Show simple item record

dc.contributor.advisorLeon Panta, Cristhian Alexander
dc.contributor.authorCórdova Maraví, Jorge Pablo
dc.creatorCórdova Maraví, Jorge Pablo
dc.date.accessioned2019-09-13T13:32:08Z
dc.date.available2019-09-13T13:32:08Z
dc.date.issued2019
dc.identifier.urihttps://hdl.handle.net/20.500.12759/5407
dc.description.abstractEl presente estudio se ha realizado con el propósito de analizar la productividad aplicando la filosofía Lean Construction en el rendimiento de la partida reforzamiento de suelos de la Planta de Tratamiento de Aguas Residuales San Martín - Piura. El problema formulado para la investigación fue: ¿De qué manera el análisis de productividad aplicando la filosofía Lean Construction influye en el rendimiento de la partida de reforzamiento de suelos de la Planta de Tratamiento de Aguas Residuales San Martín - Piura? Y se tuvo como hipótesis: El análisis de productividad aplicando Filosofía Lean Construction influye de manera positiva en el rendimiento en la partida reforzamiento de suelos de la planta de tratamiento de aguas residuales San Martín - Piura. Como objetivos específicos se planteó: Identificar los principales factores que afectan la productividad en la partida reforzamiento de suelos, plantear herramientas y técnicas de la filosofía Lean Construction que contribuyan a la planificación, seguimiento y control en la partida reforzamiento de suelos, desarrollar herramientas y técnicas de productividad, mostrando su fácil entendimiento y correcto uso, aplicando la filosofía Lean Construction en la partida reforzamiento de suelos de la Planta de Tratamiento de Aguas Residuales San Martín - Piura. La población estuvo conformada por el proyecto: Ampliación y mejoramiento de la Planta de Tratamiento de Aguas Residuales San Martin – Piura. La muestra para dicha investigación fue la partida reforzamiento de suelos. El diseño de la investigación utilizado fue Descriptivo – Explicativo. En cuanto a las técnicas e instrumentos de recolección de datos se utilizó tanto observación directa, así como el análisis documental en fichas de recolección de protocolos. Llegando a la conclusión de mejora del rendimiento en un 29% de trabajo productivo, 4% en trabajos contributorios y una disminución de trabajos no productivos de 32%, el porcentaje de cumplimiento de la partida reforzamiento de suelos mejoró de 60.05% en las 3 primeras semanas de análisis a 85.96% en las últimas 3 semanas de implementación.es_PE
dc.description.abstractThe present study has been carried out for the purpose of analyzing the productivity by applying the Lean Construction philosophy in the performance of the soil reinforcement heading of the San Martín - Piura Wastewater Treatment Plant. The problem formulated for the investigation was: How does the productivity analysis applying the Lean Construction philosophy influence the performance of the soil reinforcement heading of the San Martín - Piura Wastewater Treatment Plant? And it was hypothesized: The productivity analysis applying Lean Construction Philosophy positively influences the performance in the soil reinforcement heading of the San Martín - Piura wastewater treatment plant. Specific objectives were: Identify the main factors that affect productivity in the heading of soil reinforcement, propose tools and techniques of the Lean Construction philosophy that contribute to planning, monitoring and control in the heading of soil reinforcement, develop tools and techniques of productivity, showing its easy understanding and correct use, applying the Lean Construction philosophy in the heading of soil reinforcement of the San Martín - Piura Wastewater Treatment Plant. The population was conformed by the project: Expansion and improvement of the Wastewater Treatment Plant San Martin - Piura. The sample for this investigation was the heading of soil reinforcement. The design of the research used was Descriptive - Explanatory. Regarding the data collection techniques and instruments, direct observation was used, as well as the documentary analysis in protocols collection sheets. Reaching the conclusion of performance improvement in 29% of productive work, 4% in contributory works and a decrease in non-productive works of 32%, the percentage of compliance with the heading of soil reinforcement improved by 60.05% in the first 3 Weeks of analysis at 85.96% on the tools, 3 weeks of implementation.en_US
dc.description.uriTesises_PE
dc.formatapplication/pdfes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada Antenor Orregoes_PE
dc.relation.ispartofseriesT_ING.CIVIL_1763
dc.rightsinfo:eu-repo/semantics/closedAccesses_PE
dc.rights.urihttps://creativecommons.org/licenses/by/4.0/es_PE
dc.sourceUniversidad Privada Antenor Orregoes_PE
dc.sourceRepositorio Institucional - UPAOes_PE
dc.subjectAnálisis de productividades_PE
dc.subjectLean Constructiones_PE
dc.titleAnálisis de productividad aplicando la filosofía Lean Construction en la partida reforzamiento de suelos de la planta de tratamiento de aguas residuales San Martín - Piuraes_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.levelTítulo Profesionales_PE
thesis.degree.grantorUniversidad Privada Antenor Orrego. Facultad de Ingenieríaes_PE
thesis.degree.nameIngeniero Civiles_PE
thesis.degree.disciplineIngeniería Civiles_PE
dc.publisher.countryPEes_PE


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record

info:eu-repo/semantics/closedAccess
Except where otherwise noted, this item's license is described as info:eu-repo/semantics/closedAccess