dc.description.abstractCon el paso de los años los proyectos de construcción bajo una metodología tradicional presentan muchas incongruencias, de esta manera se busca con este estudio la aplicación de la metodología BIM (Building Information Modeling) en la elaboración de proyectos, lo cual nos permite presentar valores más reales y tener una perspectiva de una construcción de manera digital. Mediante el uso de herramientas BIM, realizamos un modelado 3D en el software Revit 2021, importando los planos 2D del expediente técnico para calzar de manera exacta los elementos que lo conforman (Estructura y Arquitectura), conforme se iba avanzando el modelado, se pudo notar pequeñas interferencias. Luego con el análisis en el software Navisworks, donde arrojaron 73 incompatibilidades que se corrigieron posteriormente. A través de la comparativa entre Tradicional y BIM, evidenciamos que en la primera hay carencia de criterio para metrar y se sobremetraron partidas importantes acero y concreto, lo cual condujo un sobrepresupuesto del proyecto. En nuestro estudio del “Local Escolar 1611”, ubicado en el distrito de Mache, se evidencio una reducción en el presupuesto 3.40% equivalente en soles a S/. 37,977.32, con esto permite mejor toma de decisiones entre involucrados, gestión de recursos y evitando posibles adicionales y deductivos en proyectos de infraestructura, puesto que, para edificaciones por ser suma alzada es más complejo la aprobación de una prestaciónes_PE
dc.description.abstractOver the years, construction projects under a traditional methodology present many inconsistencies. In this way, this study seeks to apply the BIM (Building Information Modeling) methodology in the development of projects, which allows us to present more values. real and have a perspective of a construction digitally. Through the use of BIM tools, we carried out 3D modeling in the Revit 2021 software, importing the 2D plans from the technical file to accurately fit the elements that make it up (Structure and Architecture), as the modeling progressed, it was possible to notice small interferences. Then with the analysis in the Navisworks software, where they showed 73 incompatibilities that were later corrected. Through the comparison between Traditional. and BIM, we show that in the former there is a lack of criteria for metering and important steel and concrete items were overmeasured, which led to an overbudget for the project. In our study of “Local Escolar 1611”, located in the Mache district, a reduction in the budget of 3.40% equivalent in soles to S/. 37,977.32, with this it allows better decision-making among those involved, management of resources and avoiding possible additional and deductive in infrastructure projects, since, for buildings, because it is a lump sum, the approval of a benefit is more complexes_PE
dc.description.uriTesises_PE
dc.formatapplication/pdfes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada Antenor Orregoes_PE
dc.relation.ispartofseriesT_CIVIL_2556
dc.rightsinfo:eu-repo/semantics/closedAccesses_PE
dc.rights.urihttps://creativecommons.org/licenses/by/4.0/es_PE
dc.subjectModelado BIMes_PE
dc.subjectRevites_PE
dc.titleAnálisis comparativo aplicando la metodología BIM en la Especialidad de Estructuras y Arquitectura del Local Escolar 1611, Distrito de Machees_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.grantorUniversidad Privada Antenor Orrego. Facultad de Ingenieriaes_PE
thesis.degree.nameIngeniero Civiles_PE
thesis.degree.disciplineIngenieria Civiles_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.01.00es_PE
renati.advisor.orcidhttps://orcid.org/0000-0002-3631-2001es_PE
renati.author.dni70220309
renati.author.dni71559367
renati.advisor.dni32965940
renati.typehttps://purl.org/pe-repo/renati/type#tesises_PE
renati.levelhttps://purl.org/pe-repo/renati/level#tituloProfesionales_PE
renati.discipline732016es_PE
renati.jurorHurtado Zamora, Oswaldo
renati.jurorGalvez Paredes, José Alcides
renati.jurorMedina Carbajal, Lucio Sigifredo
dc.publisher.countryPEes_PE


Files in this item

Thumbnail
Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record

info:eu-repo/semantics/closedAccess
Except where otherwise noted, this item's license is described as info:eu-repo/semantics/closedAccess