dc.contributor.advisor | Müller Solón, José Antonio | |
dc.contributor.author | Corcuera Valderrama, Eduard Willian | |
dc.contributor.author | Loloy López, Marbin Noé | |
dc.creator | Corcuera Valderrama, Eduard Willian | |
dc.date.accessioned | 2019-07-18T21:39:40Z | |
dc.date.available | 2019-07-18T21:39:40Z | |
dc.date.issued | 2019 | |
dc.identifier.uri | https://hdl.handle.net/20.500.12759/5163 | |
dc.description.abstract | La Presente Investigación tiene como objetivo reducir los costos de inventarios
generados en los almacenes de la empresa carrocera Factoría Bruce S.A.,
aplicando el modelo de cantidad óptima de pedido basado en el Plan de
Requerimientos de Materiales.
El sistema de planeamiento de requerimiento de materiales, se fundamenta en
una adecuada planificación de todos los materiales, insumos y componentes que
se necesitan para la fabricación de un bus en la factoría Bruce; obteniéndose de
esta forma la cantidad óptima de pedido, de tal manera que se reduzca el número
de existencias en almacén y por ende el costo de inventario.
El estudio se inició identificando y clasificando los productos de acuerdo a la
demanda mediante la recopilación de información, a través del análisis
documental y aplicando técnicas como observación directa; esta clasificación se
realizó mediante el análisis ABC permitiendo seleccionar el producto THUNDER
URBANUSS 915, por presentar mayor demanda. Luego se realizó un análisis,
evaluación y selección del mejor modelo de pronóstico utilizando para ello los
errores estadísticos: MAD, ESM y MAPE, con el fin de proyectar la demanda del
año 2019; de tal manera que con el plan maestro de producción, la lista de
materiales y registro de inventarios; se diseñó el sistema de planeamiento de
requerimiento de materiales para todo el año; el cual permitió determinar el
periodo y la cantidad netamente necesaria de materiales para los lotes de
producción evitando el acumulamiento de existencias en el almacén y así reducir
sus costos incurridos en ello. Finalmente se determinó la cantidad de pedido
óptima de materiales, logrando reducir los costos totales de inventario de S/.
640,356.6 a S/. 545,319.1, obteniendo un ahorro de S/. 95,037.5, que equivale
al 14.8 % con respecto al año anterior, lo cual justifica la propuesta del Plan de
Requerimiento de Materiales. | es_PE |
dc.description.abstract | The present research aims to reduce the costs of inventories generated in the
warehouses of the bodywork company Factoría Bruce S.A., applying the model
of optimal quantity of order based on the Plan of Material Requirements.
The material requirements planning system is based on an adequate planning of
all the materials, supplies and components that are needed for the manufacture
of a bus at the Bruce factory; obtaining in this way the optimal quantity of order,
in such a way that the number of stocks in storage and therefore the cost of
inventory is reduced.
The study began by identifying and classifying the products according to the
demand through the collection of information, through documentary analysis and
applying techniques such as direct observation; This classification was made
through the ABC analysis allowing the selection of the THUNDER URBANUSS
915 product, due to its higher demand. Then, an analysis, evaluation and
selection of the best forecasting model was made using statistical errors: MAD,
ESM and MAPE, in order to project the demand for the year 2019; in such a way
that with the master plan of production, the list of materials and inventory registry;
the material requirement planning system was designed for the entire year; which
allowed to determine the period and the quantity of materials necessary for the
production batches, avoiding the accumulation of stock in the warehouse and
thus reducing the costs incurred in it. Finally, the optimal order quantity of
materials was determined, reducing total inventory costs of S /. 640,356.6 to S /.
545,319.1, obtaining savings of S /. 95,037.5, which is equivalent to 14.8% with
respect to the previous year, which justifies the proposal of the Materials
Requirement Plan. | en_US |
dc.description.uri | Tesis | es_PE |
dc.format | application/pdf | |
dc.language.iso | spa | es_PE |
dc.publisher | Universidad Privada Antenor Orrego | es_PE |
dc.relation.ispartofseries | T_ING.IND_080 | |
dc.rights | info:eu-repo/semantics/openAccess | es_PE |
dc.source | Universidad Privada Antenor Orrego | es_PE |
dc.source | Repositorio Institucional - UPAO | es_PE |
dc.subject | Sistema MRP | es_PE |
dc.subject | Plan maestro de producción | es_PE |
dc.title | Aplicación de un modelo de inventarios basado en el planeamiento de requerimiento de materiales para disminuir los costos del sistema de inventarios en la Factoría Bruce S.A. | es_PE |
dc.type | info:eu-repo/semantics/bachelorThesis | es_PE |
thesis.degree.level | Título Profesional | es_PE |
thesis.degree.grantor | Universidad Privada Antenor Orrego. Facultad de Ingeniería | es_PE |
thesis.degree.name | Ingeniero Industrial | es_PE |
thesis.degree.discipline | Ingeniería Industrial | es_PE |