dc.description.abstract | El desarrollo de esta tesis está enfocada principalmente en la elaboración
de una propuesta de planeación de la Gestión del cronograma y costos con
el uso del PMBOK sexta edición, para la construcción de una obra de
saneamiento básico con biodigestores, proyecto de saneamiento localizado
en la provincia de San Miguel del departamento de Cajamarca. El proyecto
consiste en la construcción de 831 unidades básico de saneamiento (letrina
con arrastre hidráulico con biodigestor para el tratamiento de excretas). En
la parte primera se basa en describir el problema real, donde podemos
precisar que no contamos con herramientas que ayuden a llevar un control
de la ejecución del Proyecto desde el inicio hasta el final. Se justifica pues
mediante este estudio se va a desarrollar un plan de gestión tomando como
base los conocimientos PMBOK, basados principalmente en dos
conocimientos (cronograma y costo), se buscará hacer comparaciones con
el método del valor ganado, realización de un cronograma mediante el
Microsoft Project, esta propuesta servirá para obras similares, para que así
puedan tener un mejor control en la dirección de proyectos basado en el
cronograma y costos. Se tiene el Objetivo principal y secundarios que se
basa principalmente en desarrollar un plan de gestión del cronograma y
costos en la ejecución de la obra de saneamiento con biodigestores de la
zona rural de la Provincia de San Miguel. El marco teórico está
desarrollado a través de los conocimientos del PMBOK. Por último, la
metodología a usar será mediante el levantamiento de información en las
10 localidades donde se ejecutó la obra y análisis documental
Bibliográfico sobre Project Management Institute (PMBOK). Finalmente,
el proyecto nos conduce a una optimización del trabajo, sin afectar la
rentabilidad del proyecto el tiempo de ejecución la obra, cumpliendo con
los requisitos de buena Gestión de Proyectos. | es_PE |
dc.description.abstract | The development of this thesis is mainly focused on the elaboration of a planning
proposal for the management of the schedule and costs with the use of the sixth edition
PMBOK, for the construction of a basic sanitation work with biodigesters, a sanitation
project located in the province from San Miguel of the department of Cajamarca. The
project involves the construction of 831 basic sanitation units (latrine with hydraulic
drag with biodigester for excreta treatment). In the first part it is based on describing
the real problem, where we can specify that we do not have tools that help to keep
track of the execution of the Project from the beginning to the end. It is justified
because through this study a management plan will be developed based on PMBOK
knowledge, based mainly on two knowledge (schedule and cost), it will seek to make
comparisons with the method of earned value, making a schedule through Microsoft
Project, this proposal will serve for similar works, so that they can have better control
in the direction of projects based on the schedule and costs. The main and secondary
Objective is based, which is mainly based on developing a schedule of management of
the schedule and costs in the execution of the sanitation work with biodigesters in the
rural area of the Province of San Miguel. The theoretical framework is developed
through the knowledge of PMBOK. Finally, the methodology to be used will be
through the collection of information in the 10 locations where the work was carried
out and Bibliographic documentary analysis on Project Management Institute
(PMBOK). Finally, the project leads us to an optimization of the work, without
affecting the profitability of the project the execution time of the work, complying
with the requirements of good Project Management. | en_US |
dc.description.uri | Tesis | es_PE |
dc.format | application/pdf | es_PE |
dc.language.iso | spa | es_PE |
dc.publisher | Universidad Privada Antenor Orrego | es_PE |
dc.relation.ispartofseries | T_INGE_123 | |
dc.rights | info:eu-repo/semantics/closedAccess | es_PE |
dc.rights.uri | https://creativecommons.org/licenses/by/4.0/ | es_PE |
dc.source | Universidad Privada Antenor Orrego | es_PE |
dc.source | Repositorio Institucional - UPAO | es_PE |
dc.subject | Cronograma y costo de saneamiento | es_PE |
dc.subject | Biodigestores | es_PE |
dc.title | Desarrollo del cronograma y costo del saneamiento en la zona rural con biodigestores en diez localidades de la provincia de San Miguel - Cajamarca | es_PE |
dc.type | info:eu-repo/semantics/masterThesis | es_PE |
thesis.degree.level | Maestría | es_PE |
thesis.degree.grantor | Universidad Privada Antenor Orrego. Escuela de Postgrado | es_PE |
thesis.degree.name | Maestro en Gerencia en la Construcción Moderna | es_PE |
thesis.degree.discipline | Maestría en Gerencia de la Construcción Moderna | es_PE |
dc.subject.ocde | https://purl.org/pe-repo/ocde/ford#2.01.03 | es_PE |
renati.author.dni | 47057165 | |
renati.type | https://purl.org/pe-repo/renati/type#tesis | es_PE |
renati.level | https://purl.org/pe-repo/renati/level#maestro | es_PE |
renati.discipline | 732207 | es_PE |
dc.publisher.country | PE | es_PE |