dc.description.abstract | La propuesta de implementación TPM para incrementar la eficiencia total de
equipos en el área de mantenimiento de espárragos de la empresa agroindustrial
Virú S.A., de los 19 tractores que tiene la empresa en espárrago campo, se
determinó 12 con mayor criticidad. Se logró realizar el diagnóstico para los meses
de ene-dic del 2019 concluyéndose que el promedio la eficiencia total (OEE) de los
tractores de campo espárrago fue de 79.31% en el 2019. Se diseñó y aplicó TQM
en el Subsistema Motor, el CMA fue de 42% de las 12 tareas programadas y para
el CMP fue de 76% del total de 46 mantenimientos programados para el año 2019
y el incremento para el 2020 es de 24%. En el Subsistema Hidráulico, el CMA fue
56% de las 9 tareas programadas y para el CMP fue 85% del total de 37
mantenimientos programados para el año 2019 y el incremento para el 2020 es de
15%. En el Subsistema Eléctrico, el CMA fue 50% de las 4 tareas programadas y
para el CMP fue de 79% del total de 14 mantenimientos programados para el año
2019 y el incremento para el 2020 es 21%. En el Reemplazo de Elementos, el CMA
fue 53% de las 15 tareas programadas y para el CMP fue de 79% del total de 31
mantenimientos programados para el año 2019 y el incremento para el 2020 es
21% debido a la implementación del TQM. Se concluyó que en el 2019 el Tiempo
de paradas por fallas promedio fue de 281 horas y en el 2020 se calculó 223 horas
siendo la reducción de 58 horas promedio por tractor. En el 2019 el Tiempo de
producción real promedio fue de 3919 horas y se aumenta a 3977 horas para el
2020 siendo el incremento de 58 horas de producción real promedio por tractor. En
el 2019 el tiempo medio de reparación de fallas fue de 8.6 horas y para el 2020 se
determinó en 9.8 horas y se justifica porque se reducen los mantenimientos de
imprevistos aumentando los mantenimientos preventivos. El número de fallas de
los tractores de mayor criticidad en el 2019 fue de 392 fallas y en el 2020 se calculó
274 fallas con una reducción de 118 fallas. Se concluye que se proyecta una
eficiencia OEE de 86.37% para el 2020 con un incremento promedio de 7.06%
debido a la propuesta de implementar TPM en los tractores utilizados en campo
espárrago de la empresa agroindustrial Virú S.A | es_PE |
dc.description.abstract | The TPM implementation proposal to increase the total efficiency of equipment in
the asparagus maintenance area of agro-industrial company Virú S.A., of the
company's 19 tractors in asparagus field, was determined 12 with greater criticality.
Diagnosis was made for the 2019 Jan-Dec months, concluded that the average total
efficiency (OEE) of asparagus field tractors was 79.31% in 2019. was designed and
applied in the Motor Subsystem, the CMA was 42% of the 12 scheduled tasks and
for the CMP it was 76% of the total of 46 maintenance scheduled for 2019 and the
increase for 2020 is 24%. In the Hydraulic Subsystem, the CMA was 56% of the 9
scheduled tasks and for the CMP it was 85% of the total of 37 maintenance
scheduled for 2019 and the increase by 2020 is 15%. In the Electrical Subsystem,
the CMA was 50% of the 4 scheduled tasks and for the CMP it was 79% of the total
of 14 maintenance scheduled for 2019 and the increase for 2020 is 21%. In Element
Replacement, the CMA was 53% of the 15 scheduled tasks and for the CMP it was
79% of the total of 31 maintenance scheduled for 2019 and the increase by 2020 is
21% due to the implementation of the TQM. was concluded that in 2019 the average
downtime was 281 hours and by 2020 223 hours was calculated being the reduction
of 58 hours per tractor average. In 2019 the average actual production time was
3919 hours and is increased to 3977 hours by 2020 being the increase of 58 hours
of average actual production per tractor. In 2019 the average fault repair time was
8.6 hours and by 2020 it was determined in 9.8 hours and justified because
unforeseen maintenance is reduced by increasing preventive maintenance. The
number of most critical tractor failures in 2019 was 392 failures and in 2020 274
failures were calculated with a reduction of 118 failures. It is concluded that an OEE
efficiency of 86.37% is projected by 2020 with an average increase of 7.06% due to
the proposal to implement TPM in the tractors used in the asparagus field of the
agro-industrial company Virú S.A. | en_US |
dc.description.uri | Tesis | es_PE |
dc.format | application/pdf | es_PE |
dc.language.iso | spa | es_PE |
dc.publisher | Universidad Privada Antenor Orrego | es_PE |
dc.relation.ispartofseries | T_IND_155 | |
dc.rights | info:eu-repo/semantics/openAccess | es_PE |
dc.rights.uri | https://creativecommons.org/licenses/by/4.0/ | es_PE |
dc.source | Universidad Privada Antenor Orrego | es_PE |
dc.source | Repositorio Institucional - UPAO | es_PE |
dc.subject | Eficiencia Total de Equipos | es_PE |
dc.subject | Mantenimiento de Maquinas Pesadas | es_PE |
dc.title | Propuesta de implementación TPM para incrementar la eficiencia total de equipos en el área de Mantenimiento de la Empresa Agroindustrial Virú S.A | es_PE |
dc.type | info:eu-repo/semantics/bachelorThesis | es_PE |
thesis.degree.level | Título Profesional | es_PE |
thesis.degree.grantor | Universidad Privada Antenor Orrego. Facultad de Ingeniería | es_PE |
thesis.degree.name | Ingeniero Industrial | es_PE |
thesis.degree.discipline | Ingeniería Industrial | es_PE |
dc.subject.ocde | https://purl.org/pe-repo/ocde/ford#2.11.04 | es_PE |
renati.advisor.orcid | https://orcid.org/0000-0001-8286-0597 | es_PE |
renati.author.dni | 45336224 | |
renati.advisor.dni | 18208167 | |
renati.type | https://purl.org/pe-repo/renati/type#tesis | es_PE |
renati.level | https://purl.org/pe-repo/renati/level#tituloProfesional | es_PE |
renati.discipline | 722026 | es_PE |
renati.juror | Landeras Pilco, María Isabel | |
renati.juror | De la Rosa Anhuaman, Filiberto | |
renati.juror | Granados Porturas, Pablo | |
dc.publisher.country | PE | es_PE |