dc.contributor.advisor | López Carranza, Atilio Rubén | |
dc.contributor.author | Briceño Torres, Augusto Noe | |
dc.contributor.author | Cruz Rodríguez, Alan Patrick | |
dc.creator | Briceño Torres, Augusto Noe | |
dc.date.accessioned | 2024-08-09T15:10:53Z | |
dc.date.available | 2024-08-09T15:10:53Z | |
dc.date.issued | 2024 | |
dc.identifier.uri | https://hdl.handle.net/20.500.12759/37071 | |
dc.description.abstract | Con el paso de los años los proyectos de construcción bajo una
metodología tradicional presentan muchas incongruencias, de esta
manera se busca con este estudio la aplicación de la metodología BIM
(Building Information Modeling) en la elaboración de proyectos, lo cual nos
permite presentar valores más reales y tener una perspectiva de una
construcción de manera digital.
Mediante el uso de herramientas BIM, realizamos un modelado 3D en el
software Revit 2021, importando los planos 2D del expediente técnico para
calzar de manera exacta los elementos que lo conforman (Estructura y
Arquitectura), conforme se iba avanzando el modelado, se pudo notar
pequeñas interferencias. Luego con el análisis en el software Navisworks,
donde arrojaron 73 incompatibilidades que se corrigieron posteriormente.
A través de la comparativa entre Tradicional y BIM, evidenciamos que en
la primera hay carencia de criterio para metrar y se sobremetraron partidas
importantes acero y concreto, lo cual condujo un sobrepresupuesto del
proyecto.
En nuestro estudio del “Local Escolar 1611”, ubicado en el distrito de
Mache, se evidencio una reducción en el presupuesto 3.40% equivalente
en soles a S/. 37,977.32, con esto permite mejor toma de decisiones entre
involucrados, gestión de recursos y evitando posibles adicionales y
deductivos en proyectos de infraestructura, puesto que, para edificaciones
por ser suma alzada es más complejo la aprobación de una prestación | es_PE |
dc.description.abstract | Over the years, construction projects under a traditional methodology
present many inconsistencies. In this way, this study seeks to apply the
BIM (Building Information Modeling) methodology in the development of
projects, which allows us to present more values. real and have a
perspective of a construction digitally.
Through the use of BIM tools, we carried out 3D modeling in the Revit 2021
software, importing the 2D plans from the technical file to accurately fit the
elements that make it up (Structure and Architecture), as the modeling
progressed, it was possible to notice small interferences. Then with the
analysis in the Navisworks software, where they showed 73
incompatibilities that were later corrected.
Through the comparison between Traditional. and BIM, we show that in the
former there is a lack of criteria for metering and important steel and
concrete items were overmeasured, which led to an overbudget for the
project.
In our study of “Local Escolar 1611”, located in the Mache district, a
reduction in the budget of 3.40% equivalent in soles to S/. 37,977.32, with
this it allows better decision-making among those involved, management
of resources and avoiding possible additional and deductive in
infrastructure projects, since, for buildings, because it is a lump sum, the
approval of a benefit is more complex | es_PE |
dc.description.uri | Tesis | es_PE |
dc.format | application/pdf | es_PE |
dc.language.iso | spa | es_PE |
dc.publisher | Universidad Privada Antenor Orrego | es_PE |
dc.relation.ispartofseries | T_CIVIL_2556 | |
dc.rights | info:eu-repo/semantics/closedAccess | es_PE |
dc.rights.uri | https://creativecommons.org/licenses/by/4.0/ | es_PE |
dc.subject | Modelado BIM | es_PE |
dc.subject | Revit | es_PE |
dc.title | Análisis comparativo aplicando la metodología BIM en la Especialidad de Estructuras y Arquitectura del Local Escolar 1611, Distrito de Mache | es_PE |
dc.type | info:eu-repo/semantics/bachelorThesis | es_PE |
thesis.degree.grantor | Universidad Privada Antenor Orrego. Facultad de Ingenieria | es_PE |
thesis.degree.name | Ingeniero Civil | es_PE |
thesis.degree.discipline | Ingenieria Civil | es_PE |
dc.subject.ocde | https://purl.org/pe-repo/ocde/ford#2.01.00 | es_PE |
renati.advisor.orcid | https://orcid.org/0000-0002-3631-2001 | es_PE |
renati.author.dni | 70220309 | |
renati.author.dni | 71559367 | |
renati.advisor.dni | 32965940 | |
renati.type | https://purl.org/pe-repo/renati/type#tesis | es_PE |
renati.level | https://purl.org/pe-repo/renati/level#tituloProfesional | es_PE |
renati.discipline | 732016 | es_PE |
renati.juror | Hurtado Zamora, Oswaldo | |
renati.juror | Galvez Paredes, José Alcides | |
renati.juror | Medina Carbajal, Lucio Sigifredo | |
dc.publisher.country | PE | es_PE |