dc.contributor.advisor | Terrones Romero, Julio Milton | |
dc.contributor.author | Aguirre Cieza, Gelder Alddir | |
dc.creator | Aguirre Cieza, Gelder Alddir | |
dc.date.accessioned | 2022-10-07T17:21:28Z | |
dc.date.available | 2022-10-07T17:21:28Z | |
dc.date.issued | 2022 | |
dc.identifier.uri | https://hdl.handle.net/20.500.12759/9571 | |
dc.description.abstract | La empresa Calzados Linda S.R.L, Es una empresa dedicada a comercializar y fabricar
calzados femeninos, en relación con esta empresa se realizó la investigación. Cuando
se programó la visita a la fábrica se pudo reunir información de tal manera que sé pudo
comprender como laboran y como realizan la manufactura de los calzados que ofrecen,
concluyendo así que dicha empresa viene laborando desorganizado, no hay control en
los procesos y un total variado volumen de producción. Ya identificado el problema a
través del diagrama causa efecto, se determinó que la primera causa raíz del problema
que fue los tiempos de producción no estandarizados, como consecuencia la posible
solución sería la estandarización de los tiempos, la cual se realizó tomando en cuenta
las 4 actividades centralizadas que comprende el proceso productivo: Cortado, Perfilado,
Armado y Cortado. Una vez identificadas las actividades se tomó una muestra piloto de
20 observaciones y mediante la distribución T de student se determinó el tamaño de
muestra para iniciar el estudio. Luego, se procedió a calcular los tiempos elementales
promedio en cada una de las actividades con el método de regreso a cero utilizando el
cronómetro. Seguidamente, se calificó a los trabajadores mediante el sistema
Westinghouse para proceder a calcular el tiempo normal. A esto sé agrego los
suplementos y valorización porcentual el cual fue dado según criterio del comité de
calificación conformado en la empresa, que tuvo como resultado de 3%. Finalmente, se
calculó el tiempo estándar y el volumen o capacidad de producción tanto teórica como
efectiva. El resultado final se concentra en haber determinado la actividad cuello de
botella denominada perfilado, siendo esta la actividad que gobierna la línea de
producción con un tiempo estándar de 116.63 minutos/docena, esto nos permitió calcular
el volumen de producción efectiva equivalente a 23 docenas/semana de calzado
femenino. | es_PE |
dc.description.abstract | The company Cute Shoes S.R.L, it is a company dedicated to market and manufacture
women's footwear, in relation to this company the research was carried out. When the
visit to the factory was scheduled, it was possible to gather information in such a way that
I know I could understand how they work and how they manufacture the footwear they
offer, thus concluding that this company has been working disorganized, there is no
control in the processes and a total ignorance of its production volume. Once the problem
was identified through the cause-and-effect diagram, it was determined that the first root
cause of the problem was the non-standardized production times, as a consequence the
possible solution would be the standardization of the times, which was carried out taking
into account the 4 activities that comprise the production process: Cutting, Profiling,
Assembly and Cutting. Once the activities were identified, a pilot sample of 20
observations was taken and through the student's T distribution, the sample size was
determined to start the study. Then, we proceeded to calculate the average elementary
times in each of the activities with the return to zero method using the stopwatch. The
workers were then qualified using the Westinghouse system to calculate normal time. To
this I add the supplements and percentage valuation which was given according to the
criteria of the formed committee of the company, which had as a result of 3%. Finally, the
standard time and the volume or capacity of both theoretical and effective production were
calculated. The final result is concentrated on having determined the bottleneck activity
called profiling, this being the activity that governs the production line with a standard time
of 116.63 minutes / dozen, this allowed us to calculate the effective production volume
equivalent to 23 dozen / week of women's footwear | en_US |
dc.description.uri | Tesis | es_PE |
dc.format | application/pdf | es_PE |
dc.language.iso | spa | es_PE |
dc.publisher | Universidad Privada Antenor Orrego | es_PE |
dc.relation.ispartofseries | T_IND_207 | |
dc.rights | info:eu-repo/semantics/openAccess | es_PE |
dc.rights.uri | https://creativecommons.org/licenses/by/4.0/ | es_PE |
dc.source | Universidad Privada Antenor Orrego | es_PE |
dc.source | Repositorio Institucional - UPAO | es_PE |
dc.subject | Estandarización de los Tiempos | es_PE |
dc.subject | Volumen de Producción | es_PE |
dc.title | Estandarización de los tiempos para calcular el volumen de producción de la línea de la fabricación de calzado femenino en la empresa Linda S.R.L-Trujillo | es_PE |
dc.type | info:eu-repo/semantics/bachelorThesis | es_PE |
thesis.degree.level | Título Profesional | es_PE |
thesis.degree.grantor | Universidad Privada Antenor Orrego. Facultad de Ingeniería | es_PE |
thesis.degree.name | Ingeniero Industrial | es_PE |
thesis.degree.discipline | Ingeniería Industrial | es_PE |
dc.subject.ocde | https://purl.org/pe-repo/ocde/ford#2.11.04 | es_PE |
renati.advisor.orcid | https://orcid.org/0000-0003-2876-9746 | es_PE |
renati.author.dni | 74555080 | |
renati.advisor.dni | 17805012 | |
renati.type | https://purl.org/pe-repo/renati/type#tesis | es_PE |
renati.level | https://purl.org/pe-repo/renati/level#tituloProfesional | es_PE |
renati.discipline | 722026 | es_PE |
renati.juror | Landeras Pilco, María Isabel | |
renati.juror | León Culquichicón, Jorge Iván | |
renati.juror | Rodríguez Salvatierra, Daniel Baltazar | |
dc.publisher.country | PE | es_PE |