Mostrar el registro sencillo del ítem

dc.contributor.advisorGeldres Sánchez, Carmen Lucia
dc.contributor.authorPérez Villanueva, Marco Antonio
dc.contributor.authorCampos Paredes, Wilson Diego
dc.creatorPérez Villanueva, Marco Antonio
dc.date.accessioned2023-08-21T19:38:24Z
dc.date.available2023-08-21T19:38:24Z
dc.date.issued2023
dc.identifier.urihttps://hdl.handle.net/20.500.12759/11049
dc.description.abstractLa presente investigación tuvo por objetivo determinar en qué medida el rendimiento de la mano de obra y maquinaria se desvió del estimado en la planificación de presupuesto, en la rehabilitación de la infraestructura del Colegio Modelo, Trujillo-2022. La investigación fue aplicada, cuantitativa, de diseño descriptivo comparativo. La muestra estuvo compuesta por las partidas de estructuras durante el desarrollo de la rehabilitación de la infraestructura del colegio Modelo, Trujillo-2022. Como instrumento se utilizó la ficha de observación donde se compara los rendimientos y costos presupuestados con los rendimientos y costos reales. Los resultados nos permiten concluir: Se determinó el rendimiento de mano de obra el mismo que fue en general del 95 % de lo presupuestado en el expediente (tabla 8), en el caso de la partida de acero el rendimiento real frente al presupuestado fue 4% mayor (tabla 13) . En la partida de concreto el rendimiento real frente al presupuestado fue 29% mayor (tabla 16), en la partida de encofrado el rendimiento real frente al presupuestado fue del 85% (tabla 19), apreciándose que el rendimiento global estuvo muy cerca del planificado (95%), debido a que unas partidas compensaron el retraso de otras, y los retrasos debido a la pandemia, y aspectos contractuales de la administración pública. Respecto a los costos de mano de obra, para la partida de concreto se incrementaron 20% (tabla 20), para el concreto armado, se incrementaron en 37% (tabla 21), y para el acero se incrementaron en 9% (tabla 22), esto debido a que la mano de obra fue afectada por asuntos coyunturales, y se tuvo que acudir a concreto pre mezclado en algunos casos. Respecto a los costos de maquinaria, para la partida de se incrementaron en 7% (tabla 20), para la partida de concreto armado 6% (tabla 21), y para la partida de acero 2% (tabla 22), esto debido a retrasos coyunturales de acceso ya que la obra está en vías urbanas muy concurridas que ocasionaba retrasos. Respecto a los costos unitarios, estos se incrementaron en 13% para la partida de concreto (tabla 20), 22% para la partida de concreto armado (tabla 21) y 5% para la partida de acero (tabla 22), por factores coyunturales de incremento de precios y costos logísticos post pandemia.es_PE
dc.description.abstractThe objective of this investigation was to determine to what extent the performance of labor and machinery deviated from the estimate in budget planning, in the rehabilitation of the infrastructure of the Model School, Trujillo-2022. The research was applied, quantitative, of comparative descriptive design. The sample consisted of the items of structures during the development of the rehabilitation of the infrastructure of the Modelo school, Trujillo-2022. The observation sheet was used as an instrument where the budgeted yields and costs are compared with the actual yields and costs. The results allow us to conclude: The labor performance was determined, which was generally 95% of what was budgeted in the file (table 8), in the case of the steel item, the real performance compared to the budgeted was 4 % higher (table 13) . In the concrete item, the real yield compared to the budgeted was 29% higher (table 16), in the formwork item the actual yield compared to the budgeted was 85% (table 19), appreciating that the overall yield was very close to the planned (95%), due to the fact that some items compensated for the delay of others, and the delays due to the pandemic, and contractual aspects of the public administration. Regarding labor costs, for the concrete item they increased by 20% (table 20), for reinforced concrete, they increased by 37% (table 21), and for steel they increased by 9% (table 22 ), this is due to the fact that the workforce was affected by temporary issues, and it was necessary to resort to pre-mixed concrete in some cases. Regarding the costs of machinery, for the item of they increased by 7% (table 20), for the item of reinforced concrete 6% (table 21), and for the item of steel 2% (table 22), this due to short-term access delays since the work is on very crowded urban roads that caused delays. Regarding unit costs, these increased by 13% for the concrete item (table 20), 22% for the reinforced concrete item (table 21) and 5% for the steel item (table 22), due to conjunctural factors price increases and post-pandemic logistics costs.en_US
dc.description.uriTesises_PE
dc.formatapplication/pdfes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada Antenor Orregoes_PE
dc.relation.ispartofseriesT_CIVIL_2259
dc.rightsinfo:eu-repo/semantics/openAccesses_PE
dc.rights.urihttps://creativecommons.org/licenses/by/4.0/es_PE
dc.sourceUniversidad Privada Antenor Orregoes_PE
dc.sourceRepositorio institucional - UPAOes_PE
dc.subjectConstrucciónes_PE
dc.subjectspaMano de Obraes_PE
dc.titleEvaluación del rendimiento de mano de obra y maquinaria en la rehabilitación de la infraestructura del Colegio Modelo, Trujillo-2022es_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.grantorUniversidad Privada Antenor Orrego. Facultad de Ingenieríaes_PE
thesis.degree.nameIngeniero Civiles_PE
thesis.degree.disciplineIngeniería Civiles_PE
dc.subject.ocdehttp://purl.org/pe-repo/ocde/ford#2.01.00es_PE
renati.advisor.orcidhttps://orcid.org/0000-0003-2772-4829es_PE
renati.author.dni72445547
renati.author.dni72955670
renati.advisor.dni41356105
renati.typehttp://purl.org/pe-repo/renati/type#tesises_PE
renati.levelhttp://purl.org/pe-repo/renati/level#tituloProfesionales_PE
renati.discipline732016es_PE
renati.jurorMedina Carbajal, Lucio Sigifredo
renati.jurorMerino Martinez, Marcelo Edmundo
renati.jurorSalazar Perales, Álvaro Fernando
dc.publisher.countryPEes_PE


Ficheros en el ítem

Thumbnail
Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(es)

Mostrar el registro sencillo del ítem

info:eu-repo/semantics/openAccess
Excepto si se señala otra cosa, la licencia del ítem se describe como info:eu-repo/semantics/openAccess