dc.contributor.advisor | Paredes Estacio, Jorge Luis | |
dc.contributor.author | Macedo Pinillos, Katherine Rosalia | |
dc.contributor.author | Milla Huaman, Edita Magdalena | |
dc.creator | Macedo Pinillos, Katherine Rosalia | |
dc.date.accessioned | 2018-11-09T22:20:14Z | |
dc.date.available | 2018-11-09T22:20:14Z | |
dc.date.issued | 2018 | |
dc.identifier.uri | https://hdl.handle.net/20.500.12759/4460 | |
dc.description.abstract | Esta tesis fue realizada con el fin de crear un modelo de gestión que nos permita
organizar y administrar el proceso de manera correcta, tal que se pueda elaborar el
modelamiento, la planificación, el seguimiento y control de las actividades y de los
recursos (mano de obra, materiales, maquinaria y equipos) de manera eficiente, que
intervienen en el desarrollo de la planificación del Colegio Leoncio Prado de El
Porvenir.
Para ello se propuso la integración de la tecnología 4D (3D + Tiempo) En La
Metodología BIM, que se denomina comúnmente BIM 4D, Para Una mejor gestión del
tiempo. Tras analizar sus requerimientos teóricos, se examinan las diferentes
posibilidades de herramientas BIM 4D así como el flujo de trabajo requerido, haciendo
hincapié tanto en las oportunidades como en las limitaciones.
En el primer capítulo se desarrolla la introducción, es decir, los antecedentes, el
problema, objetivos y el marco teórico la definición e importancia de la metodología
BIM. En el segundo capítulo se describe el material de estudio a emplearse y los
métodos y técnicas. . En el tercer capítulo se desarrollará la descripción de los Software
utilizados para el modelado y planificación del Colegio Leoncio Prado Gutiérrez
En el cuarto capítulo se describe los resultados obtenidos de la detección de
incompatibilidades (Clash Detection), Los metrados obtenidos en Autodesk
Navisworks y la programación con el TimerLine. En el quinto capítulo tenemos la
discusión de resultados de detección de incompatibilidades e interferencias entre el
método tradicional Vs. y Naviswork, los metrados del proyecto en Revit Vs. Excel,
Timerline y Planificacion 4D.
En el sexto y último capítulo, se presentan las conclusiones y recomendaciones
obtenidas de este proyecto. | es_PE |
dc.description.abstract | This thesis was conducted in order to create a management model that allows us to
organize and manage the process correctly, so that it can develop modeling, planning,
monitoring and control of activities and resources (labor labor, materials, machinery
and equipment) efficiently, involved in development planning Leoncio Prado College
of El Porvenir.
This necessitates the integration of 4D technology (3D + time) on the methodology
BIM, commonly called BIM 4D, for better time management was proposed. After
analyzing its theoretical requirements, the different possibilities of BIM 4D tools and
the flow of work required are discussed, emphasizing both opportunities and
constraints.
In the first chapter the introduction, that is, the background, problem, objectives and
theoretical framework the definition and importance of BIM methodology is
developed. In the second chapter the study material to be used and the methods and
techniques described.
In the third chapter the description of the software used for modeling and planning
Leoncio Prado Gutiérrez College will develop.
In the fourth chapter the results of the detection of incompatibilities (CLASH
DETECTION) is described, Los metrados obtained NAVISWORK and programming
with Timerline. In the fifth chapter we have the discussion of results and interference
detection incompatibilities between traditional and Naviswork Vs. method, Revit
project metrados Vs. Excel, Timerline, planning 4D.
In the sixth and final chapter, conclusions and recommendations from this project are
presented. | en_US |
dc.description.uri | Tesis | es_PE |
dc.format | application/pdf | es_PE |
dc.language.iso | spa | es_PE |
dc.publisher | Universidad Privada Antenor Orrego | es_PE |
dc.relation.ispartofseries | T_ING.CIVIL_1620 | |
dc.rights | info:eu-repo/semantics/openAccess | es_PE |
dc.rights.uri | https://creativecommons.org/licenses/by/4.0/ | es_PE |
dc.source | Universidad Privada Antenor Orrego | es_PE |
dc.source | Repositorio Institucional - UPAO | es_PE |
dc.subject | BIM-4D | es_PE |
dc.subject | Planificación | es_PE |
dc.title | Aplicación de herramientas BIM-4D para la disminución de incompatibilidades en la planificación de la construcción del Colegio Leoncio Prado Gutierrez de El Porvenir | es_PE |
dc.type | info:eu-repo/semantics/bachelorThesis | es_PE |
thesis.degree.level | Título Profesional | es_PE |
thesis.degree.grantor | Universidad Privada Antenor Orrego. Facultad de Ingeniería | es_PE |
thesis.degree.name | Ingeniero Civil | es_PE |
thesis.degree.discipline | Ingeniería Civil | es_PE |
dc.subject.ocde | https://purl.org/pe-repo/ocde/ford#2.01.00 | |
renati.type | https://purl.org/pe-repo/renati/type#tesis | |
renati.level | https://purl.org/pe-repo/renati/level#tituloProfesional | |
dc.publisher.country | PE | es_PE |