Mostrar el registro sencillo del ítem

dc.contributor.advisorMuller Solon, Jose Antonio
dc.contributor.authorTrigoso Abanto, Joseph Steven
dc.creatorTrigoso Abanto, Joseph Steven
dc.date.accessioned2021-12-07T14:50:21Z
dc.date.available2021-12-07T14:50:21Z
dc.date.issued2021
dc.identifier.urihttps://hdl.handle.net/20.500.12759/8362
dc.description.abstractLa presente investigación tuvo como finalidad desarrollar un sistema de gestión de stock (SGS) para disminuir los costos de inventarios del almacén central de la Universidad Privada Antenor Orrego. Se tuvo como problema que el almacén central, no tenía desarrollado un sistema de gestión de stock, este resultado se obtuvo luego de haber realizado un check list para evaluar el nivel de cumplimiento, cuyo resultado fue de 43%, así mismo durante los 8 primeros meses del estudio, se tuvo un total de bienes atendidos por S/ 208,731.00, a diferencia de los bienes almacenados que fue igual a S/ 1´453,837.00, observando elevados costos de inventarios, y la falta de control de estos. Para el desarrollo se consiguió datos históricos desde el año 2016 al 2019 de la demanda de los bienes del almacén central, es así que se realizó el análisis ABC, el cual permitió determinar los bienes de más alta rotación y valor monetario, de modo que los bienes de la clase “A”, fueron seleccionados como objeto de estudio. Después se procedió a calcular el coeficiente de variación, el cual determinó que aquellos bienes que estén por debajo del valor 0.20, se desarrollen con el modelo EOQ y aquellos bienes que presenten un valor superior a los 0.20, se desarrollen con el modelo de revisión periódica “P”. Posteriormente se pronosticó la demanda de dichos bienes, para ello se desarrollaron los métodos de: regresión lineal, promedio móvil y suavización exponencial, eligiendo así aquel método que presente un menor error en los indicadores MAD, MSE y MAPE. Entonces se determinaron los siguientes costos: mantenimiento, pedido y orden. Para finalizar se evaluó el impacto económico del sistema, calculando el ahorro y la rentabilidad, como ahorro se obtuvo un monto de S/ 61,026.78 y con respecto a la rentabilidad, ésta logró aumentar en un 35.07% para el año 2020, debido a que se desarrolló un sistema de gestión de stock, en donde se calculó la cantidad optima de pedido, el stock de seguridad, el punto de reorden y el periodo de revisión.es_PE
dc.description.abstractThe purpose of this research was to develop a stock management system (SGS) to reduce inventory costs in the central warehouse of the Antenor Orrego Private University. The problem was that the central warehouse had not developed a stock management system, this result was obtained after having carried out a check list to evaluate the level of compliance, the result of which was 43%, also during the first 8 months of the study, there was a total of outputs for S / 208,731.00, unlike the average inventory that was equal to S / 1´453,837.00, observing high inventory costs, and the lack of control of these. For the development, historical data was obtained from 2016 to 2019 of the demand for the goods of the central warehouse, thus, the ABC analysis was carried out, which allowed determining the goods with the highest turnover and monetary value, so that the Class “A” goods were selected as the object of study. Afterwards, the coefficient of variation was calculated, which determined that those goods that are below the value 0.20, are developed with the EOQ model and those goods that have a value greater than 0.20, are developed with the periodic review model “P“. Subsequently, the demand for said goods was forecast, for this the methods of linear regression, moving average and exponential smoothing were developed, thus choosing the method that presents a lower error in the MAD, MSE and MAPE indicators. The following costs were then determined: maintenance, order, and order. Finally, the economic impact of the system was evaluated, calculating savings and profitability, as savings an amount of S/ 61,026.78 was obtained and with respect to profitability, it managed to increase by 35.07% for the year 2020, because developed a stock management system, where the optimal order quantity, the safety stock, the reorder point, and the review period were calculated.en_US
dc.description.uriTesises_PE
dc.formatapplication/pdfes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada Antenor Orrego - UPAOes_PE
dc.relation.ispartofseriesT_ING.IND_160
dc.rightsinfo:eu-repo/semantics/openAccesses_PE
dc.rights.urihttps://creativecommons.org/licenses/by/4.0/es_PE
dc.sourceUniversidad Privada Antenor Orregoes_PE
dc.sourceRepositorio Institucional - UPAOes_PE
dc.subjectSistema de gestión de stockes_PE
dc.subjectDisminución de los costos de inventarioses_PE
dc.titleSistema de gestión de stock para disminuir los costos de inventarios del almacén central de la Universidad Privada Antenor Orregoes_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.grantorUniversidad Privada Antenor Orrego. Facultad de Ingenieríaes_PE
thesis.degree.nameIngeniero Industriales_PE
thesis.degree.disciplineIngeniería Industriales_PE
dc.subject.ocdehttp://purl.org/pe-repo/ocde/ford#2.11.04es_PE
renati.advisor.orcidhttps://orcid.org/0000-0001-7273-2882es_PE
renati.author.dni70196893
renati.advisor.dni17812491
renati.typehttp://purl.org/pe-repo/renati/type#tesises_PE
renati.levelhttp://purl.org/pe-repo/renati/level#tituloProfesionales_PE
renati.discipline722026es_PE
renati.jurorVelazquez Contreras, Segundo Manuel
renati.jurorUrraca Vergara, Elena Matilde
renati.jurorCastillo Miranda, Victor Manuel del
dc.publisher.countryPEes_PE


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(es)

Mostrar el registro sencillo del ítem

info:eu-repo/semantics/openAccess
Excepto si se señala otra cosa, la licencia del ítem se describe como info:eu-repo/semantics/openAccess