Mostrar el registro sencillo del ítem
Efecto de la descolmatación del río Chicama aguas arriba del puente victoria en la socavación de sus pilares
dc.contributor.advisor | Narvaez Aranda, Ricardo Andrés | |
dc.contributor.author | Araujo Vazallo, Alexandra Patricia | |
dc.contributor.author | Perez Marin, Durbys Geraldine | |
dc.creator | Araujo Vazallo, Alexandra Patricia | |
dc.date.accessioned | 2019-03-26T15:49:04Z | |
dc.date.available | 2019-03-26T15:49:04Z | |
dc.date.issued | 2019 | |
dc.identifier.uri | https://hdl.handle.net/20.500.12759/4633 | |
dc.description.abstract | El presente trabajo de investigación presenta la obtención y comparación de la profundidad de socavación que se genera en los pilares del Puente Victoria según las siguientes variables: topografía, la granulometría y 03 tipos de caudal con diferentes períodos de retorno, 50, 100 y 500 años. Con estos datos se realizaron los modelos: unidimensional en el software Hec Ras y bidimensional en el software IBER. Se obtuvo la profundidad de socavación local y socavación general para ser sumadas y obtener la socavación total. La investigación demostró que la descolmatación aguas arriba del río, más la construcción de un dique provoca una nueva corriente de agua que va a afectar principalmente a los pilares del margen izquierdo. Teniendo 02 tipos de pilar, pila punta aguda y grupo de cilindros, los más afectados fueron los pilares circulares. Estos alcanzan una profundidad de socavación total en el modelo unidimensional de 3.79 m para un caudal de 1052.42 m3/s con período de retorno de 50 años; 4.07 m para un caudal de 1359.06 m3/s con período de retorno de 100 años; 5.48 m para un caudal de 2295 m3/s con período de retorno de 500 años. Mientras que, para el modelo bidimensional alcanzan una profundidad de socavación total de 5.62 m para un caudal de 1052.42 m3/s con período de retorno de 50 años; 6.40 m para un caudal de 1359.06 m3/s con período de retorno de 100 años; 6.72 m para un caudal de 2295 m3/s con período de retorno de 500 años. Se observó que el modelo bidimensional arroja profundidades de socavación más elevadas con respecto al modelo unidimensional, esto se debe a que el software IBER analiza el comportamiento del agua en 2 direcciones, siendo así un análisis más óptimo. | es_PE |
dc.description.abstract | This research work presents the obtaining and comparison of the depth of the society that is generated in the Victoria Bridge according to the following variables: topography, granulometry and 03 types of flows with different return periods, 50, 100 and 500 years. With these data, the models were published: one-dimensional in the Hec Ras software and twodimensional in the IBER software. The depth of the local scour and the general scour was obtained to be added up and obtain the total scour. The investigation showed that the decolonization upstream of the river, plus the construction of a dike causes a new water current that will affect mainly the pillars of the left margin. Having 02 types of pillar, sharp tip pile and group of cylinders. These reach a depth of total scour in the onedimensional kmodel of 3.79 m for a flow of 1052.42 m3 / s with a return period of 50 years; 4.07 m for a flow of 1359.06 m3 / s with a return period of 100 years; 5.48 m for a flow of 2295 m3 / s with a return period of 500 years. Meanwhile, for the two-dimensional model it will reach a total depth of 5.62 m for a flow of 1052.42 m3 / s with a return period of 50 years; 6.40 m for a flow of 1359.06 m3 / s with a return period of 100 years; 6.72 m for a flow of 2295 m3 / s with a return period of 500 years. It was observed that the two-dimensional model showed higher depths of scour with respect to the one-dimensional model, this is because of the IBER software analyzes the behavior of water in 2 directions, thus being a more optimal analysis. | en_US |
dc.description.uri | Tesis | es_PE |
dc.format | application/pdf | es_PE |
dc.language.iso | spa | es_PE |
dc.publisher | Universidad Privada Antenor Orrego | es_PE |
dc.relation.ispartofseries | T_ING.CIVIL_1688 | |
dc.rights | info:eu-repo/semantics/openAccess | es_PE |
dc.rights.uri | https://creativecommons.org/licenses/by/4.0/ | es_PE |
dc.source | Universidad Privada Antenor Orrego | es_PE |
dc.source | Repositorio Institucional - UPAO | es_PE |
dc.subject | Descolmatación | es_PE |
dc.subject | Aguas Arriba | es_PE |
dc.title | Efecto de la descolmatación del río Chicama aguas arriba del puente victoria en la socavación de sus pilares | es_PE |
dc.type | info:eu-repo/semantics/bachelorThesis | es_PE |
thesis.degree.level | Título Profesional | es_PE |
thesis.degree.grantor | Universidad Privada Antenor Orrego. Facultad de Ingeniería | es_PE |
thesis.degree.name | Ingeniero Civil | es_PE |
thesis.degree.discipline | Ingeniería Civil | es_PE |
dc.subject.ocde | https://purl.org/pe-repo/ocde/ford#2.01.00 | |
renati.type | https://purl.org/pe-repo/renati/type#tesis | |
renati.level | https://purl.org/pe-repo/renati/level#tituloProfesional | |
dc.publisher.country | PE | es_PE |
Ficheros en el ítem
Este ítem aparece en la(s) siguiente(s) colección(es)
-
Ingeniería Civil [1260]