Mostrar el registro sencillo del ítem

dc.contributor.advisorNarváez Aranda, Ricardo Andrés
dc.contributor.authorAlbarrán Vila, Julio Fernando
dc.contributor.authorCalderón Portocarrero, Johann Rogelio
dc.creatorAlbarrán Vila, Julio Fernando
dc.date.accessioned2019-07-15T21:39:39Z
dc.date.available2019-07-15T21:39:39Z
dc.date.issued2019
dc.identifier.urihttps://hdl.handle.net/20.500.12759/5153
dc.description.abstractEn esta investigación se determinó que el embalse de la presa más adecuada fue la de 4.5m de altura, esto ante una avenida extraordinaria provocada por lluvias intensas. Primero se empezó realizando el estudio de suelos de la Laguna Sacamaca, apoyados en las pruebas realizadas en laboratorio se determinó que el material es una arena mal graduada con alto porcentaje de arcilla; luego se realizó el estudio hidrológico empleándose los datos de la estación hidrológica Lucma, cabe mencionar que los datos con los que se trabajaron fueron del año 2000 al 2018, después de procesar la información de precipitaciones se obtuvo, para un periodo de retorno de 100 años un caudal de 5.403 m3/s, el cual asumimos como caudal de diseño, después de ello se realizó el predimensionamiento de las presas, dando como resultado 1 presa de 3.5m de alto y otra de 4.5m de alto. Con las 2 presas mencionadas posteriormente se procedió a calcular el volumen total de embalse, siendo de 494.62 m3 para la presa de 3.5m de alto y de 810.35 m3 para la presa de 4.5m de alto, esto demuestra que la presa de 4.5m de altura almacena un 38.96% más que la presa de 3.5m de alto. Se realizó el cálculo de las dimensiones de un vertedero rectangular, tomando como caudal 5.403 m3/s que corresponde a un periodo de retorno de 100 años. Después de ello se procedió a realizar el análisis de estabilidad de Talud cuando la presa está llena y ante un desembalse rápido, tanto para la presa de 3.5m de alto como para la presa de 4.5m de alto. Finalmente se realizó la simulación de rotura de la presa de 4.5m de altura en el software IBER, se escogió esa presa y no la de 3.5m de altura, esto es debido a que presa de 4.5m de alto contiene más volumen de almacenamiento que ante la rotura de dicha presa generará una inundación mayor que la presa de 3.5m de altura. Se concluyó que ante la rotura de la presa de 4.5m de alto, la altura de agua que llegaría a la población sería de entre 0.70m a 0.90m.es_PE
dc.description.abstractThe main objective of this thesis is to model and simulate the depopulation of the Sacamaca lagoon, using a maximum avenue of 100 years of return and establishing the basis to propose and design a suitable earth dam to retain the constant overflows of the Sacamaca Lagoon. In this investigation it was determined that the reservoir of the most appropriate dam was 4.5m high, this before an extraordinary avenue caused by heavy rains. First, the soil study of Sacamaca Lagoon was started, supported by laboratory tests, it was determined that the material is poorly graded sand with a high percentage of clay; then the hydrological study was carried out using data from the Lucma hydrological station, it is worth mentioning that the data with which they worked were from the year 2000 to 2018, after processing the precipitation information was obtained, for a return period of 100 years a flow of 5,403 m3 / s, which we assumed as the design flow, after which the pre-dimensioning of the dams was carried out, resulting in a dam of 3.5m high and another of 4.5m high. With the 2 dams mentioned below, the total volume of the reservoir was calculated, being 494.62 m3 for the 3.5m high dam and 810.35 m3 for the 4.5m high dam, this shows that the dam of 4.5m height stores 38.96% more than the dam of 3.5m high. The calculation of the dimensions of a rectangular landfill was made, taking as a flow 5,403 m3 / s that corresponds to a return period of 100 years. After that, the stability analysis of slope was carried out when the dam is full and before a rapid disbanding, both for the 3.5m-high dam and the 4.5m-high dam. Finally, the simulation of breakage of the dam of 4.5m in height was performed in the IBER software, this dam was chosen and not the 3.5m in height, this is due to the fact that the 4.5m-high dam contains more storage volume than before the rupture of this dam, it will generate a flood greater than the dam of 3.5m in height. It was concluded that before the break of the dam of 4.5m high, the height of water that would reach the population would be between 0.70m to 0.90m.en_US
dc.description.uriTesises_PE
dc.formatapplication/pdfes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada Antenor Orrego - UPAOes_PE
dc.relation.ispartofseriesT_ING.CIVIL_1746
dc.rightsinfo:eu-repo/semantics/restrictedAccesses_PE
dc.sourceUniversidad Privada Antenor Orregoes_PE
dc.sourceRepositorio institucional - UPAOes_PE
dc.subjectDesembalse rápidoes_PE
dc.subjectSimulaciónes_PE
dc.titleModelamiento y simulación del desembalse de laguna sacamaca considerando presa de tierra como estructura de retención - lucma - gran chimú - la libertades_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.levelTítulo Profesionales_PE
thesis.degree.grantorUniversidad Privada Antenor Orrego. Facultad de Ingenieríaes_PE
thesis.degree.nameIngeniero Civiles_PE
thesis.degree.disciplineIngeniería Civiles_PE


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(es)

Mostrar el registro sencillo del ítem