dc.description.abstract | En la actualidad la ciudad de Puerto Malabrigo del distrito de Razuri en la provincia Ascope
del departamento La Libertad, sufre de un fuerte desabastecimiento de agua potable, la
dotación se realiza en promedio tres días a la semana, con un periodo de duración de 1 a 3
horas por día de servicio. Así mismo la fuente de captación que se tiene es un sistema de
bombeo con una producción de caudal menor al requerido. La presente tesis surge de la
necesidad de dar solución al desabastecimiento de agua potable que sufre la ciudad por más
de 30 años, como parte de la contribución social que debe hacer la Universidad Privada
Antenor Orrego (UPAO). Ofrezco mi proyecto a la ciudad para así hacer un pequeño aporte
(alternativa de solución) al problema emblemático de la ciudad que es el agua potable. La
finalidad de la tesis, es que dicha localidad pueda ser abastecida las 24 horas del día con
agua potable, para ello propongo un diseño de línea de succión e impulsión nuevo. La tesis
garantiza que el agua, de la captación subterránea llegue con una presión dinámica favorable.
Por lo tanto, en la presente investigación se logró evaluar y simular dinámicamente el sistema
de captación de aguas subterráneas por bombeo de la localidad Puerto Malabrigo,
determinando el caudal de bombeo de aguas subterráneas, diámetro de tubería de línea de
succión e impulsión, cantidad de horas de bombeo al día, altura dinámica total y potencia de
la bomba requerida. Para ello se determinó el periodo de diseño, la población de diseño,
dotación por habitante y se halló el caudal promedio. Con el caudal promedio se procedió al
cálculo del caudal máximo diario, horario y bombeo, con estos datos se realizó el cálculo del
diámetro de la tubería para la línea de succión e impulsión, se hizo un cálculo para determinar
la pérdida de carga hidráulica, y altura dinámica total. Con estos datos se calculó la potencia
mínima de la bomba requerida para cumplir la función del bombeo de las aguas subterráneas. | es_PE |
dc.description.abstract | Currently the city of Puerto Malabrigo in the district of Razuri in the province Ascope of the
department La Libertad, suffers from a severe shortage of drinking water, the endowment is
made on average three days a week, with a period of duration of 1 to 3 hours per day of
service. Likewise, the source of collection is a pumping system with a production of less
than the required flow. This thesis arises from the need to provide a solution to the shortage
of drinking water that the city suffers for more than 30 years, as part of the social contribution
to be made by the Universidad Privada Antenor Orrego (UPAO). I offer my project to the
city to make a small contribution (alternative solution) to the emblematic problem of the city
that is drinking water. The purpose of the thesis is that this town can be supplied 24 hours a
day with drinking water, for this I propose a design of suction line and new drive. The thesis
guarantees that the water from the underground catchment arrives with a favourable dynamic
pressure.
Therefore, in the present investigation it was possible to evaluate and dynamically simulate
the groundwater collection system by pumping in the town of Puerto Malabrigo, determining
the groundwater pumping flow, diameter of the suction and impulsion line pipe, number of
pumping hours per day, total dynamic height and power of the required pump. For this
purpose, the design period, the design population, staff per inhabitant and the average flow
rate were determined. With the average flow we proceeded to calculate the daily maximum
flow, hourly and pumping, with these data we calculated the diameter of the pipeline for the
suction and impulsion line, a calculation was made to determine the loss of hydraulic load,
and total dynamic height. With these data, the minimum power of the pump required to
perform the function of pumping groundwater was calculated. | en_US |
dc.description.uri | Tesis | es_PE |
dc.format | application/pdf | es_PE |
dc.language.iso | spa | es_PE |
dc.publisher | Universidad Privada Antenor Orrego | es_PE |
dc.relation.ispartofseries | T_ING.CIVIL_1773 | |
dc.rights | info:eu-repo/semantics/closedAccess | es_PE |
dc.rights.uri | https://creativecommons.org/licenses/by/4.0/ | es_PE |
dc.source | Universidad Privada Antenor Orrego | es_PE |
dc.source | Repositorio Institucional - UPAO | es_PE |
dc.subject | Simulación | es_PE |
dc.subject | Bombeo | es_PE |
dc.title | Evaluación y simulación dinámica del sistema de captación de aguas subterráneas por bombeo, en la ciudad de Puerto Malabrigo, distrito Razuri, provincia Ascope | es_PE |
dc.type | info:eu-repo/semantics/bachelorThesis | es_PE |
thesis.degree.level | Título Profesional | es_PE |
thesis.degree.grantor | Universidad Privada Antenor Orrego. Facultad de Ingeniería | es_PE |
thesis.degree.name | Ingeniero Civil | es_PE |
thesis.degree.discipline | Ingeniería Civil | es_PE |
dc.subject.ocde | https://purl.org/pe-repo/ocde/ford#2.01.00 | |
renati.type | https://purl.org/pe-repo/renati/type#tesis | |
renati.level | https://purl.org/pe-repo/renati/level#tituloProfesional | |
dc.publisher.country | PE | es_PE |