dc.description.abstractLa ejecución del proyecto “MEJORAMIENTO DE LA AV. LUIS ORMEÑO DISTRITO DE CASMA, PROVINCIA CASMA, DEPARTAMENTO ANCASH”, formar parte de la red vecinal de la Ciudad de Casma. El proyecto planteado con los estudios realizados indica que en la actualidad la pista de la Av. Ormeño, tienen un nivel de transitabilidad vial y peatonal inadecuado, es decir que cuenta con vías asfaltadas en pésimas condiciones en mal estado, y de tal modo que hasta la Red de Agua y Alcantarillado (Desagüe) se encuentra ya vencida con el ciclo de vida útil con el periodo. Es por ello que hemos decidido implementar y aplicar el Last Planner System, para comparar los tiempos de ejecución de las principales partidas de la obra. Esta aplicación nos ayuda a mejorar los tiempo de productividad en la mano de obra en la cual veremos ahorro en gasto, un trabajo adecuado y sobre todo que este planificado y agilizado en la ejecución, sin atrasos alguno. La investigación a estudiar cuenta con un área de 5mil m2 en la cual nosostros hemos decididos evaluar las partidas con mayor incidencia como la partida de veredas (concreto y encofrado) para la cual está en la fase de ejecución. En conclusión el principal uso del Last Planner System es que mejoro de manera significativa la productividad en la construcción del proyecto: Mejoramiento de la transitabilidad de la Av Luis Ormeño, Casma – Casma – Ancash, llegando a ejecutarse al 100 % las partidas planteadas y haber cumplido con las metras proyectadas en la obra..es_PE
dc.description.abstractThe execution of the project “IMPROVEMENT OF AV. LUIS ORMEÑO DISTRICT OF CASMA, CASMA PROVINCE, ANCASH DEPARTMENT“, as part of the neighborhood network of the city of Casma. The project proposed with the studies carried out indicates that at present the Ormeño Avenue roadway has an inadequate level of road and pedestrian trafficability, that is to say that it has asphalt roads in terrible conditions in poor condition, and in such a way that even the Water and Sewage Network (Drainage) is already expired with the useful life cycle with the period. That is why we have decided to implement and apply the Last Planner System, to compare the execution times of the main items of the work. This application helps us to improve the productivity time in the labor force in which we will see savings in expenses, an adequate work and above all that it is planned and expedited in the execution, without any delays. The research to be studied has an area of 5,000 m2 in which we have decided to evaluate the items with the highest incidence such as sidewalks (concrete and formwork) and pavement (base, subbase, asphalt binder), for which they are in the execution phase. In conclusion, the main use of the Last Planner System is that it significantly improved the productivity in the construction of the project: Improvement of the trafficability of Luis Ormeño Avenue, Casma - Casma - Ancash, reaching 100% of the planned items and having fulfilled the projected metras in the work.en_US
dc.description.uriTesises_PE
dc.formatapplication/pdfes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada Antenor Orrego - UPAOes_PE
dc.relation.ispartofseriesT_CIV_2127;
dc.rightsinfo:eu-repo/semantics/openAccesses_PE
dc.rights.urihttps://creativecommons.org/licenses/by/4.0/es_PE
dc.sourceUniversidad Privada Antenor Orregoes_PE
dc.sourceRepositorio institucional - UPAOes_PE
dc.subjectLast Planner Systemes_PE
dc.subjectTransitabilidades_PE
dc.subjectGestión de Proyectos de la Construcciónes_PE
dc.titlePropuesta de mejora para disminuir los tiempos de ejecución en el proyecto: Mejoramiento del servicio de transitabilidad de la Av. Luis Ormeño, Casma - Casma – Ancash, aplicando el Last Planner Systemes_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.grantorUniversidad Privada Antenor Orrego. Facultad de Ingenieríaes_PE
thesis.degree.nameIngeniero Civiles_PE
thesis.degree.disciplineIngeniería Civiles_PE
dc.subject.ocdehttp://purl.org/pe-repo/ocde/ford#2.01.01es_PE
renati.advisor.orcidhttps://orcid.org/0000-0001-5207-4421es_PE
renati.author.dni73657864
renati.author.dni7293043
renati.advisor.dni18192316
renati.typehttp://purl.org/pe-repo/renati/type#tesises_PE
renati.levelhttp://purl.org/pe-repo/renati/level#tituloProfesionales_PE
renati.discipline732016es_PE
renati.jurorVega Benites, Jorge Antonio
renati.jurorVargas López, Segundo
renati.jurorPanduro Alvarado, Elka
dc.publisher.countryPEes_PE


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(es)

Mostrar el registro sencillo del ítem

info:eu-repo/semantics/openAccess
Excepto si se señala otra cosa, la licencia del ítem se describe como info:eu-repo/semantics/openAccess