dc.description.abstractEl sector de la construcción es uno de los menos desarrollados en Perú, en lo que al plano de la gestión se refiere y en paralelo, es uno de los sectores pilares para el desarrollo económico del país. En la actualidad, las medianas y pequeñas empresas predominan en el Perú, haciendo que la competitividad por la ejecución de las obras publicas y privada sea mayor. Pero, muchas de estas empresas muestran dificultades en su construcción debido a la falta de un sistema de gerencia de proyectos, siendo necesario implementar una herramienta que nos permita controlar los tiempos y costos de los proyectos durante su ejecución. El proyecto de alcantarillado seleccionado se ubica en el Sector II de la Ciudad de Chimbote, y se tendrá en consideración las siguientes áreas de conocimiento: Gestión del Alcance, Gestión del Tiempo y Gestión del Costo. Por lo tanto, este trabajo de investigación busca a través de los lineamientos del Project Management Institute (PMI), el poder implementar un sistema de gerencia de proyectos, con el objetivo de implementar esta forma de trabajo a quienes tienen a su cargo proyectos de saneamiento, para alcanzar los resultados y objetivos propuestos, cumpliendo con optimizar el rendimiento y productividad del mismo.spa
dc.description.abstractThe building sector is one of the less developed sectors in Peru, as far as the management plan is concemend, and in parallel, is one of the main support sectors for the country economic development. Actually, medium and small enterprises predominate in Peru,making competitiveness for the execution of public Works be greater, but many of these companies show difficulties in their construction because the lack of a Project management system being necessary to implement a tool that allow us control times and costs during its execution. The sewerage system Project is located in the sector II of the city of Chimbote and it will consider the following aras of knowledge: scope management, time management and cost management. For that reason, this research work seeks through the guidelines of the Project Management Institute (PMI) be able to implement a Project management system with the main objective of implementing this way of working to those who are responsibles of sanitation projects to reach the results and proposed objectives complying with optimize the performance and productivity of it.eng
dc.description.uriTesisspa
dc.formatapplication/pdfeng
dc.language.isospaspa
dc.publisherUniversidad Privada Antenor Orrego - UPAOspa
dc.relation.ispartofseriesM_INGE_090-
dc.rightsinfo:eu-repo/semantics/closedAccessspa
dc.sourceUniversidad Privada Antenor Orregospa
dc.sourceRepositorio Institucional - UPAOspa
dc.subjectProyectospa
dc.subjectAlcantarilladospa
dc.titleGestión del alcance, costos y tiempo en la ejecución de proyectos de alcantarillado en el sector II de Chimbote, región Ancash - 2018spa
dc.typeinfo:eu-repo/semantics/masterThesiseng
thesis.degree.levelMaestríaspa
thesis.degree.grantorUniversidad Privada Antenor Orrego. Escuela de Postgradospa
thesis.degree.nameMaestro en Gerencia de la Construcción Modernaspa
thesis.degree.disciplineGerencia de la Construcción Modernaspa
Aparece en las colecciones: Gerencia de la Construcción Moderna

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
REP_MAEST_INGE_MARCO.CERNA_GESTION.ALCANCE.COSTO_DATOS.pdfMARCO.CERNA_GESTION.ALCANCE.COSTO40,28 kBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.