Mostrar el registro sencillo del ítem
Modelo de gestión de riesgos utilizando la guía del pmbok-2021 para proyectos de construcción civil. Trujillo 2024.
dc.contributor.advisor | Chuquilín Delgado, María Florencia | |
dc.contributor.author | Rodríguez Arias, Wilder Marcial | |
dc.contributor.author | Sánchez Ventura, Sarita Leydi | |
dc.creator | Rodríguez Arias, Wilder Marcial | |
dc.date.accessioned | 2024-12-10T16:41:11Z | |
dc.date.available | 2024-12-10T16:41:11Z | |
dc.date.issued | 2024 | |
dc.identifier.uri | https://hdl.handle.net/20.500.12759/52172 | |
dc.description.abstract | El presente trabajo de investigación, tiene por objetivo principal proponer un modelo de gestión de riesgos utilizando la guía del Pmbok-2021 para proyectos de construcción civil. Se obtuvo como resultados que respecto al análisis probabilístico, se puede afirmar que relación a la duración del proyecto, con una certeza del 95%, se puede aseverar que la máxima duración total del proyecto será de 332.33 días y la mínima será 250.73 días; con una desviación estándar de 16.80 y con un coeficiente de desviación de 0.055; así mismo, se tiene un impacto en la duración del proyecto de 62.1% para la especialidad de arquitectura de proyecto y 17.6% para la especialidad de estructuras del proyecto. Se concluye que, respecto al costo del proyecto, se puede afirmar con una certeza del 95%, se estima gastar un total de S/. 4121326.94, dicho monto es superior en un 17% respecto al monto esperado de S/ 3,509,225.26; también para esta simulación se obtuvo como desviación estándar S/. 257215.89 y un coeficiente de variación de 0.069, lo cual indica que el cálculo es bastante certero; así mismo respecto al impacto que se tiene en el costo del proyecto, las especialidades de estructuras y la de arquitectura, son las más determinantes, contribuyendo em un 50.5% y em un 39.9% respectivamente. | es_PE |
dc.description.abstract | The main objective of this research work is to propose a risk management model using the Pmbok-2021 guide for civil construction projects. The results were obtained that regarding the probabilistic analysis, it can be stated that in relation to the duration of the project, with a certainty of 95%, it can be stated that the maximum total duration of the project will be 332.33 days and the minimum will be 250.73 days; with a standard deviation of 16.80 and a deviation coefficient of 0.055; Likewise, there is an impact on the duration of the project of 62.1% for the project architecture specialty and 17.6% for the project structures specialty. It is concluded that, regarding the cost of the project, it can be stated with a certainty of 95%, it is estimated to spend a total of S/. 4121326.94, this amount is 17% higher than the expected amount of S/ 3,509,225.26; Also for this simulation, the standard deviation is S/. 257215.89 and a coefficient of variation of 0.069, which indicates that the calculation is quite accurate; Likewise, regarding the impact on the cost of the project, the specialties of structures and architecture are the most determining, contributing 50.5% and 39.9% respectively. | es_PE |
dc.description.uri | Tesis | es_PE |
dc.format | application/pdf | es_PE |
dc.language.iso | spa | es_PE |
dc.publisher | Universidad Privada Antenor Orrego | es_PE |
dc.relation.ispartofseries | T_CIVIL_2655 | |
dc.rights | info:eu-repo/semantics/openAccess | es_PE |
dc.rights.uri | https://creativecommons.org/licenses/by/4.0/ | es_PE |
dc.subject | Riesgo | es_PE |
dc.subject | Probabilidad | es_PE |
dc.title | Modelo de gestión de riesgos utilizando la guía del pmbok-2021 para proyectos de construcción civil. Trujillo 2024. | es_PE |
dc.type | info:eu-repo/semantics/bachelorThesis | es_PE |
thesis.degree.grantor | Universidad Privada Antenor Orrego. Facultad de Ingenieria | es_PE |
thesis.degree.name | Ingeniero Civil | es_PE |
thesis.degree.discipline | Ingenieria Civil | es_PE |
dc.subject.ocde | https://purl.org/pe-repo/ocde/ford#2.01.00 | es_PE |
renati.advisor.orcid | https://orcid.org/0000-0003-1558-6369 | es_PE |
renati.author.dni | 43608670 | |
renati.author.dni | 47008529 | |
renati.advisor.dni | 42317343 | |
renati.type | https://purl.org/pe-repo/renati/type#tesis | es_PE |
renati.level | https://purl.org/pe-repo/renati/level#tituloProfesional | es_PE |
renati.discipline | 732016 | es_PE |
renati.juror | Medina Carbajal, Lucio Sigifredo | |
renati.juror | López Carranza, Atilio Ruben | |
renati.juror | Merino Martínez, Marcelo Edmundo | |
dc.publisher.country | PE | es_PE |
Ficheros en el ítem
Este ítem aparece en la(s) siguiente(s) colección(es)
-
Ingeniería Civil [1302]