Mostrar el registro sencillo del ítem
Aplicación del Last Planner System en el proyecto de construcción del canal Sausalito Alto, Distrito de Chao, Virú, La Libertad
dc.contributor.advisor | Vertiz Malabrigo, Manuel Alberto | |
dc.contributor.author | Matos Girón, Wilser Isaú | |
dc.contributor.author | Zavaleta Lujan, Yober Eli | |
dc.creator | Matos Girón, Wilser Isaú | |
dc.date.accessioned | 2024-10-14T15:11:18Z | |
dc.date.available | 2024-10-14T15:11:18Z | |
dc.date.issued | 2024 | |
dc.identifier.uri | https://hdl.handle.net/20.500.12759/44671 | |
dc.description.abstract | Esta investigación tiene por objetivo elaborar un plan de gestión del cronograma, recursos y calidad del proyecto construcción del Canal Sausalito Alto, Distrito De Chao - Virú, La Libertad. Para el cual se realizó la implementación del plan maestro, plan intermedio y plan semanal considerando la sectorización, rendimiento por cuadrillas, asignación del personal por día; así también se realizó el plan de suministro de recurso por componentes y el plan de gestión de calidad considerando métodos de control. Los resultados obtenidos del análisis temporal aplicando el sistema Last Planner System se realizará la ejecución de la obra en un 33.33% menos tiempo que el modelo tradicional y en lo económico se obtiene una reducción de gastos en un 26.53% teniendo una mejor calidad de la obra. Se concluye que la aplicación del Last Planner System en la ejecución de la obra de construcción incrementa la confiabilidad de la planificación el cual realiza una gestión del tiempo, recursos y calidad del proyecto el cual produce una mayor productividad en menor tiempo con los mismos recursos y menos costos de ejecución de la obra | es_PE |
dc.description.abstract | This research aims to develop a management plan for the schedule, resources and quality of the construction Project of the Sausalito Alto Canal, Chao – Virú District, La Libertad. For which the implementation of the master plan, intermediate plan and weekly plan was carried out considering sectorization, performance by crews, personnel assignment per day; Thus, the resource supply plan by components and the quality management plan were also carried out considering control methods. The results obtained from the temporal analysis applying the Last Planner System, the execution of the work will be carried out in 33.33% less time than the traditional model and economically, a reduction in expenses by 26.53% will be obtained, having a better quality of the work. It is concluded that the application of the Last Planner System in the execution of the construction work increases the reability of the planning which manages the time, resources and quality of the Project which produces greater productivity in less time with the same resources and less costs of execution of the work | es_PE |
dc.description.uri | Tesis | es_PE |
dc.format | application/pdf | es_PE |
dc.language.iso | spa | es_PE |
dc.publisher | Universidad Privada Antenor Orrego | es_PE |
dc.relation.ispartofseries | T_CIVIL_2607 | |
dc.rights | info:eu-repo/semantics/openAccess | es_PE |
dc.rights.uri | https://creativecommons.org/licenses/by/4.0/ | es_PE |
dc.subject | Gestión | es_PE |
dc.subject | rendimiento | es_PE |
dc.subject | recursos | es_PE |
dc.title | Aplicación del Last Planner System en el proyecto de construcción del canal Sausalito Alto, Distrito de Chao, Virú, La Libertad | es_PE |
dc.type | info:eu-repo/semantics/bachelorThesis | es_PE |
thesis.degree.grantor | Universidad Privada Antenor Orrego. Facultad de Ingeniería | es_PE |
thesis.degree.name | Ingeniero Civil | es_PE |
thesis.degree.discipline | Ingeniería Civil | es_PE |
dc.subject.ocde | https://purl.org/pe-repo/ocde/ford#2.01.00 | es_PE |
renati.advisor.orcid | https://orcid.org/0000-0001-9168-8258 | es_PE |
renati.author.dni | 42501915 | |
renati.author.dni | 45111718 | |
renati.advisor.dni | 18112316 | |
renati.type | https://purl.org/pe-repo/renati/type#tesis | es_PE |
renati.level | https://purl.org/pe-repo/renati/level#tituloProfesional | es_PE |
renati.discipline | 732016 | es_PE |
renati.juror | Hurtado Zamora, Oswaldo | |
renati.juror | Medina Carbajal, Lucio Sigifredo | |
renati.juror | Farfán Córdova, Marlon Gastón | |
dc.publisher.country | PE | es_PE |
Ficheros en el ítem
Este ítem aparece en la(s) siguiente(s) colección(es)
-
Ingeniería Civil [1260]