dc.description.abstractEn las construcciones de Presas de Relaves mineros que se vienen desarrollando actualmente, tienden a construirse proyectos costosos de dimensiones variables en las que predominan el uso de elementos basados en agregados con alto uso en contenidos de aglomerantes para contrarrestar su elevado coste en su inversión; donde los riesgos de la ejecución del proyecto de construcción son elevados; por ello, realizar una adecuada identificación, análisis y el planteamiento de lineamientos de respuesta para el control de los riesgos. es de vital importancia comprender la probabilidad y el impacto de los riesgos si es que se ignora el nivel de severidad de estos en cada proyecto. Esta investigación presenta un listado de los riesgos más frecuentes como severos para los proyectos de construcción de presas de relaves mineros de manera tal, con el análisis, de planificación y respuesta usando estrategias de mitigación ante los eventos negativos que puedan causar, disminuirán significativamente los costes de los proyectos constructivos de presas de relaves mineros. Por lo tanto en este estudio se identificó 33 riesgos categorizados como altos por parte del análisis de expertos; teniendo como resultado después del análisis y aplicación en varias presas de relaves que se construyeron en el Perú, 7 riesgos que fueron avalados con severidad muy alta, donde es necesaria su consideración obligatoria al momento de seleccionar los riesgos ante una inversión en lo referido a los costes de los proyectos de construcción de presas de relaves. El presente estudio fue desarrollado en proyectos de presas de relaves de la Mina Condestable Mala, en la Provincia de Cañete, Departamento de Lima.es_PE
dc.description.abstractIn the construction of mining tailings dams that are currently being developed, expensive projects of variable dimensions tend to be built in which the use of elements based on aggregates with high binder content predominates to counteract their high investment cost; where the risks of the execution of the construction project are high; Therefore, carry out adequate identification, analysis and the formulation of response guidelines for risk control. It is vitally important to understand the probability and impact of risks if the level of severity of these in each project is ignored. This research presents a list of the most frequent and severe risks for mining tailings dam construction projects in such a way that, with the analysis, planning and response using mitigation strategies against the negative events that they may cause, costs will be significantly reduced. of mining tailings dam construction projects. Therefore, in this study, 33 risks categorized as high by expert analysis were identified; having as a result, after the analysis and application in several tailings dams that were built in Peru, 7 risks that were endorsed with very high severity, where their mandatory consideration is necessary when selecting the risks before an investment in relation to the costs of tailings dam construction projects. The present study was developed in tailings dam projects of the Condestable Mala Mine, in the Province of Cañete, Department of Limaes_PE
dc.description.uriTesises_PE
dc.formatapplication/pdfes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada Antenor Orregoes_PE
dc.relation.ispartofseriesT_CIVIL_2612
dc.rightsinfo:eu-repo/semantics/closedAccesses_PE
dc.rights.urihttps://creativecommons.org/licenses/by/4.0/es_PE
dc.subjectGestion de Riesgoses_PE
dc.subjectPMBOKes_PE
dc.titleAplicación Framework, Guía PMBOK, para fortalecer gestión de riesgos en presas de relaves, Mina Condestable Mala, Provincia Cañete. Limaes_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.grantorUniversidad Privada Antenor Orrego. Facultad de Ingenieriaes_PE
thesis.degree.nameIngeniero Civiles_PE
thesis.degree.disciplineIngenieria Civiles_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.01.00es_PE
renati.advisor.orcidhttps://orcid.org/0000-0003-0836-0062es_PE
renati.author.dni75165892
renati.advisor.dni18173778
renati.typehttps://purl.org/pe-repo/renati/type#tesises_PE
renati.levelhttps://purl.org/pe-repo/renati/level#tituloProfesionales_PE
renati.discipline732016es_PE
renati.jurorDurand Orellana, Rocío Del Pilar
renati.jurorGálvez Paredes, José Alcides
renati.jurorSánchez Malpica, Carmen Esperanza
dc.publisher.countryPEes_PE


Files in this item

Thumbnail
Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record

info:eu-repo/semantics/closedAccess
Except where otherwise noted, this item's license is described as info:eu-repo/semantics/closedAccess