Mostrar el registro sencillo del ítem

dc.contributor.advisorAlvarado Rodríguez Luis
dc.contributor.authorMontero Castro Carlos
dc.creatorMontero Castro, Carlos
dc.date.accessioned2024-09-16T17:07:57Z
dc.date.available2024-09-16T17:07:57Z
dc.date.issued2024
dc.identifier.urihttps://hdl.handle.net/20.500.12759/42031
dc.description.abstractEl presente informe titulado ""Implementación de XSPOC para Optimización de la Producción de Pozos de la Corporación Nacional de Petróleo de China (CNPC)"" detalla la implementación del Sistema de Control de Producción Optimizado por Pozo (XSPOC) en CNPC. Este sistema se implementó con el objetivo de mejorar la eficiencia operativa y maximizar el rendimiento en la producción de petróleo y gas. La implementación de XSPOC permitió a CNPC monitorear en tiempo real el rendimiento de cada pozo, facilitando la identificación proactiva y resolución de problemas operativos. Esta capacidad de monitoreo permitió tomar decisiones informadas y rápidas, optimizando la producción y minimizando los tiempos de inactividad. El sistema proporcionó una plataforma centralizada para la supervisión y el control de la producción en todos los pozos, lo que permitió una gestión más eficiente y coordinada de los recursos. La consolidación de la información de producción de múltiples pozos en un solo sistema permitió a CNPC identificar tendencias y patrones, mejorando así toda su operación. El proyecto se llevó a cabo en varias etapas: evaluación de necesidades y planificación, selección de tecnología XSPOC, instalación y configuración del sistema, integración con sistemas existentes, capacitación del personal, pruebas y ajustes, y una implementación gradual con evaluación continua. Cada etapa fue diseñada para asegurar que XSPOC cumpliera con los objetivos de CNPC de mejorar la eficiencia operativa y maximizar la producción. Los resultados del proyecto demostraron que XSPOC proporcionó a CNPC las herramientas necesarias para optimizar la producción de petróleo y gas, mejorar la eficiencia operativa y garantizar un rendimiento máximo de sus activos petroleros. En conclusión, la implementación de XSPOC en CNPC ha sido un éxito, proporcionando una mejora significativa en la supervisión y el control de la producción, lo que resulta en una operación más eficiente y productiva.es_PE
dc.description.abstractThis report, titled ""Implementation of XSPOC for Well Production Optimization at China National Petroleum Corporation (CNPC),"" details the implementation of the Optimized Production Control System (XSPOC) at CNPC. This system was implemented to improve operational efficiency and maximize oil and gas production performance. The implementation of XSPOC enabled CNPC to monitor the performance of each well in real time, facilitating proactive identification and resolution of operational issues. This real-time monitoring capability allowed for informed and rapid decision- making, optimizing production and minimizing downtime. The system provided a centralized platform for supervising and controlling production across all wells, enabling more efficient and coordinated resource management. Consolidating production information from multiple wells into a single system allowed CNPC to identify trends and patterns, thereby improving overall operations. The project was carried out in several stages: needs assessment and planning, selection of XSPOC technology, system installation and configuration, integration with existing systems, personnel training, testing and adjustments, and a gradual implementation with continuous evaluation. Each stage was designed to ensure that XSPOC met CNPC's objectives of improving operational efficiency and maximizing production. The project results demonstrated that XSPOC provided CNPC with the necessary tools to optimize oil and gas production, enhance operational efficiency, and ensure maximum performance of its petroleum assets. In conclusion, the implementation of XSPOC at CNPC has been a success, providing significant improvements in production monitoring and control, resulting in a more efficient and productive operation.es_PE
dc.description.uriTrabajo de suficiencia profesionales_PE
dc.formatapplication/pdfes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada Antenor Orregoes_PE
dc.relation.ispartofseriesT_SIST_1539
dc.rightsinfo:eu-repo/semantics/closedAccesses_PE
dc.rights.urihttps://creativecommons.org/licenses/by/4.0/es_PE
dc.subjectXSPOCes_PE
dc.titleImplementación de XSPOC para Optimización de la Producción de Pozos de la Corporación Nacional de Petróleo de China (CNPC)es_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.grantorUniversidad Privada Antenor Orrego. Facultad de Ingenieriaes_PE
thesis.degree.nameIngeniera de Computación y Sistemases_PE
thesis.degree.disciplineIngenieria de Computación y Sistemases_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.02.04es_PE
renati.advisor.orcidhttps:// orcid.org/0000-0001-6444-2922es_PE
renati.author.dni03854186
renati.advisor.dni43344790
renati.typehttps://purl.org/pe-repo/renati/type#trabajoDeSuficienciaProfesionales_PE
renati.levelhttps://purl.org/pe-repo/renati/level#tituloProfesionales_PE
renati.discipline611066es_PE
renati.jurorUrrelo Huiman Luis Vladimir
renati.jurorGaytán Toledo Carlos Alberto
renati.jurorAbanto Cabrera Heber Gerson
dc.publisher.countryPEes_PE


Ficheros en el ítem

Thumbnail
Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(es)

Mostrar el registro sencillo del ítem

info:eu-repo/semantics/closedAccess
Excepto si se señala otra cosa, la licencia del ítem se describe como info:eu-repo/semantics/closedAccess