dc.contributor.advisor | Chan Heredia, Miguel Angel | |
dc.contributor.author | Alvarado Saldarriaga, Cristhian Jesus | |
dc.contributor.author | Arrese Herrera, Peter Joseph | |
dc.creator | Alvarado Saldarriaga, Cristhian Jesus | |
dc.date.accessioned | 2024-08-27T22:11:16Z | |
dc.date.available | 2024-08-27T22:11:16Z | |
dc.date.issued | 2024 | |
dc.identifier.uri | https://hdl.handle.net/20.500.12759/39751 | |
dc.description.abstract | En la presente investigación se ha trabajado la implementación de la metodología
BIM y la productividad que tiene está, tomando como modelo una vivienda
multifamiliar diseñada con la metodología BIM. Lo que se pretende en dicha
investigación es conocer más sobre la productividad de esta metodología que
busca optimizar tiempos, costos y hacer dinámico el trabajo con los diferentes
softwares y colaboradores.
Para la realización de este proyecto se realizó el diseño arquitectónico con todos
los acabados, exigencias y cambios del cliente, lo cual se ha desarrollado con lo ya
establecido con el cliente. Además, se realizó el pre dimensionamiento estructural
según el requerimiento arquitectónico, parámetros urbanísticos y consideraciones
de cimentación, esto nos lleva a ya tener un modelado a nivel LOIN 2.
Posteriormente se realizó el análisis estructural el cual se tomó del modelado 3D
para ser ejecutado en el software este análisis 3D nos brindara los nuevos
parámetros sobre dimensiones, ubicaciones y cuantías estructurales necesarias
para el funcionamiento estático y dinámico estructural, en esta etapa se evidencia
el dinamismo de trabajar con estas herramientas ya que estos cambios son
sencillos de hacer y aplicar tanto estructural y arquitectónicamente. Luego se
procedió a realizar las instalaciones sanitarias de agua fría y desagüe, en este
punto se evidencian las interferencias ya que se trabaja sobre el modelado
estructural y arquitectónico, procurando que estas instalaciones se den de manera
correcta y no obstaculice al momento de ejecutar el proyecto, siendo en la etapa de
diseño donde se ven todo este tipo de interferencias o condiciones de la
construcción.
Para evaluar el proceso y coordinar nuevas decisiones del proyecto se realizaron
visitas al cliente. Y al terminar el proyecto se le realizo un formulario y una entrevista
donde quedo satisfecha con el proyecto terminado.
Finalmente, se realizará un análisis comparativo entre la Metodología BIM con el
sistema tradicional. Obteniendo como pros en la metodología BIM: Procedimientos,
Tiempo, Costos, Presentación al Cliente, Exigencias o cambios del cliente y etapa
de construcción | es_PE |
dc.description.abstract | In this research, we have worked on the implementation of the BIM methodology
and its productivity, taking as a model a multi-family home designed with the BIM
methodology. What is intended in this research is to learn more about the
productivity of this methodology that seeks to optimize time, costs and make work
dynamic with different software and collaborators.
To carry out this project, the architectural design was carried out with all the client's
finishes, demands and changes, which has been developed with what was already
established with the client. In addition, the structural pre-sizing was carried out
according to the architectural requirement, urban parameters and foundation
considerations, this leads us to already have a LOIN 2 level modeling.
Subsequently, the structural analysis was carried out which was taken from the 3D
modeling to be executed in the software this 3D analysis will provide us with the
new parameters on dimensions, locations and structural quantities necessary for
static and dynamic structural functioning. At this stage the dynamism of working with
these tools is evident since these changes are easy to make and apply both
structural and architecturally. Then the sanitary installations of cold water and
drainage were carried out, at this point the interferences are evident since the
structural and architectural modeling is being worked on, ensuring that these
installations are given correctly and do not hinder the execution of the project, being
in the design stage where all these types of interferences or construction conditions
are seen.
To evaluate the process and coordinate new project decisions, visits were made to
the client. And at the end of the project, a form and an interview were completed
where she was satisfied with the finished project.
Finally, a comparative analysis will be carried out between the BIM Methodology
and the traditional system. Obtaining as pros in the BIM methodology: Procedures,
Time, Costs, Presentation to the Client, Client demands or changes and
construction stage | es_PE |
dc.description.uri | Tesis | es_PE |
dc.format | application/pdf | es_PE |
dc.language.iso | spa | es_PE |
dc.publisher | Universidad Privada Antenor Orrego | es_PE |
dc.relation.ispartofseries | T_CIVILP_085 | |
dc.rights | info:eu-repo/semantics/openAccess | es_PE |
dc.rights.uri | https://creativecommons.org/licenses/by/4.0/ | es_PE |
dc.subject | Ciclo BIM | es_PE |
dc.subject | Metodologia BIM | es_PE |
dc.title | Diseño 3D de una vivienda multifamiliar con herramientas BIM en la Villa La Rinconada, 26 de octubre, Piura 2024 | es_PE |
dc.type | info:eu-repo/semantics/bachelorThesis | es_PE |
thesis.degree.grantor | Universidad Privada Antenor Orrego. Facultad de Ingenieria | es_PE |
thesis.degree.name | Ingeniero Civil | es_PE |
thesis.degree.discipline | Ingenieria Civil | es_PE |
dc.subject.ocde | https://purl.org/pe-repo/ocde/ford#2.01.00 | es_PE |
renati.advisor.orcid | https://orcid.org/0000-0001-9315-8496 | es_PE |
renati.author.dni | 71689595 | |
renati.author.dni | 71870661 | |
renati.advisor.dni | 18166174 | |
renati.type | https://purl.org/pe-repo/renati/type#tesis | es_PE |
renati.level | https://purl.org/pe-repo/renati/level#tituloProfesional | es_PE |
renati.discipline | 732016 | es_PE |
renati.juror | Ramal Montejo, Rodolfo Enrique | |
renati.juror | Principe Reyes, Roger Alberto | |
renati.juror | Valdiviezo Castillo, Krissia del Fatima | |
dc.publisher.country | PE | es_PE |