Mostrar el registro sencillo del ítem

dc.contributor.advisorSagastegui Plasencia, Fidel Germán
dc.contributor.authorAlvarado Saucedo, Tomás Mauricio.
dc.contributor.authorQuiño Carrión, Gloria Estefany
dc.creatorAlvarado Saucedo, Tomás Mauricio.
dc.date.accessioned2024-11-27T17:00:11Z
dc.date.available2024-11-27T17:00:11Z
dc.date.issued2024
dc.identifier.urihttps://hdl.handle.net/20.500.12759/49952
dc.description.abstractEste trabajo de investigación titulada Implementación de la Carta Balance para incrementar la productividad H.U. Las Dunas I, distrito de Paiján, Ascope, La Libertad. Analiza, evalúa y mejora la productividad utilizando un estudio de caso y uso de la herramienta Last Planner en tareas relacionadas. Los indicadores de productividad presentados en este trabajo de investigación son: trabajo productivo, trabajo insumo y trabajo no insumo, los cuales se miden mediante instrumentos de balance. El objetivo es mejorar implementando un proceso basado en el método Last Scheduler. El primer capítulo plantea la cuestión y describe los objetivos generales y específicos, así como su justificación, metodología y limitaciones. Capítulo 2 Marco teórico. El Capítulo 3 explica el método utilizado en el estudio de caso y la recopilación de información relacionada con la recolección de datos durante la realización del trabajo utilizando el balance. El Capítulo 4 presenta los resultados de la implementación de las soluciones propuestas en el mismo capítulo. Identificar y eliminar restricciones también es un tema central de este capítulo. El último capítulo presenta las conclusiones y recomendaciones de este trabajo de investigación. Corresponde a los objetivos generales y tareas específicas de este documento, concluye con recomendaciones para mejorar la eficiencia del trabajo. Este estudio ha logrado los resultados esperados y se recomienda el uso de la Carta Balance, equilibra otros proyectos de construcción gracias a los logroses_PE
dc.description.abstractThis research work entitled Implementation of the Balance Chart to increase productivity H.U. Las Dunas I, district of Paiján, Ascope, La Libertad. It analyzes, evaluates and improves productivity using a case study and use of the Last Planner tool in related tasks. The productivity indicators presented in this research work are: productive work, input work and non-input work, which are measured by means of balance instruments. The objective is to improve by implementing a process based on the Last Scheduler method. The first chapter raises the question and describes the general and specific objectives, as well as its justification, methodology and limitations. Chapter 2 Theoretical Framework. Chapter 3 explains the method used in the case study and the collection of information related to data collection during the performance of the work using the balance sheet. Chapter 4 presents the results of the implementation of the solutions proposed in the same chapter. Identifying and removing constraints is also a central theme of this chapter. The last chapter presents the conclusions and recommendations of this research work. It corresponds to the general objectives and specific tasks of this paper, and concludes with recommendations to improve the efficiency of the work. This study has achieved the expected results and the use of the Balance Chart is recommended, it balances other construction projects thanks to the achievements.es_PE
dc.description.uriTesises_PE
dc.formatapplication/pdfes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada Antenor Orregoes_PE
dc.relation.ispartofseriesT_CIVIL_2638
dc.rightsinfo:eu-repo/semantics/closedAccesses_PE
dc.rights.urihttps://creativecommons.org/licenses/by/4.0/es_PE
dc.subjectProductividades_PE
dc.subjectGestiónes_PE
dc.titleImplementación de la Carta Balance para incrementar la productividad H.U. Las Dunas I, distrito de Paiján, Ascope, La Libertad.es_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.grantorUniversidad Privada Antenor Orrego. Facultad de Ingenieriaes_PE
thesis.degree.nameIngeniero Civiles_PE
thesis.degree.disciplineIngenieria Civiles_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.01.00es_PE
renati.advisor.orcidhttps://orcid.org/0000-0003-0836-0062es_PE
renati.author.dni72667011
renati.author.dni70009317
renati.advisor.dni18173778
renati.typehttps://purl.org/pe-repo/renati/type#tesises_PE
renati.levelhttps://purl.org/pe-repo/renati/level#tituloProfesionales_PE
renati.discipline732016es_PE
renati.jurorVargas López, Segundo Alfredo
renati.jurorRodríguez Ramos, Mamerto
renati.jurorPanduro Alvarado, Elka
dc.publisher.countryPEes_PE


Ficheros en el ítem

Thumbnail
Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(es)

Mostrar el registro sencillo del ítem

info:eu-repo/semantics/closedAccess
Excepto si se señala otra cosa, la licencia del ítem se describe como info:eu-repo/semantics/closedAccess