyendo
de manera significativa en el establecimiento del costo y precio y mejorando de la
rentabilidad de cada obra de la empresa Construc Tech S.A.C; como referencia nuestra
hipótesis. | es_PE |
dc.description.abstract | The objective of this research is to demonstrate that the application of a system of costs by
production orders affects the determination of cost and price in the concrete slab and metal
- terminal fence construction Salaverry, Salaverry district, The problematic reality of the
construction companies of the city of Trujillo we observe that they are not efficient in the
establishment of the cost and price at the moment of being presented to the different tenders,
which generates erroneous information at the end of each realized work. The research carried
out at the construction company Construc Tech S.A.C; Demonstrate that the application of
a system of costs by orders of production will be able to establish the cost and price for each
tender and improve the profitability of the company.
In the study of the current situation of the company was used data collect ion instruments,
such as conducting the survey to the manager and supervisors in charge of the work.
Once the information was obtained, the design of the production cost system was developed
and applied according to the characteristics and the specialty of works carried out by the
company, integrating the new cost system, tables that comply with the proper functioning of
the system. Achievement of objectives.
Finally, the application of the proposed cost system ordered our production processes,
optimized manpower and reduced the time of each process, contributing significantly in the
establishment of cost and price and improving the profitability of each work of the company
Construc Tech SAC; As a reference our hypothesis. | en_US |
dc.description.uri | Tesis | es_PE |
dc.format | application/pdf | es_PE |
dc.language.iso | spa | es_PE |
dc.publisher | Universidad Privada Antenor Orrego | es_PE |
dc.relation.ispartofseries | T_CONT_514 | |
dc.rights | info:eu-repo/semantics/openAccess | es_PE |
dc.rights.uri | https://creativecommons.org/licenses/by/4.0/ | es_PE |
dc.source | Universidad Privada Antenor Orrego | es_PE |
dc.source | Repositorio Institucional - UPAO | es_PE |
dc.subject | Costos por Ordenes de Produccion | es_PE |
dc.subject | Losa de Concreto y Cerco | es_PE |
dc.title | Sistema de costos por ordenes de producción y su incidencia en la determinación del costo y precio en la construcción Losa de Concreto y Cerco Metálico - Terminal Salaverry, Distrito de Salaverry, año 2016 | es_PE |
dc.type | info:eu-repo/semantics/bachelorThesis | es_PE |
thesis.degree.level | Título Profesional | es_PE |
thesis.degree.grantor | Universidad Privada Antenor Orrego. Facultad de Ciencias Económicas | es_PE |
thesis.degree.name | Contador Público | es_PE |
thesis.degree.discipline | Contabilidad | es_PE |
dc.subject.ocde | https://purl.org/pe-repo/ocde/ford#5.02.04 | es_PE |
renati.type | https://purl.org/pe-repo/renati/type#tesis | es_PE |
renati.level | https://purl.org/pe-repo/renati/level#tituloProfesional | es_PE |
dc.publisher.country | PE | es_PE |